Loading…
Loading…
5,459 results • Best match
ROFD CD work retaining wall Gabion walls Metaling Tarring Paneled Cement Concrete Pavement construction of road side drains Parapets Crash Barriers Road Safety Measures
ROFD, CD work, retaining wall, Gabion walls, Metaling Tarring, Panelled Cement Concrete Pavement, construction of road side drains, Parapets, Crash Barriers, Road Safety Measures
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
ROFD, Construction of R.walls, Cross drainage work, Metalling and Tarring, Providing Safety measures and Construction of V-Shave drain in Km. 0.0 to 2.500
SH C/O HP Culvert at RD 0/040 CC drain providing and laying metalling and tarring in km 0/0 to 0/570
Formation cutting Retaining wall Breast wall cross drainage Mettaling Tarring Precast concrete paver block RCC drain parapets and road furniture including five year maintenance
SH- Formation cutting R/wall B/wall C.D work, drain Metalling and Tarring and dumping site etcetera between km 1/500 to 2/500
Removal of deficiency, P/L Metalling and tarring work, Retaining wall, Breast wall, crate work, HP culvert and 2.00 metre span RCC slab culvert
SH Construction of Retaining walls,construction of road side V-Shape drain,and Metalling and Tarring in between km 6/00 to 6/400
SH-C/o ROFD, Protection Work, Cross drainage work, Metalling and Tarring, Panelled concrete Pavement, FDR, Road side drain, Road Furniture and Dumping Structure.
ROFD, CD work, retaining wall, Gabion walls, Metaling Tarring, Panelled Cement Concrete Pavement, construction of road side drains, Parapets, Crash Barriers, Road Safety Measures
Sub Head Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc.
Sub Head ROFD, protection works, Cross drainage works, Metalling and tarring, Road Side Drain, Crash Barrier, Parapets, Road safety km stone, Dumping site etc.
Metalling and Tarring, Retaining Walls, Breast Walls, CD Works, Road Side Drain, Parapets, Logo Boards and Routine Maintenance 5 years Package No.HP-08-526.
Providing and Laying Metalling Tarring in Km 1/00 to 2/00 and Construction of Unlined drain in Km 1/00 to 2/00)
Providing and laying wearing Grade-II in Km. 11/600 to 12/475 and BUSG, Bituminous concrete 30mm thick in Km. 11/0 to 11/765 and 11/870 to 13/0, cement concrete pavement in Km. 11/765 to 11/870 and V-shape drain between Km. 11/0 to 11/800
Providing and laying 30mm single layer bituminous concrete (HP0410VR008218203) km. 0/0 to 1/0, 1/0 to 2/0 , 2/0 to 2/420 and interlocking pavers block at RD 0/190 to 0/250, 0/390 to 0/440, 0/770 to 0/860 and 1/540 to 1/570
(ii) AMP on Link road to village Lingwin km 1/0 to 3/260 (VR038). (iii) AMP on Patta Jalari to Mann km 3/0 to 3/330 (VR0092). (iv) AMP on Lambloo Sikander road via Jhatwar km 0/0 to 1/0 (VR065). (SH P/L 30mm thick Bituminous Concrete 80mm thick
(SH- Providing and laying GSB and WMM in km. 0/750 to 1/0 and 2/0 to 2/060, providing and laying WMM for repair of pot holes in km. 0/0 to 0/750 and 25mm thick Bituminous concrete in km.0/0 to 0/900). Under MMSY year 2024-25.
AMP for the year 2023-24 for rural roads (SH Providing and laying 30mm thick bituminous concrete on Gugga Mohra to Muchhwan road km 0/0 to 3/200 ) (B.C in km 0/0 to 1/090, 1/150 to 3/200 and C.C. paver block 80mm thick in km 1/0
Providing and Laying bituminous concrete 30mm thick in km. 0/0 to 2/500,0/0 to 2/0,0/0 to 1/0 ,0/0 to 1/0,0/0 to 0/975 and 0/0 to 1/0 Respectively) DRRP No. HP-03-03 VR0109,VR0072,VR0076,VR0093,VR0086 and VR00120 )with paver finisher
Providing and laying 30mm single layer bituminous concrete (HP0410VR008218203) km. 0/0 to 1/0, 1/0 to 2/0 , 2/0 to 2/420 and interlocking pavers block at RD 0/190 to 0/250, 0/390 to 0/440, 0/770 to 0/860 and 1/540 to 1/570
SGOT Kit, SGPT Kit, Alk. Phosphate Kit, Sodium citrate, Waterbath, PTI Kit, Glucose Kit, Thermometer, RA Factor Kit, Anti Serra A, Anti Serra B, Anti Serra D, Widal Kit, Uric Acid Kit, Creatinine Kit, Red Top Tubes, Black Top Tubes Sodium Citrate, Tube Rack Plastic, X-Ray Films, Developer Powder, Fixer Powder, Lead marker
Formation cutting ,construction of passing places ,side drain, parapets, cross drainage, sell filled Cc pavement, metalling and tarring work exctra including five year routeen maintenance
Formation cutting, Retaining Structure Cross drainage work Granular Sub-Base, WMM Metalling and Tarring, Shoulders V shape side drain Road side essential parapets Road Signages
Formation cutting work, C/O R/Walls, 1.00 mtr span RCC culvert, U-Shape drain, Parapets, mettaling and tarring and cement concrete pavement road etc
Formation Cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain and parapets) (Under NABARD RIDF-XXVI)
P/L GSB, G-II, Metalling Tarring at RD 0/0 to 0/500 and CC pavement at RD 0/500 to 0/700)OTMNP
c/O Berghat to Gunai road in km 0/0 to 10/900 SH P/l Tarring work in km 9/150 to 10/900
SH C-O 900 mm dia hume pipe culvert at RD 0-660 and Metalling AND Tarring km 0-0 to 0-400 under OTMNP
ROFD, Protection work, Cross Drainage Works, Metalling and Tarring, Panelled Concrete pavement, Road Furniture and dumping structure) at RD 0/000 to 14/070 km)
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling and Tarring, Construction of Road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure.
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
(SH C/O 30.00mtr span bridge, formation cutting, passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, side drain and parapets)
Formation cutting , Passing place , R/walls, Cross Drainage Works, Parapets, Road Side drain,GSB, WBM-II, WBM-III and Metalling Tarring). (Under NABARD RIDF-XXVI).
Removal of formation deficiency ,R/wall, C.D.GSB,G-II,G-II and tarring ,V-shape drain,Crash barrier and parapets etc. Under Nabard RIDF-XXV
Construction of R/Walls, B/walls and Providing and Laying WBM Gr.I, Gr.II and tarring work in km. 0/500 to 0/800 Under PDNA
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling Tarring, Construction of road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure etc
Sub Head ROFD, Protection work, Cross-Drainage works, Metalling and Tarring, Construction of Road side drains, Crash Barriers, Parapets, Road Safety Measures and Dumping Structure.
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
formation cutting, R/wall, C.D. soling ,wearing ,Tarring ,Parapets, V-Shape drain and 2 Nos 10.00 mtr span RCC slab culverts ) Under Nabard RIDF-XXV).
ROFD, Protection work, Cross Drainage Works, Metalling and Tarring, Panelled Concrete pavement, Road Furniture and dumping structure at RD 0/000 to 21/185 km
IMPROVEMENT/ WIDENING IN KM. 0/450 TO 0/825 AND P/L METALLLING TARRING IN KM. 0/250 TO 0/750) (UNDER O.T.M,N.P HEAD).
Providing and Laying Metalling and Tarring in approaches portion preparation of subgrade and P/L WBM G-I, G-II, G-III and parapets etc.
Formation cutting , R/wall,B/wall, CD works, Mettaling and tarring, V-shape Drain, Parapets and Sign board in Km 0/0 to 3/960
(SH - C/O 40.00mtr span bridge, formation cutting, passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, side drain and parapets).
construction of edge wall, U shape drain and parapets, P/L GSB, Gr-II, Gr-III and Tarring in km 4/420 to 4/510)
Formation Cutting, C/o passing places, CD works, Side Drain, Parapats,Tarring work and five year maintenance under PMGSY-IV Package No HP-09-786