Loading…
Loading…
5,458 results • Best match
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.
Sub Head Formation Cutting, Protection works, Cross- Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.
Construction of Passing places, Cross Drainage, side drain, Parapets, Crash Barrier,Tarring work and road signs etcetra including routine maintenance for five years).
P/L soling (WBM grade-1) km 0/765 to 2/00 AND Metalling and tarring in km 0/0 to 2/0
Formation Cutting ,Passing Places, R/Wall, C.D Works , GSB, WBM-II, WBM-III,Tarring Work, Side Drain , and Parapets)(Under Nabard RIDF-XXXI
Const. of R/wall, CC Pavement, U-shape Drain and Providing and laying metaling and Tarring at Rd 0/750 to 1/415).
(SH C/O Passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, cement concrete pavement, side drain and parapets)
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance)
Improvement, Passing places Missing Cross Drainage, side drain Parapets Crash barrier CC Pavement, Tarring and road signs etc. including five year routine maintenance
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone, Dumping Sites etc.
Formation Cutting, Passing places, Cross Drainage, side drain, Parapets, CC Pavement, Tarring work and road signs etcetra including routine maintenance for five year)
(SH- F/C 5/7mtr wide road cross drainage, protection work, metalling and tarring, side drain, parapet km 0/0 to 9/950)
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetera including five year routine maintenance)
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance).
C/O R/Walls, missing C.D. work, WBM-II, WBM-III, Tarring, side drain and Parapets in Km 0/00 to 4/270 )
(SH Formation cutting, Passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, cement concrete pavement, side drain and parapets)
Formation cutting, C/o passing place, Side Drain, Parapets, Tarring work and five year maintenance under PMGSY-IV Package No HP-09-787
(Sub Head- Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance
(Sub Head- Formation Cutting, Construction of Passing Places, Side Drain, Parapets, Cross drainage, Metalling and Tarring work etcetra including five year routine maintenance)
(SH-Improvement, Passing places, Missing Cross Drainage work, side Drain, Parapet, Crash Barrier, C.C. Pavement tarring and road signs, etc. including 5 year)
Formation Cutting, Passing Places, R/wall, B/wall, CD works, GSB, WBM-II, WBM-III, Tarring work , Side drain, Parapets. Under RIDF-XXVI
Formation Cutting, Passing places, Cross Drainage, side drain, Parapets, CC Pavement, Tarring work and road signs etcetra including routine maintenance for five year)
/L Metalling tarring, C/o PCC U-shaped drain and 3.00 Mtr. Span RCC Box culvert at Rd 52/585 to 52/560).
(SH Formation Cutting passing places, R/walls ,C.D. works GSB, WBM-II, WBM-III tarring work side drain and parapets) under NABARAD RIDF-XXX).
SH Construction of 5/7 metre wide road formation cutting/ROFD CD Soling GSB and Metalling/Tarring in km 0/0 to 0/750
(SH- Formation cutting, passing, R/walls C.D. work, GSB, WBM-II, III, Tarring work Side drain, parapets and CC pavement) (Under NABARD RIDF-XXIX).
Improvement , Passing Places, R/Walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, side drain, cement concrete pavement, Interlocking paver block and parapets
Formation cutting, passing place, retaining walls, cross drainage work, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
Providing and Laying WBM-GII and Tarring work in damaged Berms at Km 0/0 to 1/0 and 2/0 to 3/0
SH Providing Metalling and Tarring in extended portion (shoulder / berms) from New Bus Stand to Suni Bazzar in Km. 46/645 to 47/435
P/L, metaling/ Tarring in kms 7/500 to 7/650 and U-shape drain at various RDs between 7/500 to 7/650
SH- Construction of passing places, Cross Drainage, Side drains, parapets, Crash barrier, Tarring work and road signs etcetra including routine maintenance for five year.
SH- Construction of passing places, Cross Drainage, Side drains, parapets, Crash barrier, Tarring work and road signs etcetra including routine maintenance for five year.
Metalling and Tarring, V-shape Drain, Essential Parapets and Bio Engineering etc. Under PMGSY Batch-I 2017-18, Stage-II, Package No.HP-08-418.
Metalling and Tarring, Retaining Walls, Breast Walls, CD Works, Road Side Drain, Parapets, Logo Boards and Routine Maintenance 5 years Package No.HP-08-528.
5/7 mtr. Wide formation cutting, R/wall cause way, C.D. GSB, WMM and tarring, V-Shape drain, Parapets, sign boards and Km. stone).
R.O.F.D. including cross drainage works, Metalling Tarring, Side drain, Parapets and road sign boards and 4 Nos Box cell bridge including five years maintenance
(SH Formation cutting, Passing places, R/Walls, Cross drainage work, GSB, WBM-II, WBM-III, Tarring work, Side drain, parapets and cement concrete pavement).
ROFD, Construction Of R.walls, Cross drainage work, Metalling and Tarring, Providing Safety measures and Construction Of V-Shape drain in Km. 7.500 to 10.00
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
Providing and laying Grading-I, Grading-II at R.D. 4/330 to 4/570 and Metalling tarring at R.D. 3/815 to 4/570
Formation cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, side drain and parapets including 40 mtr span Bridge
( Improvement, passing places, missing cross drainage, side drain, parapets,crash barrier,CC pavement , Tarring and road signs etcetera including five year routine maintenance) under
P/L G-I,G-II and Mettaling and Tarring of road in km. 0/00 to 0/180, 1/00 to 2/345
C/O 900mm dia hume pipe culvert at RD. 0/750 and Metalling and Tarring in km. 0/00 to 0/860).(Under SCSP).
(SH - C/O Passing place, R/Wall, Cross Drainage work, GSB, WBM-II, WBM-III Tarring work, Cement concrete pavement, side drain and parapets)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
SH Metalling Tarring, Retaining wall, Breast wall, cross drainage, PCC Drain, CC Pavement, Imp. of curves, setting Out, Parapet and 5 year routine maintenance
ROFD CD work retaining wall Gabion walls Metaling Tarring Paneled Cement Concrete Pavement construction of road side drains Parapets Crash Barriers Road Safety Measures