SH Reconstruction and Restoration of ROFD, Metalling and Tarring, Protection work, Cross Drainage work (in HPC, Box Culvert, Slab Culvert Road Side Drain, Road Furniture and Dumping Structure due to torrential Rain and Cloud burst at various stretche
SH Reconstruction and Restoration of ROFD, Metalling and Tarring, Protection work, Cross Drainage work (in HPC, Box Culvert, Slab Culvert), Road Side Drain, Road Furniture and Dumping Structure due to torrential Rain and Cloud burst at various stretc
Formation cutting for 5/7 mtr wide road , R/walls ,C.D, Granular Sub Base ,WMM,Metalling Tarring , Interlocking Paver Blocks V-Shape Drain , Parapets, Road Singnages Dumping sites in km 2/510 to 5/525 ) Under NABARD RIDF-XXIX)
SH - Formation cutting, passing places, R/walls, C.D work, GSB, WBM- II, WBM- III , Tarring work, Cement concrete pavement, side drain and parapets including 30.00 metre Span RCC Box Girder bridge at RD 0/570 under Nabard RIDF- XXIX
Improvement of road, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, CC pavement, Side Drain , Parapets, crash barrier and road furniture i/c routine maintenance for five years after completion of construction work
Construction of formation cutting, retaining walls breast walls, metalling tarring, catch water drain, bituminous works, cross drainage structures, parapets, dumping site, stone sign boards in RD 0/00 to 4/436)(RIDF-XXIX) (Under NABARD) (i/c 5 years
C/o 5/7mtr Formation cutting,Passing places, R/walls, , Cross drainage works, P/L GSB, Wet Mix Macadam, Tarring work, Interlocking Paver, Road side drain and Parapets in Km 0/0 to 2/115). (Under NABARD RIDF-XXVIII).
SH- Removal of formation deficiency, C/o passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Interlocking CC Block and Tarring work Under PMGSY -II Package No. HP-02-09
Removal of formation deficiencies, C/o Retaining walls, Breast walls, wire crates, Providing and laying Metalling and Tarring, C/o road side drain, C/o road side parapets, C/o Cross-drainage works,providing and fixing road safetymeasures, maintenance
Construction of 30 mtrs. Box Girder Bridge, Formation cutting, Passing Places, C/o Protection work, Cross Drainage, Providing and laying GSB, P/L WBM-II, WBM-III, Interlocking Paver Block, Tarring work, Side drain, Parapets and road Furniture). (Unde
Harizen Basti Neri in Km. 0/0 to 1/375 SH C/O ROFD R/Walls cement concrete pavement from RD 0/270 to 1/375 and Metalling Tarring in Km. 0/0 to 1/375 Under SCSP Head
Balance work of P/.L Cement concrete pavement at rd. 0/730 to 0/760, GSB, WMM,Tarring in km. 0/760 to 1/00, R/wall at Rd. 1/030 to 1/090 C/O V-shape drain
C/O Formation cutting, C/O retaining walls and breast walls, RCC Hume pipe culverts 900mm dia, C/O Metalling and Tarring, C/O PCC V-shape drain , PCC Parapets and road sign boards including Five years routine maintenance
Providing Metalling tarring removal of formation deficiencies, C O PCC R Wall and B/Wall, C/O Missing cross drainage works, PCC road side drain , parapets Kilometre stone and C O road side edging including 5 year annual maintenance
Widening or road to intermediate lane standard, R/walls, B/walls, C.D. work, GSB, WBM, Tarring work, CC Pavement, Interlocking Concrete block, Side Drain, Parapets, Crash Barrier and Sign Boards including C/o 30.00 meter span Double lane Bridge
Formation cutting for 5/7 mtr wide road , R/walls ,C.D, Granular Sub Base ,WMM,Metalling Tarring , Interlocking Paver Blocks V-Shape Drain , Parapets, Road Singnages Dumping sites in km 0/0 to 2/510 ) Under NABARD RIDF-XXIX)
(SH - Scarifying M/T GSB and Providing and laying GSB, G-II, G-III and tarring on km.2/577 to 2/637, 3/407 to 3/467, 4/090 to 4/150 and 4/903 to 4/963)
FC, RW, CD work, GSB, WBM-II, WBM-III, Tarring work, c.c pavement interlocking paver block, drain, parapet road furniture and construction of 33.40 mtr span Box Girder Bridge over Dharoon Khad RD at RD 0/695 including approaches
Construction of link road Dhawi to village Mehol Km 0/0 to 0/950SH Providing and laying wearing and Metalling/tarring at Rd 0/150 to 0/950 edge wall at RD 0/212 to 0/239 Under MMGSY
C/o R/wall in km. 0/115 to 0/135, 0/190 to 0/220, 0/452 to 0/472, 0/500 to 0/515 and Providing and Laying tarring in km. 0/000 to 0/610 DMFT
Formation cutting, PCC Retaining walls, Created Breast wall, Cross drainage works, Side drain, Parapets, road sign boards and Metalling and Tarring) under PMGSY, (World Bank-RRP-II) Batch-II for the year 2018-2019 Package No. HP-02-347
Construction of R wall at km 182.177 to182.197 B wall at km 201.060to 201.100 respectively and providing sub grade metalling tarring at depressed portions at km194.300 to 194.360 211.740 to 211.870 and Thrie Beam crash barriers at 182.177 to
SH formation cutting, C/o passing places, B/wall, R/wall,Gabion wall, missing CD, road side drain, parapets, road sign board, bio engineering work and tarring work etc. under PMGSY-IV batch I package No. HP-11-194
ROFD, Metalling and Tarring, Retaining wall, Breast wall, Hume pipe culvert , PCC Drain , Road side parapets, logo board and kilometre stone etc. and five year routine maintenance under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-517.
Formation cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets, road furniture and 33.40 meter span Prestressed concrete Box Girder Bridge at RD 0/0675 including both sides Approaches and
SH Construction of R wall at Km 181.745 to 181.770 B.wall at 201.710 to 201.820 201.885 to 201.910 and u shape drain at 201.710 to 201.820 and 201.865 to 201.910 respectively and providing subgrade metalling tarring between 174.920 to 174.990
Formation Cutting, Metalling and tarring, C/O Hume pie culvert, R/wall, P/L GSB, WMM, SDBC, CC pavement, Parapets for essential reaches, Road side drain, CD works and five year routine maintenance in KM 0/0 to 04/650
SH Metalling/ Tarring work from RD 0/0 to 0/450 and Providing and laying 600mm dia pipe at RD 0/0 and C/o U-Shape drain from 0/0 to 0/030 and 0/135 to 0/235
5/7 mtr wide Formation cutting i/c C/O retaining walls and Breast Walls, Providing cross drainage works a/w PSC Box girder, P/L Metalling and tarring and , C/O bridge in between Km.0/0 to 4/915)
SH C/o Retaining wall and P/L WMM and Metalling/Tarring in km 0/0 to 1/0 and C/o Retaining wall at RD 1/120 to 1/130 and Breast wall at RD 0/600 to 0/612
F.C, Passing Places, R/walls, CD works, GSB, WBM G-II, WBM G-III, Tarring work, Interlocking Paver Block, C.C. pavement, Road side drain and Parapets, P/F Road Furniture i/c five years routine maint. in under NABARD RIDF-XXVIII
SH - FC, C/O Passing places, R/wall, C.D. work, GSB, WBM-II, WBM-III,Tarring work, Side Drain , parapets including 50 mtr. span Bridge including routine maintenance for five years after completion of construction work. (UNDER NABARD RIDF-XXIX)
F/C, Passing Places, R/walls, B/wall, CD works, P/L GSB, WBM-II, WBM-III, Tarring, C.C. pavement, Road side drain, Parapets,Road Furniture C/O 19.75mtr.span RCC T-Beam Bridge i.c both side under NABARD RIDF-XXVIII
Imp of road, Passing Places, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD RIDF-X
SH C/o road from jeep able to 5/7mtrs wide road in Km0/00 to 0/250 soling and pavement tarring in Km0/00 to 0/250 SW C/o paver block and CC pavement in Km0/00 to 0250
C/o 5/7 meter Wide Road, C/o Retaining Walls, Breast Walls, Providing Cross-Drainage Works, P/L Metalling and Tarring, C/o V-Shape Drains, Essential Parapets and Road Side Furniture in Km 0/0 to 1/0
Providing and Laying GSB from 1/175 to 1/425, G-II from 1/225 to 1/425 and CC Pavement 1/425 to 1/475 and Tarring from RD 1/475 to 1/660 and 1/310 to 1/425
SH ROFD, Protection of works, Metalling Tarring, V-Shape drain, Parapets, road safety, Kilometer stone, irrigation and dumping site at RD.0/0 to 7/0 (including five year maintenance) under PMGSY-III Batch-I for the year 2023-24
P/L Metalling and Tarring, R/Wall, RCC Hume pipe culverts, 6.00 mtr. span slab culvert, V Shape drain, Parapets, Citizen information board, Logo board, Km. stones in km. 0/0 to 3/500 including five year maintenance ) Package No. HP08302.
Providing and laying metalling and tarring, Cement Concrete Pavement, C/o retaining walls and Breast walls, Cross drainage works, Road side drain, Essential Parapets and Five years maintenance under PMGSY, Batch-I, Stage-II for year 2017-18 HP-08-334
Providing and laying Metalling and tarring V-shape drains PCC parapets unlined drain and routine maintenance of 5 years in Km. 0/0 to 0/345 0/435 to2/330 and 3/700 to 4/510 Package No. HP-07-13
C/o 5/7 meter Wide Road, C/o Retaining Walls, Breast Walls, Providing Cross-Drainage Works, P/L Metalling and Tarring, C/o V-Shape Drains, Essential Parapets and Road Side Furniture in Km 0/0 to 1/405
SH- C/O Formation Cutting, C/O Passing places, R/wall, Cross drainage work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapets and road side furniture including R/M for five years after completion of construction work
SH ROFD, Metalling and Tarring , R/wall , C.D works, Metal beam crash barrier , road marking, road furniture and dumping site etc. for double lane portion km 56/600 to 61/600 ) under CRF Job No. CRF -HP-2017 -18 -143.
C/O R.O.F.D., Retaining walls, Breast walls, Dumping Sites, Clearing and Grubbing, Setting Outs, Cross Drainage work, V-Shape Drain, Parapets, Logo Board, Km. stones, 200 mtrs. Stones, Bio Engineering and Metalling and Tarring in Km. 0/0 to 5/200).