Loading…
Loading…
2,442 results • Best match
Bhadravathi Taluq, Engaging of Road conductor for the Maintenance of State Highways in Bhadravathi Taluq for the year 2025-26
Replacement of existing LT Overhead lines into LT AB cable in 4 feeders in O & M Unit-1 of Kanakapura urban Sub-division of Kanakapura Division in BESCOM on Total Turnkey basis under Percentage Quoting basis.
Tender for the Work of supply and laying of 1.1 kV Class Aerial Bunch (AB) Cable in BWSSB Colony Premises at Harohalli under jurisdiction of AEE(K-O&M)-2-1 sub-division. (Short Time Tender)
M8112355265, M8112255620, M8110244464, M8112355733, M8112255611, M8112255675, M8112256386, M8110206455, M8112255550, M8112256687, M8112255374, M8112255921, M8112256809, M8112215794N, M8112255912, M8112256562, M8112255259
Selection of Laboratories for Testing of Products/Material - Conductors and Conducting materials; As per Technical Specifications; As per Technical Specifications; As per Technical Specifications
PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6327359 Dated : 05-08-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Jointless Grooved Copper Contact Wire 107mm2 made out of Continuous cast copper wire rods as per RDSO Spec.No.TI/SPC/OHE/CW/0971 or Latest. (Copper weight per meter = 0.9512 Kg/M, 8.561 MT for 9 KM ,D
Hard Drawn Jointless Grooved Copper Contact Wire 107 Sq.mm made out of continuous Cast Copper wire rods as per RDSO Specification No. ETI/OHE/76 (06/97) wit A&C Slips 1,3,4,5,7,8&9 or latest. Item not
JOB ORDER FOR REPAIR AND REPLACEMENT OF HT CABLE FROM PH III 66 MRS TO VCB PENAL OF CAIR SUB STN INCLUDING CONNECTED WORK UNDER GE I R AND D WEST BANGALORE
Bhadravathi Taluq Engaging of Road conductor for the Maintenance of Major District Roads in Bhadravathi Taluq for the year 2025-26
CONDUCTOR ROD AS PER DRG 4 982 10 13023 R01
4 core 70 sqmm 1100 V grade, Stranded Aluminium Conductor
Providing Road Conductor for MDR Roads Maintenance in Shikaripura Taluk
SUPPLY OF CONDUCTOR ROD AND MS PLATE AS PER DRAWING
CONDUCTOR ROD AS PER DRG 4 982 10 13023 R01
Providing and installing of 150mm NRV, 150mm/100 Sluice Valve, 30 sqmm copper cable, 50HP pump & Motor bedding and other equipments in Dudgal Water Supply Unit and main pipeline in Somwarpet TP limits
Electron beam irradiated multistranded copper cable size 1.5Sq.mm grade 1.8/3.0kV conf. to RDSO Spec.no. ELRS/SPEC/ELEC/0019, RDSO specification no. ELRS/Spec./ELC/0019, Rev-4 of Feb-2018. Note: Deman
SPECIAL REPAIR / REPLACEMENT OF MOTOR EARTHINGS AND REPLACEMENT OF ALUMINIUM WIRE WITH COPPER WIRE AT PUMP HOUSES ANDSTPS AND SPECIAL REPAIR/ REPLACEMENT OF SLUICE VALVES, AIR RELEASE VALVES OF DIFFERENT SIZES AND GATE VALVES WITH CONNECTED PIPELINE
welding cable Welding Cable ( 100 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Governing specification Conforming to IS:9857 latest * ISI Marked Yes * CM/L No. 3897593 * ... * Conductor Type ... Copper Copper Cable Size ... cycle/ Conductor type ... of Conductor 70 ...
System strengthening works of Conversion of existing LT overhead line into Aerial Bunched (AB) cable at various hazardous locations in W-6 subdivision of R.R Nagar division, Bangalore West circle, BMAZ (South), BESCOM on percentage basis quoting.
PVC Insulated Unsheathed Cable with Flexible Conductor as per IS 694 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7034590 Dated : 13-01-2026 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Replacement of incoming LT power cable of G-1 and G-3 panels located at ETF area ground floor Main Building, URSC Main Campus, Bengaluru-17.
BI PIN HOLDER CLICK FIX TYPE (T8) OF 2A, 250V, SUITABLE FOR 2 FEET TUBULAR 18 WATTS FL LAMP AND ENTRY CONNECTION HOLE SUITABLE FOR 1-1.5 SQ MM COPPER WIRE. MAKES: RI, PHILIPS, OSWAL, BJP, ANCHOR, CROM
8793REPAIRS MAINT OF INTERNAL DISTRIBUTION SYSTEM LIGHTNING CONDUCTORS EARTHING INFRACTURE SYSTEM AND INTERNAL WIRING IN WEST AREA AND AFTC UNDER GE M AF JALAHALLI BANGALORE
PROVIDING ROAD CONDUCTORS FOR MAJOR DISTRICT ROADS IN BELTHANGADY TALUK( PROVIDING 8 GANGMAN FOR MAJOR DISTRICT ROADS IN BELTHANGADY TALUK FOR FINANCIAL YEAR 2025-26)