Loading…
Loading…
5,457 results • Best match
P/L G-I, G-II, Tarring work at RD 4/081 to 4/098, 4/102 to 4/122 and 4/950 to 4/958, 4/962 to 4/972 and 6/188 to 6/198
Formation cutting, Retaining structure, W-Metal Beam, Crash Barrier, Cross drainages works, Metalling Tarring, Interlocking concrete blocks, V-Shape U-Shape drain, Parapets, Road signages Dumping site etc. Km 27/00 to 36/00) (Under NABARD RIDF
(SH- widening of 5/7 meters wide road, including retaining walls, providing cross drainage works, metalling and tarring, interlocking paver blocks, construction of U-shape side drains, construction of parapets and providing road furniture etc. in km
Improvement of Road, Passing Places, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII
Formation cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain and parapets including 19.75 mtr span bridge over Nera Khad including five years maintenance after completion of work
Improvement,Passing places, R/walls,C.D. work, GSB, WBM-II, WBM-III, Tarring work, Side Drain, Metal crash Barrier, CC Pavement, Interlocking paver Block and parapets including routine maintenance for five years after completion of construction work
Formation cutting, Construction of passing places, Missing CD, side drain, Parapets, Crash barrier, CC pavement and tarring work including five year maintenance after completion Under PMGSY-II (Batch-I for, 2019-2020)Package No HP-02-06
C/o Passing Places, Retaining Walls, Missing Cross Drainage, Side Drains, CC Pavements, Road Safety Measure, Place of Identification Sign Boards, Protection Work, BM and Tarring including routine maintenance for five years after completion c/o work
C/O Formation Cutting, Protection Work, Cross Drainage Work, V-Shape Drain, Metalling and Tarring, Road Furniture and Dumping Structure in km 0/00 to 12/730 (Portion 6/00 to 12/730) Under NABARD RIDF-XXXI
Formation Cutting, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABA
Construction of 45.00 meter span prestressed concrete box girder bridge at RD 9/210 including approaching along with 5 years routine maintenance , ROFD, Protection work, Metaling and Tarring, construction of road side drains, Crash Barriers, Road Sa
Formation cutting intermidiate standard, C/o Retaining wall, Cross drainage, P/L GSB, Metalling and tarring, Cement concrete pavement, C/o Road side PCC drain, Parapet, road side furniture etcetra) under Central Road and Infrastructure Fund ( CRIF)
C/O both side edge walls embankment filling at Rd. 0/190 to 0/250 P/L GSB,WMM at Rd. 0/080 to 0/300 Tarring in km. 0/0 to 0/300) Under OTMNP Head
F/C Passing Places R/walls CD Works P/L GSB WBM-II WBM-III Tarring works, C.C. pavement, Road Side Drain and Parapet etc. and road furniture i.c. five years routine maintenance Under NABARD RIDF-XXVIII
Construction of 35.00 mtr. span prestressed concrete box girder bridge at RD 12/120 including approaching along with 5 years routine maintenance , ROFD, Protection of work, Metaling Tarring, construction of road side drains, Crash Barriers, Road S
C/o ROFD, construction of retaining and breast wall, CD works (HPC) Slab culvert, road side drain, PCC parapets, GSB, WBM, Gr-II and III, tarring works, sign boards including five year maintenance) under NABARD-RIFD-XXIX
SH C/O Retaining wall, Toe Protection wall, W Metal beam Crash Barrier, Metalling and Tarring at Km. 0/855 to 1/175 and 13/270 to 23/090) under CRF Job No.CRF-HP-2023-24/188
Construction of 40.00 mtr. span prestressed concrete box girder bridge at RD 13/300 including approaching along with 5 years routine maintenance ROFD, Protection of work, Metaling and Tarring, construction of road side drains, Crash Barriers, Road
C/O road from SKRN Zero point bill to Bijali Board in km 0/0 to 1/720SH P/L Gr-II in different reaches and Gr-III and Tarring in km 0/0 to 1/720
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, Plastic cell filled cement concrete pavement and Tarring work including five years routine maintenan
ROFD, R/wall, B/wall, Cross drainage, P/L GSB, WMM, Metaling Tarring, Cement Concrete Pavement, Interlocking tiles, side drain , parapets sign boards in Km. 0/00 to 8/00) Under NABRD XXXI including 5 year maintenace
Construction of 50.00 meter span single steel bridge at RD 17/180 including approaching along with 5 years routine maintenance , ROFD, Protection of work, Metaling and Tarring, construction of road side drains, Crash Barriers, Road Safety Measures
/o Passing Places, Retaining Walls, Missing Cross Drainage, Side Drains, CC Pavements, Road Safety Measure, Place of Identification Sign Boards, Protection Work, BM and Tarring including routine maintenance for five years after completion of C/O WORK
Formation cutting, Wire crates, Retaining walls, Cross Drainage works, side drains, Parapets, Road sign board, and Mettaling and Tarring) Under PMGSY (World Bank-RRP-II) (Batch II for the year 2018-2019) Package No. HP-02-348
C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Interlocking Paver Blocks, Cement concrete Panel pavement and Tarring work including five year
C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work including five years routine maintenance
Formation cutting, Retaining structure, W-Metal Beam, Crash Barrier, Cross drainages works, Metalling Tarring, Interlocking concrete blocks, V-Shape U-Shape drain, Parapets, Road signages Dumping site etc. Km 36/00 to 51/660) (Under NABARD RID
(SH- P/L stone aggregate G-l, G-ll, G-lll, Tarring in extended portion 2/150 to 5/840 and widening of narrow reaches between RD 17/930 to 18/115 18/185 to 19/420)
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, Plastic cell filled cement concrete pavement and Tarring work including five years maintenance etc
Sub Head ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/0 to 1/520 includinng five years routine maintenance under PMGSY-IV Batch I
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement, Dumping Site and Tarring work etc.
ROFD, Metalling and Tarring, Retaining wall, Breast wall, cross drainage works, W-metal beam crash barrier, PCC Drain , Road side parapets, Road Marking , logo board and kilometre stone etc. and five year routine maintenance under PMGSY-II
SH Rwall repair of cross drainage structures Cons road side drain parapets Cross barriers panelled concrete pavement Metalling and Tarring and road safety measures etc including Five year routine maintenance under PMGSY-III Batch-I 2022-23
Improvement, passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and road signs etc. including five year routine maintenance of Package No. HP08561, HP08562, HP08563 and HP08564
F/C 5/7 mtr. Wide,R/walls, breast walls, Meetalling Tarring, Cross drainage, V-shape drain, Parapets, Dumping site, Stone in Km. 0/00 to 4/515) (RIDF-XXIX) (UNDER NABARD) (Including 5 years of routine maintenance)
(SH-ROFD, Protection of work, Cross drainage work, metalling and tarring panel concrete, V-shape drain, parapets, crash barrier, road safety, kilometer Stoen and dumping site RD 0/0 to 29/025) under PMGSY-III (HP-09-709)
SH Metalling Tarring in Km 1/300 to 2/050 C/O 5.00 metre span RCC slab culvert at RD 1/380 with wing wall and C/O V-shape drain in Km 1/300 to 2/050
C/o Passing Places R/walls Missing C.D. works Side Drain CC Pavement B.M. Tarring work road safety easure place of identification sign board Protection work and Maintenance for 5 year after completion Package No. HP-04-403
(SH- F/C, passing places, R/Wall, Cross drainage work, Granular Sub Base, wearing and tarring work, side drain, Parapets and C/O 40.00 mtr. span pre-stressed Box Girder Bridge Over Khouli Khad at RD 0/545)
Formation cutting Passing places, Retaining walls Cross drainage works, GSB,WBM G-II WBM G-III Tarring work, Interlocking Paver Block Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
SH- Formation Cutting, C/O Passing places, R/wall, Missing C.D. work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapetsand road side furniture including routine maintenance for five years after completion of construction work.
Imp. of road, Formation Cutting, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD
Formation cutting, passing places, construction of retaining walls, X-drainage work, metalling and tarring, cement concrete pavement, road side drain and parapets in Km. 0/0 to 3/930 including 5 year routine maintenance after completion of work
SH C/O 900mm dia Hume Pipe Culvert at RD 0/275 with wing walls and 2.00 metre Span RCC Slab culvert at RD 1/068 with wing walls and metalling tarring V-Shape drain at various RDs
FC, passing places, C/O R/walls, C/O CD work, P/L GSB, WBM-II, WBM-III Tarring work, construction of Side drain and parapets etc including routine maintenance for five year after completion of construction work).
Development of Industrial Plots at Sansiwala i.e. Road ic metalling and tarring, parking with interlocking tiles, CO U shape drain and x- drainage, green space, external water supply and external sewerage system ic 100 KLD sewerage treatment Plant)
Formation Cutting, R/walls, B/wall, Crash barrier, C.D. work, GSB, WBM-II, WBM-III, Tarring, C.C. Pavement, side drain, parapets and road furniture including routine maintenance for five years after completion of construction work.(Under Nabard RIDF
Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work including five years routine ma
Improvement, Passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and Road signs etc. including five year routine maint. of Package No. HP08566 HP08567 HP08568 HP-08569 HP089999.
SH Reconstruction and Restoration of ROFD, Metalling and Tarring, Protection work, Cross Drainage work (in HPC, Box Culvert, Slab Culvert), Road Side Drain, Road Furniture and Dumping Structure due to torrential Rain and Cloud burst at various stretc