Loading…
Loading…
5,457 results • Best match
(SH- Formation Cutting Deficiency R/wall, B/wall, Cross Drainage Matteling and Tarring , Parapets Drain Metal Beam Crash Barrier and Providing Sign Board and Logo Board etc. Km. 0/0 to 8/300)
Providing and laying metalling and tarring and cement concrete pavement in various reaches between Km 3/600 to 5/025 and construction of causeway at RD 4/070 to 4/085) Under SCSP
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 1/555
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Interlocking Paver Block and Tarring work including five year routine maintenance etc
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Interlocking Paver Block and Tarring work etc.
SH- Construction of Formation cutting, Sub-Base, Metal Tarring, cross drainage work, Retaining wall, Breast wall, Parapets, Km stones, dumping site 0/0 to 2/055 including five year maintenance) Under NABARD RIDF -XXX
P/L metalling and tarring at Rd.0/750 to 1/325, Hume pipe Culvert at RD. 2/720 to 3/050, embankment at RD. 2/540 to 3/200 and wire Crates etc.
Widening/Improvement Including protection work R/wall and Breast wall, V and U Shape Drain , Providing crash Barrier, Railing work, Metalling and Tarring Road , Signage Board etc (Portion at 0/00 to 0/700).
Formation Cutting Widening of Road Construction of Retaining Walls Breast Walls Cross Drainage Works Cement Concrete Pavements Parapets Side Drains Road Furniture and Metalling Tarring including construction of Super Structure of 02 Nos PSC
formation cutting,R/wall,breast wall,CD works,GSB WBM-II,WBM-III,Tarring,cement concrete pavement,drain, parapets,soild causeway and road furniture i/c five years routine maintenance under NABARD RIDF-XXVIII
ROFD 5/7 mtrs. Wide road km. 0/0 to 0/120, C/o R/wall at RD. 0/0 to 0/0 to 0/020, P/L GSB, WMM. Tarring lote obe. etc.
Providing and laying WBM G-I, G-II and Tarring at various RDs in between Km 0/000 to 2/100 and C/O V-shape drain at RD 0/300 to 0/800
SH-Construction of Retaining wall Breast wall Metalling and Tarring Earthen shoulder sign Board PCC V-Shape drain Metal Beam Missing CD and parapets under PMGSY-III (BatchI) 2022-23 Package NoHP-06-151
Formation cutting, Wire crates, Retaining walls, Cross Drainage works, side drains, Parapets, Road sign board, and Mettaling and Tarring) Under PMGSY (Regular) (Batch II for the year 2018-2019) Package No. HP-02-348
FC, Passing Places, R/Walls, Missing CD work, GSB, WBM-II, WBM-III, Tarring work, C.C. Pavement, Side Drain and Parapets, including 5-year routine Maintenance after completion of work. (UNDER NABARD RIDF-XXX)
Imp.of roads,C/O Passing places, R/wall, Missing C.D. work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapetsand road side furniture including routine maintenance for five years after comple
SH C/O 5/7 metre wide road formation cutting, hume pipe culverts R/Wall B/Wall V-Shape drain Parapets, Metalling/Tarring Sign board and road marking etc 0/0 to 2/500
(SH-ROFD, Protection of work, cross drainage work, metalling and tarring, paver Block, V-shape drain, parapets, crash barrier, road safety, kilometer Stone and dumping site RD 0/0 to 5/0) under PMGSY
Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance) under PMGSY-III (Batch-I, 2023-24) in Distt Kangra (H.P.)
SH F/C 5/7 Mtr. Wide road at RD 0/00 to 0/325 and Providing and laying GSB, wearing Coat G-II and Tarring works in km 0/0 to 0/350
Imp.of roads,C/O Passing places, R/wall, Missing C.D. work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapetsand road side furniture including routine maintenance for five years after compl
Improvement of road, Passing Places, R/Wall, CD Work, GSB, WBM-II, III, Tarring work, CC Pavement, Side Drain and Parapet Under Nabard RIDF XXVII). including 5 year routine maintenance after completion the work.)
Formation cutting, protection work, cross drainage works, metalling and tarring, road side drain crash barrier parapets km stone and dumping sites etc including five year routine maintenance under PMGSY III batch II 2023-24
Widening of existing Single Lane to Intermediate Lane, Extension of Cross drainage Work, Providing and laying Metalling/Tarring, Side Drain and Parapets etcetera in between Km.39/180 to 46/0 )and Septic Tank).
Formation Cutting, Passing Places, R/Walls, C.D. Work, GSB, WBM-II, WBM-III, Tarring work, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII)
SH ROFD , Porotection work , R Wall , Cross drainage wokr ,Box Culvert at Rd. 20.470 tp 20.605), Metalling and Tarring , V-Shape drain , PCC Parapets , Road furniture and dumping site in Km. 19.0 to 26.700
Construction of passing places, Missing CD, side drains, Parapets, Crash barrier, CC pavement and tarring work including five year maintenance after completion Under PMGSY (Batch-II for 2018-2019) Package No. HP-02-345
FC, Passing Places, R/Walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, C.C. Pavement, Side Drain and Parapets, including 5-year routine Maintenance after completion of work. (UNDER NABARD RIDF-XXX)
SH C/O ROFD, Protection work, Cross Drainage works, Metalling and Tarring, Road Side Drain, Crash Barrier, Parapets, Road furniture, Dumping site in Km. 0/0 to 2/600 Package No. HP-06-176.
Formation cutting, C/o passing place, Side Drain, Parapets, Cross Drainage, Metaling and Tarring work and five year maintenance in km 0/00 to 3/800 under PMGSY-IV Package No HP-09-782.
Construction of MT on link road Repoh Piplu to Sundhari Karap Gondpur Baroh Basuni Mairi Gurudwara link road from km 000 to 10665
P/L interlocking paver
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 1/0 TO 2/00, 0/0 TO 1/0 AND 0/0 TO 2/0, 0/0 TO 2/0, 3/0 TO 4/0 and 8/0 TO 9/0, 1/0 TO 2/0, 0/0 TO 3/500, 0/0 1/0 RESPECTIVELY WITH PAVER FINISHER) DRRP NO. HP-03-03 VR0002, VR0014, VR0048, VR
C/O R/Wall in km. 1/1500 to 1/155, C/O Edge wall with V-shape drain km. 1/300 to 1/450, 1/470 to 1/600 an 2/800 to 2/950, P/L CC work in km. 2/500 to 2/550, P/L Tack coat an 25mm thick bituminous concrete in km. 1/00 to 2/500 and 2/550 to 3/00
C/O R.O.F.D Protection work, Cross drainage work, Road side Drain, metaling and Tarring, paver Blocks, Crash Barrier, Road safety work and Dumping Structure in km. 0/00 to 12/885). )(under Nabard RIDF-XXXI
SH - C/o 40.00mtr span bridge, Formation cutting, passing place, R/walls, Cross drainage works, P/L GSB, WBM-II, WBM-III ,Metalling and Tarring, CCpavement, road side drain and Parapets ).(Under NABARD RIDF-XXIX)
P/L WMM and Tarring in km 2/200 to 3/00 and C/O R/wall at various Rds) (Under PDNA-2023) Time Limit Three month Cost of Form Rs. 2000 Job No. 6
Formation cutting, Passing Places, R/walls, Cross drainage works, GSB, WBM G-II, WBM G-III, Tarring work, Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
Construction approaches at RD 1/272 to 1/342, construction of retaining wall at RD 1/262 to 1/272, Grading-III and Tarring work at RD 1/262 to 1/342) (Under PDNA-2023
M/T on Dadhol Kallan Sidh Chano Mandir to Roop Lal house to Bhel Km. 0/000 to 1/500 (SH P/L Soling, warding , and tarring in km. 0/700 to 1/200)(SCSP)
Improvement of Road, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII
Providing and laying cement concrete pavement from Km. 0/930 to 0/130 and Tarring in various RDs Km. 0/550 to 0/800, 0/850 to 0/993 and 1/330 to 1/550
Improvement of Road Passing Places, R/Wall, Missing CD Work, GSB, WBM-II, WBM-III, Tarring Work, BM, CC Pavement, Side Drain and Parapets including 5 year Routine Maintenance after completion of work RIDF XXVI
Formation cutting at RD 0/300 to 0/405, P/L GSB,G-II,G-III, Metalling and Tarring at RD 0/200 to 0/700, HP culvert 0/200, 0/300 and 0/660
C/O Passing places, Missing CD, Side Drain, Parapets, Crash Barrier, CC Pavement and Tarring work including five year maintenance after completion of work) under PMGSY Batch-II 2018-19 Package No. HP-04-387
Formation cutting, Passing places, Cross Drainage works, Side Drains, Parapets, Cement concrete pavements and Metalling and Tarring ) under PMGSY (World Bank RRP-II) Batch -II for the year 2018-19 Package No HP-02-352
C/O Formation Cutting, Protection Work, Cross Drainage Work, V-Shape Drain, Metalling And Tarring, Crash Barrier Road Furniture and Dumping Structure in KM 0/000 to 13/691. (Road Portion) 600 mtr Road Portion
Improvement, passing places, missing cross drainage, side drain, parapets,crash barrier,CC pavement , Tarring and road signs etcetera including five year routine maintenance) under PMGSY-III (Batch-I, 2023-24 Package No. HP-09-716
M/T on link road to village Dachhain Km. 0/00 to 2/500 (SH P/L Kharanja Stone Soling Metalling and Tarring and C/o Katcha drain in Km. 0/00 to 1/200)
Removal of Formation Defficiencies ,R/wall, B/Wall ,Cross-Drainage work ,Metalling and Tarring, Crash Barreir , Parapets, Drain, and Providing Sign Board and Logo Board etcetra.in km 0/0 to 5/500 ) Under RIDF- XXIX