Loading…
Loading…
5,459 results • Best match
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19) Package No. HP-04-395
C/O passing places missing CD side drain parapets CC pavement and Tarring work including five year maintenance under PMGSY Batch I 2018 19 Package No HP 04 373
SH-Formation cutting 5/7 mtrs wide i/c R/Wall and B/Wall, X-Drainages Work, V-Shape Drain, PCC Parapets, Mettalling and Tarring) under NABARD RIDF-XXI
ROFD, 900mm dia hume pipe culverts, B/walls, R/walls, GSB, WBM-II, WBM-III, Tarring, Parapets and V-shape drain etc. Under NABARD RIDF-XXVIII, Distt. Mandi H.P.
Improvement, C/o Passing Places, Missing CD, Side Drain, Parapets, Crash Barrier, CC Pavement and Tarring work under PMGSY-II, Batch - I, 2019-20 Package No. HP-02-07
(SW- Formation Cutting, Passing Places, R/Walls, CD Works, GSB, WBM-II, WBM-III, Tarring work, Side drain, Parapets and 40 mtrs Span Bridge including Five years routine maintenance)
Formation cutting, Passing places, Retaining wall, Cross Drainage work GSB,WBM-II, WBM-III, Tarring work, Side Drain, Parapets and road furniture etcetera including routing maintenance for five year)
Formation cutting, Passing places, R/walls, Cross Drainage, Providing and laying GSB, P/L WBM-II, WBM-III, Tarring work, Side drain, Parapets and road furniture) (Under NABARD-RIDFXXV)
Formation Cutting, C/o 4.00mtr. Span Slab Culvert, R/Wall, C.D. Work, GSB, WMM, Tarring Work, Cement Concrete Pavement, Road Side Drain in KM 34/00 to 39/180
Construction of Retaining walls, Breast walls, Wire Create Walls, Hume pipe Culvert, Road Side Drain, Parapets, Metalling and Tarring and Crash Barrier at R.D. 35/00 to 51/00
P/L and metalling/ tarring in kms 0/250 to 0/450 and 0/550 to 0/850 and cement concrete pavement at RD 0/450 to 0/550.
Improvement , C/O Passing places, Missing CD, side drain, parapets, CC pavement , Interlocking paver Block and Tarring work including five year maintenance under PMGSY-II Batch-I, 2019-20)
Improvement ,C/O Passing places, Missing CD, side drain, parapets, CC pavement , interlocking paver Block and Tarring work including five year maintenance under PMGSY-II , ( Batch-I, 2019-20)
C/O Passing places, R/wall, Missing CD works, side drain , parapets, CC pavement, B.M. and Tarring work including five year maintenance under PMGSY-II ,( Batch-I, 2019-20)
Improvement ,C/O Passing places, Missing CD, side drain, parapets, CC pavement , interlocking paver Block and Tarring work including five year maintenance under PMGSY-II ,( Batch-I, 2019-20
Formation Cutting, Passing Places, R/Walls, Missing CD work, Side Drain, Parapets, CC Pavement and Tarring including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII)
SH Improvement Passing Places Rwall CD work GSB WBM G-2 WBM G-3 Tarring work road side drain parapets and cement concrete pavement in Km 0.000 to 1.870
ROFD protection works ,Cross drainage works ,Mettalling and tarring ,Road side drain ,parapets ,Crash barriers, Road safety km stone nd dumping site etc. under PMGSY Phase-III, Batch-II
Improvement, C/o Passing places, CD works, GSB, WBM-II, Side drain, Parapets, CC Pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No.HP-08-539.
C/O R.O.F.D., Protection Work, Cross Drainage Work, Road Side Drain, Metalling and Tarring, Road Furniture and Dumping Structure in km 0/000 to 11/970.(Under RIDF-XXXI
Formation Cutting, C/o Passing Places, R/wall, B/wall, CD, Side Drain, Parapets, Cell filled CC Pavement and Metalling and Tarring work etcetera including five-year routine Maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, CD, Side Drain, Parapets, Cell filled CC Pavement and Metalling and Tarring work etcetra including five year routine maintenance)
Cutting work for removal of formation deficiency, construction of PCC retaining wall, breast wall, cross drainage work, RCC slab culvert, providing and laying WBM-I,II and III, Metalling and Taring work, road side drain and parapets
SH-P/l M/T, Cd works,R/wall, B/wall,V-shape drain, Parapets, and Kilometer stone etc)
P/L 30mm thick bituminous concrete in kms 1/0 to 1/150, 1/170 to 1/370, 1/390 to 1/675, 1/690 to 2/750, 2/800 to 2/900 and 80mm thick (ISI) marked paver block in kms 1/150 to 1/170, 1/370 to 1/390, 1/675 to 1/690 and 2/750 to 2/800
Providing and Laying bituminous concrete 30mm thick in km. 0/0 to 3/0,0/0 to 2/0,0/0 to 1/015,0/0 to 1/00,3/0 to 5/465,3/0 to 4/0,4/0 to 4/500,0/0 to 2/0 and 0/0 to 0/555 Respectively) DRRP No. HP-03-05 VR0087, VR0135, VR0006, VR0130, VR0125,VR0112,V
C/O R/wall at Rd. 4/960 to 4/980, 4/984 to 4/996, 5/015 to 5/030,5/300 to 5/315,9/00 to 9/020, P/L Bituminous concrete 30mm thick in km 4/00 to 5/00, 7/00 to 9/00,11/00 to 13/00( with paver finisher), V-shape drain at various Rds etc
AMP for the year 2023-24 for RR (SH P/L 30mm thick bituminous concrete on Junala Karloti Chhat ROAD ) (B.C in km 0/0 to 0/0 to 2/220, 2/260 TO 3/600 and 3/620 TO 5/0 and C.C. Paver block 80mm thick in km 2/220 to 2/260, 3/600 to 3/620
ROFD metaling and tarring , R/wall,B/wall, CD works, V-shape drain and parapets road furniture crash barrier and signe board under CRF Job No hp 2018-19-147
SH.C/O 5/7 mtr wide road formation cutting R.wall C.D., GSB G.IIG.III and tarring V shape drain parapets in km. 2/0 to 7/460) Under Nabard RIDF XXV
(SH - Formation Cutting, Passing Places, Retaining Wall, Cross Drainage work, Granular Sub Base, WBM-II, WBM-III, Tarring work, side drain, parapets and road furniture including five years routine maintenance)
P/L Tarring in km. 0/0 to 0/350,0/410 to 0/550 and P/L interlocking paver block at Rd. 0/350 to 0/410) Under SCSP Head
SH Removal of formation deficiency, Co passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Interlocking CC Block and Tarring work)
F/C in km. 0/0 to 0/250, R/Wall at Rd. 0/200 to 0/220, P/L GSB,WMM Tarring in km. 0/0 to 0/250)
(SH-C/O Earth Work, Protection work, Cross Drainage Work, Irrigation Pipe, Side Drain, Metalling and Tarring, Crash Barrier, Road Furniture, Dumping Work in km 0/00 to 2/400.)
Providing and Laying WBM G-I, G-II, G-III and Tarring on both side approaches of 55.00mtr. span PSC Box Girder Bridge over Gamber Khad at Km. 11/715).
Formation cutting , R/walls, Cross Drainage Works, GSB, WBM-II, WBM-III , Tarring, Drain , Parapet, Crash barrier and road furniture etcetra including five years routine maintenance Under NABARD RIDF XXVII
Formation cutting , R/walls, Cross Drainage Works, GSB, WBM-II, WBM-III , Tarring, Drain , Parapet, Crash barrier and road furniture etcetra including five years routine maintenance). Under NABARD RIDF-XXVII
Constrion of Wire Crate, 2.00 mtr, span RCC Culvert, Hume Pipe Culvert, C.C. Pavement, Drain with Edge wall and Metalling and Tarring of Kuru to Ghallour road Portion) (OFC DEPOSIT )
(SH- ROFD, R/wall, B/wall, Cross drainage works Mettaling and tarring, Crash barrier, V-shape Drain, Parapets and Logo and Sign board including five year maintenance) Under RIDF - XXVIII
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, and Tarring work including five years routine maintenance etc
SH- Formation Cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC pavement, side drain and parapets, Raod sign Board including five year routine maintenance
C/o 900mm dia hume pipe culvert at RD 1/700 with wing walls and P/L GSB,WMM and Tarring in Km. 1/910 to 2/120( Under MMGSY
Formation Cutting, C/O Passing places, Breast wall Retaining wall, Gabion wall, Missing CD, Road side Drain, parapets, Crash Barrier Road sign board Bio Engineering works and Tarring work etc.
Widening of existing Single Lane to Intermediate Lane, Extension of Cross Drainage work, Providing and Laying Metalling/Tarring and Side Drains etc. in between Km. 46/0 to 47/300).
Metalling and Tarring, R-walls B-walls, PCC drain Parapets, km Stone, Setting out, Metal Beam, Un-Paved shoulder and five year maintenance under PMGSY-II Package No.HP-06-144.
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 1/500).
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 3/300.
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 3/400.
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 6/760.