Loading…
Loading…
95 results • Best match
KEI PVC Insulated Copper Cable Single and Multi - Core Circular, KEI PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor as per IS:694 (Version 2) 6 sqmm, 1 Core
Supply of ACSR Conductor for LTHPL LANCO TEESTA (NHPC) project (Q3)
SERVICES- HIGH VOLTAGE POWER CABLE - HEALTHINESS CHECKING OF 220KV XLPE CABLE
PVC Copper cable Single core Unsheathed with Rigid Conductor ( PAC Only )
PVC Copper cable single and multi core Circular Sheathed cable with flexible Conductor
PVC Copper cable Multi core Circular Sheathed Cables with flexible Conductor as per IS:694
Unbranded 6 core PVC Copper cable Multi core Circular Sheathed, Unbranded 6 core PVC Copper cable Multi core Circular Sheathed Cables with flexible Conductor Type ST2 (HR)
PVC Copper Cable, Single Core, Unsheathed cables with Flexible conductor-For Working Voltages Up to, pvc aluminium cable
Replacement of existing HT overhead conductor lines with covered conductor and replacement of old/ frayed lt Conductor (lt bare to LT bare and LT AB cable) under revamped Reforms-based and results-linked, distribution sector scheme
Supply & Installation of DC Rectiformer along with Power Cables
Control cable 1.1 KV Grade- PVC (Q3)
Repair and maint of ht 11 KV 3 core XLPE Cable
66KV GRADE 1CX95 SQ. MM (XLPE) COPPER POWER CABLE AND ITS ALLIED ACCESSORIES, 66 KV OUTDOOR TERMINATION KIT SUITABLE FOR 66KV, 1CX95 SQ. MM. XLPE COPPER CABLE, STRUCTURES INCLUDING FOUNDATION BOLT FOR TERMINATION OF 66KV GRADE 1CX95 SQ MM(XLPE) POWER CABLE...
power cable for direct burial xlpe ugac cable
power cable for direct burial xlpe ugac cable
power cable for direct burial xlpe ugac cable
power cable for direct burial xlpe ugac cable
power cable for direct burial xlpe ugac cable
power cable for direct burial xlpe ugac cable
Service Cable For UIFOS (Q3)
Supply of Control and Power Cables for Power House of Teesta-V Power Station
REPLACEMENT/ AUGMENTATION OF OLD/FRAYED CONDCUTOR OF 11 KV, REPLACEMENT OF OLD/FRAYED LT CONDUCTOR (LT BARE TO LT BARE AND LT BARE TO LT AB CABLE) UNDER REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCHEME
power cable for direct burial xlpe ugac cable, welding cable
Service Cable for Power Supply (Q3)
REPLACEMENT/ AUGMENTATION OF OLD/FRAYED CONDCUTOR OF 11 KV, REPLACEMENT OF OLD/FRAYED LT CONDUCTOR (LT BARE TO LT BARE AND LT BARE TO LT AB CABLE) AND CAPACITOR BANKS UNDER REVAMPED REFORMS-BASED AND RESULTS-LINKED, DISTRIBUTION SECTOR SCHEME
Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418
Arens control cable, veh speed sensor GB, Assy oil filter, seal steering cover, suspension kit set, hose flexible front pipe to mechanical pump, booster assy brake, hand brake cable, rear door lock, cyl assy LH, cyl assy RH
Copper wire 2.5 Sq MM Single Core, Combined Switch Board 16 Amp, Iron Pipe 1 Inch Sq MM, Iron Pipe 1.5 Inch Sq MM, Flex Fevilwik, Cutter Blade 4 Inch, S S Screw 2 Inch, Iron L Patti, Screw Trus Head, Black Mat Paint, CPT Record Register
Power Cable For Direct Burial Xlpe Ugac Cable-IS: 10418 (Q3)
PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6615517 Dated : 01-09-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 117518 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Powergrid Corporation Of India Limited POWERGRID, ER-II CF-17, ACTION AREA-1C, NEW TOWN, KOLKATA-700156 (Powergrid) Splitting
power cable for direct burial xlpe ugac cable Experience Criteria 3 Year (s)
Supplying and laying of 3-Core HT Cable, 185 Sq. mm, 11 KV UE XLPE insulated underground Aluminium Cable
acer In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
SAMSUNG In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
Custom Bid for Services - Rigger work in Sikkim Telecom Circle Similar Category Cluster Outsourcing for Maintenance of Landline and Broadband network Copper wire
Custom Bid for Services - Single Core 300 Sqmm AL XLPE power cable and electrical installation
REPAIRS TO SECURITY LIGHTS AND LIGHTNING CONDUCTORS AT RHENOCK AND RONGLI UNDER GE 867 EWS
Supply of Misc Store for Lightening Conductor
SPL REPAIR/ REPLACEMENT/ REROUTING OF 11 KVA HT CABLE AT 2 K SUB STATION, 178 MH, 04 SUB STATIONS AND MEAT SHOP PHASE-II OF NEW CANTT UNDER GE GANGTOK
Unbranded Solid (Inner Conductor) Radio Frequency Co-Axial Cable
Custom Bid for Services - Deputation of Service Engineer from Ms GE Vernova TandD India Ltd for Inspection and Clearance during Re commissioning and Post Termination Inspection of 400 kV XLPE Cable at Transformer End Teesta V Power Station Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Job 1, Job 2, Job 3, Job 4, Job 5
LED PANEL 1200 WT, UTENSIL STAND, WOODEN RACK, COPPER WIRE, BRIEF CASE, PLYWOOD 19MM, PLYWOOD 12MM
Single HTLS Panther Dead end to Single moose/Zebra conductor (132 kV), T-connector for Twin- Moose to Single HTLS (dead end pad) – 220 KV, Twin moose to single HTLS connector (220 kV)
Supply, Erection, Testing& Commissioning of 420KV GIS, 400KV PotYard, 400KV XLPE Cable etc as per BOQ
6 Amp Socket Anchor, 16 Amp Socket Anchor, Tube Light 4 Anchor, copper wire 2 POINT 5 sqmm Anchor, copper wire 1 sqmm Anchor, Extention Cord Board Anchor, UPVC Pipe 1 INTO 10, UPVC Paste, Brass Tee 1 by 2 UPVC, Brass Elbow 1 by 2 UPVC
Repair of water conductor system from emergency gate of Intake tunnel to RD 1452 meter of HRT-U/S at Rangit Power Station