Loading…
Loading…
5,459 results • Best match
Metalling and Tarring R/wall B/walls PCC drain Parapets km Stone Setting out Metal beam un-paved shoulder and five year maintenance Package No.HP-06-145
ROFD Metalling and Tarring Earthen shoulder sign Board PCC drain Metal Beam Missing CD Parapets and five year maintenance Under PMGSY-II. Package No. HP-07-150.
Providing and laying WBM G-1, G-11 and Tarring in Km. 0/195 to 1/418, cement concrete pavement at R.D. 0/450 to 0/600)
Sub Head ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 3/425
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, and Tarring work including five year
Formation cutting, Passing places, Cross drainage works, Side drain, Parapets, cement concrete pavement and Tarring work under PMGSY, Batch-II, 2018-19 package No. HP-02-350
Formation cutting, C/o passing place, Side Drain, Parapets, Cross Drainage, Metaling and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-79
Formation Cutting, C/o passing places, Side Drain, Parapets, cross drainage, Metaling and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-86
Formation cutting, C/o passing place, Side Drain, Parapats, Cross Drainage, Metaling and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-789.
Formation cutting, C/o passing place, Side Drain, Parapets, Cross Drainage, Metaling and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-795.
Formation cutting, C/o passing place, Side Drain, Parapets, Cross Drainage, Metaling and Tarring work and five-year maintenance under PMGSY-IV Package No HP-09-794
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
Improvement, C/o Passing places, CD works, side drain, parapets, CC pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-525.
Balance work of widening between Km. 6/925 to 7/505)
Left out work of widening in Km. 5/105 to 7/495
(SH- C/O Formation cutting, cross drainage, protection work, metalling and tarring, V-Shape side drain, road furniture and dumping site in km 0/0 to 2/805)
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five years maintenance under NABARD XXVI
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Wideing of road and Retaining wall in various RDs, V-shpae Drain at Rd. 0/00 to 1/00 and Tarring 0/500 to 1/00)(Balance work
Formation cutting , R/walls, Cross Drainage Works, GSB, WBM-II, WBM-III , Tarring, Drain , Parapet and road furniture etc. including five years routine maintenance). Under NABARD RIDF-XXVII.
Widening Re-grading, C/O Retaining wall, Breast wall in Both side and Tarring etc at RD. 0/435 to 0/520)(Under Smart City in Shimla Town
Formation cutting passing places, Retaining wall, C.D. work GSB, WBM-II, WBM-III, Tarring work, side drain, parapets C.C. pavement and Sign Board etc )(Under Shimla Smart city
Formation Cutting, Protection works, Cross- Drainage works,Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGSY Pahse III Batch I
Formation Cutting, Protection works, Cross-Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGYS Phase-III, Batch-II
ROFD, Protection work, CD work, Metalling and Tarring Road, Side Drain, Crash Barrier, Parapets, Road Safety Km. Stone and Dumping Structure in Km. 0/00 to 4/720.
C/o Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets and road furniture including five year routine maintenance
Formation cutting, passing place, R/wall, CD work GSB, WBM-II, WBM-III, tarring work, side drain, parapets paver block and dumping site etc.) under NABARD-RIDF-XXIX
P/L WMM at Km 2/800 to 3/500 and Tarring in Km 2/00 to 2/550 and 2/580 to 3/500 (under OTMNP Head
Formation cutting, passing place, retaining walls, cross drainage work, GSB,WBM-II,III, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
Formation cutting, passing place, retaining walls, cross drainage work, GSB,WBM-II,III, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
ROFD for 5/7 mtr.wide road,R/wall , C.D., GSB, WMM and Tarring, Drain and Parapets in between km. 0/0 to 2/0) Under NABARD RIDF-XXV
SH Providing and laying GSB WMM and Metalling/ Tarring in km 0/500 to 1/700 and 80mm thick interlocking paver block at various RDs Under SCSP Head
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five year maintenance under NABARD-XXVI
Formation cutting, Passing place, R/Walls, Cross Drainage works, parapets, road side drain, Interlocking paver block, GSB, WBM-II, WBM-III and Metalling Tarring)( Under NABARD RIDF-XXVII)
Earth work, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
(SH- R/Wall, B/Wall, WBM G-II, side drain, Cross drainage work, Tarring, C.C. pavement, crash barrier and road signs board i/c five year R/M)
ROFD, Metalling and Tarring, R/walls, B/walls, PCC drain Hume Pipe culverts and parapets etc. and five year maintenance under PMGSY-II. Package No. HP-06-148.
Improvement, C/o passing places, missing CD, Side Drain, Parapats,Cement concrete pavement and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-781.
Formation cutting, C/o passing place, Side Drain, Parapats, Cross Drainage, Metalling a and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-791.
Formation Cutting, Protection works, Cross- Drainage works, Metalling and Tarring, Road side Drains, Crash Barrier, Parapets, Km stone and Dumping Sites etc. under PMGSY Phase-IIi, Batch-II
F/C 5/7 mtr. wide, Retaining walls, Breast walls, Dumping sites, Metalling and Tarring in Km. 0/00 to 3/380 under NABARD RIDF-XXVIII, Distt. Mandi H.P.
P/L correction layer spreading and compacting stone aggregate G-III in km. 0/0 to 2/0 and P/L tarring in km. 1/0 to 2/0
Improvement of Koftu Karala Khangtari road km 0 00 to 4 00SH Providing and laying G II G III and Metalling Tarring work km 0 000 to 1 000
Formation cutting cross drainage road side structures parapets, metaling/tarring, sing boards and 2Nos bridge i.e. Darad Khad at RD 3/383 and Manjhi Khad at RD 3/465.
SH ROFD at RD 0/300 to 0/500, Breast wall at RD 0/330 to 0/360 and Metalling and tarring in km 0/300 to 0/500
Improvement, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, C.C. Pavement, side drain, Parapets and Road side sign boards) (Under NABARD RIDF-XXVI)