Improvement, passing places, R/walls, Missing C.D. work, GSB, WBM-II, WBM-III, tarring work, side drain and parapets including 30.00 mtr span Bridge at RD 5/420 on Saluhi Khad) under RIDF-XXIX (NABARD)
ROFD, M/T, R/walls, B/walls, CD work, metaling and tarring, crash barrier, parapets, Drain and provding sign board and logo board etc. in KM 0/0 to 10/0) Under NABARD RIDF-XXIX
ROFD, R/walls, B/walls, CD work, P/L GSB,WMM, Metal Tarring, Cement concrete Pavement, interlocking tiles, side drain, parapets sign board etc. in km 0/0 to 4/100) Under NABARD RIDF-XXX
SH Formation cutting, Passing places, Retaining walls, Cross drainage work, Providing and laying Granular Sub Base, WBM-II, WBM-III, Tarring work, Cement concrete Pavement, side drain and Parapets) including five year maintenance after completion
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
(SH C/O Formation Cutting,sub Structure,Sub structure,super structure,R/wall,B/wall for Both side approaches road, Metaling Tarring,Catch water Drain in RD 6/00 to 7/00)RIDF-XXIX Recalled
Formation cutting, C/O Passing places, Breast wall, Retaining wall, Gabion wall, Missing CD, Road side Drain, parapets , Crash Barrier, Road sign Board, Bio Engineering works, Cell Filled Cement concrete Pavement and Tarring work etc.
Formation deficiency formation cutting i/c retaining walls, Breast walls, CD works, road side drain, PCC Parapets, GSB, WBM, G-II, G-III, Tarring works, sign board, including five year maintenance) under NABARD-RIDF-XXIX
Widening Metalling and tarring in various location U shape drain, Retaining wall and Breast wall in Brock Hurst to Vikas Nagar road at Rd 0/00 to 0/615)(Under Smart city in Shimla Town)
Providing and Laying CC pavement at Km 0/0 to 0/600 and providing and laying GSB G-II G-III and metalling Tarring at km 0/600 to 0/900 (under D-10-3054
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 4/540 includinng five years routine maintenance under PMGSY-IV Batch I
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
C/O Passing places, Missing CD, Side Drain, Parapets, Crash Barrier, C.C. Pavement and Tarring work including five year maintenance after completion of work) under PMGSY Batch-II 2018-19 Package No. HP-04-386
Construction of 5/7 Metre wide Formation cutting, Retaining walls, Breast walls, Cross Drainage work Road side Drain, Metalling/Tarring and Parapets from km. 1/795 to 3/665 including five years maintenance period after completion
SH ROFD, Metalling and Tarring , R/wall , B/wall , C.D works , Metal beam crash barrier and Dumping site etc. for single lane portion km 31/300 to 36/600 )Job No. CRF -HP-2017 -18 -143)
Construction of Formation cutting , Sub Base, Metalling and Tarring, cross drainage work Retaining wall, Breast wall, Parapets, Km. stones, dumping site etc. Km. 0/00 to 2/075 including five year maintenance) Under NABARD RIDF-XXXI
(SH- Formation cutting/filling providing cross drainage works, metalling and tarring, road side drains essential parapets and road sign furniture in km. 0/0 to 1/830) including five year routine maintenance) (Under NABARD RIDF-XXVII).
SH Const of Solid Causeway at RD 0085 to 0095 1585 to 1595 and 1650 to 1660 and Providing and Laying GSB WMM and Tarring Between km 0058 to 0085 and 0095 to 0205 Under MNP
Improvement, C/o Passing places, CD works, GSB, WBM-II, Wet Mix, side drain, parapets, CC pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-522 and HP-08-524.
SH Const of Gabion Wall between km 1815 to 1830 ic PCC Pushta and drain between km 1845 to 1860 and PL GSB WMM and Tarring between 00 to 0495 in extra width Against telecom deposit
ROFD, Retaining Walls (PCC), Breast Walls (PCC), Cross Drainage, Widening, Metalling and Tarring, Concrete Panel Pavement, Drain, Road Furniture, Routine Periodic Maintenance etc. of Package No. HP-08-557, HP-08-558 and HP-08-560.
SH-Construction of Retaining wall Breast wall Metalling and Tarring Earthen shoulder sign Board PCC V-Shape drain Metal Beam Missing CD and parapets under PMGSY-III Batch-I 2022-23 Package No. HP-06-256
Formation cutting, Retaining walls, cross drainage works, GSB, WBM-II WBM-III, Tarring, cement concrete pavement, drain, and construction of 25.00 mtr span Box Girder bridge over Guglahar Nallah including five years routine maintenance)Under NABARD
C/o 5/7mtr Formation cutting,Passing places, R/walls, , Cross drainage works, P/L GSB, Wet Mix Macadam ,Tarring, Road side drain and Parapets in Km 0/0 to 2/195). (Under NABARD RIDF-XXVIII).
(SW- Formation cutting, Passing Places, R/Walls, C.D.Work, GSB, Wet Mix macadam, Tarring work, CC Pavement, Side drain, Sign board and parapets including 2 No. Bridges) including maintenance of five years after completion of construction work).
C/O Protection work, P/L Metalling and Tarring, C/O Hume Pipe culvert with channelization, C/O V-Shape drain, P/erecting W-metal beam crash barrier and road furniture etc. at RDs 117/200
Formation cutting,Passing places, R/walls, Cross Drainage work, P/L GSB, WBM-II, Tarring work, C.C.Pavement, C/o road side drain and Parapets etc. In Km. 0/0 to 4/700) (Under Nabard) RIDF-XXVI
C/O Protection work, P/L Metalling and Tarring, C/O Hume Pipe culvert with channelization,C/O V-shape drain,P/erecting W-metal beam crash barrier and road furniture etc.at RDs 124 plus 650).
Construction of 40.00 metre span bridge, Formation cutting, passing places, Retaining walls, Cross drainage work, GSB, WBM-II, WBM-III, tarring work, Cement Concrete pavement, side drain and parapets including five Year Routine Maintenance after comp
Construction of 900 mm dia RCC hume pipe culvert at Km. 0/650 and providing and laying wearing grade-II and tarring in Km. 0/037 to 0/184 and Km. 0/285 to 0/645
Metalling and Tarring, ROFD for improvement of narrow curves, missing R/wall, B/wall, Missing CD works, V-shape drain, parapets, crash barrier, logo boards and five year routine maintenance etc. Package No. HP-08-520.
Metalling and Tarring, ROFD for improvement of narrow curves, missing R/wall, B/wall, Missing CD works, V-shape drain, parapets, crash barrier, logo boards and five year routine maintenance etc. Package No. HP-08-540.
Formation Cutting, Improvement of Road, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII
Construction of B/wall in wire crate, U-shape Drain and P/L Metalling Tarring in km 0/040 to 0/070 ,4/120 to 4/190 ,7/090 to 7/150,10/130 to 10/220)
Formation cutting,Passing places, R/walls, Cross Drainage work, P/L GSB, WBM-II, Tarring work, C.C.Pavement, C/o road side drain and Parapets etc. In Km. 0/0 to 2/457) .( Under Nabard RIDF-XXVI )
Formation cutting, R/wall, B/wall, CD works, Mettaling and tarring, V-shape Drain, Parapets and sign board in km 0/0 to 9/790 and 25.00 mtrs span RCC Box Grider at RD 6/655
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture and Dumping Structure in km 0/0 to 3/750 including five years routine maintenance under PMGSY-IV Batch-I
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture and Dumping Structure in km 0/0 to 8/090 including five years routine maintenance under PMGSY-IV Batch -I
ROFD, Protection works, Cross Drainage Works, Metalling and tarring, Road side drain, Crash barriers, Road furniture and Dumping Structure in km 0/0 to 8/780 including five years routine maintenance under PMGSY-IV Batch-I
ROFD wire crates/Gabion walls C/o R/wall P/L Granular Sub Base (GSB) CC pavement parapets crash barriers system V-shape and U-shape drain cross drainage structures including five year routine maintenance after completion work
(SH Formation Deficiencies,CD with slab culverts,P/L GSB,WBM Gr II Gr III, M/T works, road side V shape Drain,Essential Parapets,P/L sign Board and Km stone and wire crate structure etc) and 5 Year Maintenance after completion UNDER NABARD RIDF- XXVI
C/o ROFD, construction of retaining and breast wall, CD works (HPC) Slab culvert, road side drain, PCC parapets, GSB, WBM, Gr-II and III, tarring works, sign boards including five year maintenance) under NABARD-RIFD-XXIX
Improvement of Road, Passing Places, R/Walls, Missing CD work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII).
Improvement of Road, Passing Places, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII).