Loading…
Loading…
5,457 results • Best match
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 4/200.
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 1/900).
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 7/820.
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 11/570.
SH C/O Retaining wall, Toe Protection wall, W Metal beam Crash Barrier, Metalling and Tarring at Km. 25/00 to 26/220) under CRF Job No.CRF-HP-2023-24/188.
C/O Passing places, Missing CD, side drain , parapets, crash barrier, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19) Package No. HP-04-393
SH ROFD C/O R/wall and Brest Wall C.D. Works, Meatalling and Tarring, Drain work Parapets and Sign Board in Km. 0/0 to 1/390) Under NABARD RIDF-XXV
C/O Passing places, Missing CD, Side Drain, Parapets, Crash Barrier, C.C. Pavement and Tarring work) including five year maintenance under PMGSY, Batch-II 2018-19 Package No. HP-04-393
C/O passing places, missing CD R/wall side drain parapets CC pavement and tarring work including five years maintenance under PMGSY Batch I 2018 19 package No HP 04 372
C/o 2.00 mtr. RCC Slab Culvert at RD 0/740 and R/Wall, B/Wall and Providing and Laying Mateling, Tarring, Misc. Work at RD 0/720 to 0/770
C/O link road from Mashobra Chowk to Balika Ashram km. 0/00 to 0/430 SH Providing and laying G-III Bitumen macadam and Tarring with 25mm thick Bitumen concrete
Removal of Formation Deficiencies, R/wall, B/wall, Cross Drainage work, Metaling and tarring, Crash Barrier, Parapets, Drain and providing sign board, Logo board etc KM 0/0 to 08/500
Formation cutting, passing places, R/walls, CD Work, GSB, WBM-II, WBM-III Tarring work, Side drain and parapets etc including routine maintenance for five year after completion of construction work
P/L GSB,WMM and Tarring in km. 0/080 to 0/300, i/c both side edge walls and embankments at rd. 0/190 to 0/250) Under OTMNP Head
P/L Tarring in Km 0/225 to 0/760, C/O R/wall at Rd 0/00 to 0/015, Cement concrete pavement at Rd 0//00 to 0/100
SH Metalling and Tarring on Jail road km 0/0 to 0/400 alongwith construction of V-Shape drain and construction of retaining wall at RD 0/252 to 0/262
SH C O B Wall 0.090 to 0.105 , 0.320 to 0.330 PL Kharanja stone soling 0.285 to 0.305 Grade -2 Grade -3 tarring and PCC drain in km 0.00 to 0.375
SH Removal of formation deficiency, C/o passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Cement Concrete Pavement and Tarring work
SH ROFD, Metalling and Tarring, Earthen shoulder, sign Board, PCC drain Metal Beam Missing CD Parapets and five year maintenance Under PMGSY-II. Portion 0-4.500 Package No. HP-07-150
ROFD, R/wall, B/wall, Cross drainage works, Mettaling and tarring, Crash barrier, V-shape Drain, Parapets and Logo and Sign board including five year routine maintenance UNDER NABARD RIDF- XXVII
SH C/O Retaining wall, Toe Protection wall W Metal beam Crash Barrier, Metalling and Tarring at Km. 4/350 to 12/685) under CRF Job No.CRF-HP-2023-24/188.
SH Construction of Jeepable 3/5 metre wide Ambulance road ROFD at various RDs CD work RCCP WMM and Tarring etc in km 0/0 to 0/500 Under OTMNP Head
C/O side drain at RD 0/295 to 0/615, CD at RD 0/395, WBM-II, CC pavement and tarring work in Km 0/00 to 0/615 (MMGSY)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetera including five-year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetera including five-year routine maintenance
SH Construction of Retaining wall Breast wall Metalling and Tarring Earthen shoulder sign Board PCC V-Shape drain Metal Beam Missing CD and parapets under PMGSY-III Batch-I 2022-23
SH - Improvevment of passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC pavement, side drain and parapets including five year Routine maintenance (Under NABARD RIDF-XXVIII
Formation Cutting Construction of Retaining walls Breast walls, Culverts V-shape drain Providing and fixing W metal beam crash barrier and Providing and Laying Paver Block and metaling and Tarring work
Formation Cutting, C-o Passing Places, R-wall, B-wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
M/T on link road from Chhanjiyara to Berthin via chat km. 0/00 to 2/510 (SH P/L wearing and tarring in km. 0/500 to 1/500)(SCSP)
ROFD, R/wall, B/wall, Cross drainage, P/L GSB, WMM, Metal Tarring, Cement Concrete Pavement, side drain , parapets sign boards in Km. 0/00 to 3/450) under NABARD XXX
C/O ROFD, Cross drainage work, GSB, WMM, Tarring , Road Side V-Shape drain, Parapets and Road side sign board) (RIDF- XXVIII)(Under NABARD) (i/c 5 years of routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
SH- C/O Earth Work, Protection Work, Cross Drainage Work, V-Shape Drain, ,Metalling and Tarring , Crash Barrier, Road Safety Works and Dumping Structure in km 0/000 to 5/430.
ROFD, including R/wall, B/wall, CD works, Road side Drains, parapet, sign board, kilometer stones, G.S.B, W.B.M G-II, WBM G-III, Tarring, CC pavement etc) Under NABARD RIDF- XXVI
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
ROFD, C/O wire crates/gabion walls, R/walls, M/T, cement concrete pavement, C/O road side parapets, providing crash barriers, C/O V-shape and U- shape drains, X-drainage work including 5 year routine maintenance after completion of work
Please Refer Tender Documents
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, and Tarring work including five year routine maintenance etc
C/o 5/7mtr Formation cutting, R/walls, Cross drainage works, P/L GSB, Metalling and Tarring, Road side drain and Parapets in Km 0/0 to3/500). (Under NABARD RIDF-XXVI).
Improvement of road, R/walls, C.D. work, GSB, WBM-II, WBM-III, Tarring work,BM, CC pavement, Side Drain,parapets and road furniture ic five year routine maintenance) (under NABARD RIDF-XXXI)
Providing and laying WBM Gr.I,II and Metalling Tarring in between km. 0/00 to 1/00 and construction of Retaining walls at RDs 1/825 to 1/840) Under DMFT Deposit.
Special Repair Improvement of RCD road 0.000 to 2.00SH Extension of carriage way width at RD 0.00 to 2.00 including providing and laying GSB G II G III and metalling Tarring etc
Providing and laying wearing and tarring, providing and laying cement concrete pavement, construction of road side drain, construction breast wall, retaining walls and formation cutting between Km 0/000 to 1/500
Formation cutting, Passing Places, R/walls, Cross Drainage, Providing and laying GSB, P/L WBM-II, WBM-III, C.C. pavment, Tarring work, Side drain, Parapets and road Furniture). (Under NABARD-RIDF-XXV).
Providing retaining structure, Missing CD, Metalling and Tarring, road side drain including 5 years maintenance in km 38/0 to 43/0 under PMGSY-II Batch-I Package No. HP-10-270