Loading…
Loading…
1,470 results • Best match
RRD on Barnali to upper Nari via Lower Nari Km. 0/0 to 3/600 (SH C/O CC Pavement at RD1/275 to 1/567 and C/o R/wall at RD 2/810 to 2/825) PDNA
Job 9 Construction of link road from Jankour Lamlehra road to Bhandari Mohalla G.P. Jankour FC 5-7 mtr. wide road, C.O Retaining Wall, Breast wall and P.L CC Pavement in Km. 0-0 to 0-110 Under MMSY
C/o Ambulance road from main road in village Bari Majherwan ward No.6 Tehsil Ghumarwin Distt.Bilaspur HP SH P/L CC Pavement at RD 0/00 to 0/022 and FC in km 0/050 to 0/120
Construction of PCC Road from Main Road in front of Shivam Hospital to Sanjeev House in ward No. 1 under MC Una HP
C/O Cement concrete pavement at RD 2/200 to 2/250 and 4/490 to 4/560 and 1.00 Mtr span culvert at RD 3/990
SH C o cement concrete pavement at RD 1 540 to 1 590 and C o PCC V shape drain at RD 1 523 to 1 553
Providing and laying Cement Concrete Pavement at essential reaches and Construction of E/Wall and D/S toe wall of HPC at km 2/810 ( Balance work)
Construction of 900 mm dia RCC hume pipe culvert at Km. 4/507 and providing and laying cement concrete pavement in Km. 4/450 to 4/550
Construction of 900 mm dia RCC hume pipe culvert at Km. 4/507 and providing and laying cement concrete pavement in Km. 4/450 to 4/550
C/O R/wall, B/wall , V-Shape drain and U-shape drain and P/L cement concrete pavement in between Km 0/00 to 7/165
Construction of Cement concrete pavement at RD 0/070 to 0/436 and 0/468 to 0/505 Hume pipe culvert and Embankment at RD 0/489)
Construction of Cement concrete pavement with V-shape drain at RD 0/130 to 0/230, 0/760 to 0/830 and 1/700 to 1/775
Providing and laying WBM G-1, G-11 and Tarring in Km. 0/195 to 1/418, cement concrete pavement at R.D. 0/450 to 0/600)
Formation cutting, Passing places, Cross drainage works, Side drain, Parapets, cement concrete pavement and Tarring work under PMGSY, Batch-II, 2018-19 package No. HP-02-350
SH Providing and laying cement concrete pavement at RD 79.260 to 79.290 79 .700 to 79.760 and construction of U shape drain at RD 80.675 to 80.895
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board and Cell Filled Cement concrete Pavement.
Repair and restoration work on link road Pandoga Ispur road to Kiarian Km 0/0 to 2/900 SH P/L CC Pavement, Causeway, crate work and cut off wall at RD 1/562 to 1/605 under PDNA 2023
Construction of link road from Ambehra Harot to Mohalla Sunarian Brahmana km 000 to 0780 SH CO 900mm dia RCC Hume pipe culvert at RD 0558 PL GSB MT CC pavement and drain between km 000 to 0585 under MNP
Up-gradation of Marredi Sillagharat Road km 0/000 to 13/800 Formation Cutting, C/o Passing Places, Missing CD, Side Drain, Parapets, CC Pavement and Tarring work under PMGSY-II, (Batch - I, 2019-20) under Package No. HP-02-03.
Construction of Swana to Gulangra Km 000 to 3115 in District Kangra H p SH Improvement Passing place Const of Retaining walls Cross Drainage work GSB WBMII WBMIII CC Pavement tarring work and parapets etcetra including five years routine maintenan
Bridge over Wardy Khad at RD 12/350 on DSS Kandi road in District Kangra (HP) Under PDNA Head (SH-Construction of G.I. wire crate R/wall protection to abutments Wheel Guard, C.C. flooring CC pavement and railings of bridge).
Bridge over Dibber khad at RD 1/060 on Samloti Sarotari road in District Kangra (HP) Under PDNA Head) (SH-Construction of G.I. wire crate , R/wall protection to abutments, wheel guard CC flooring CC pavement and railing of bridge ).
C/o link road Satian to Kutli GP Heeran Tehsil Haroli Distt.Una SH P/L CC pavement at RD 0/170 to 0/210 and C/O 900mm dia double row hume pipe culvert at RD 0/360) under MMSY
Const of and MT link road Bharwain Duhal Bangwalan road near House of Shri Suresh Kumar to village Thanikpura upto Gugga Mandir and Radhey Sham Mandir km 000 to 1500 SH PL CC pavement between km 0800 to 1050 under MNP
Repair and restoration work on link road Pandoga Ispur road to Kiarian Km 0/0 to 2/900 SH P/L CC Pavement, Causeway, crate work and cut off wall at RD 2/753 to 2/900 under PDNA 2023
P/L CC pavement, protection wall in various Rds)
Special repair to internal road with cement concrete road at FSD Hamirpur
Special repair to internal road with cement concrete road at FSD Kullu
Construction of cement concrete pavement at RD 0/0 to 0/780 and V-Shape Drain at RD 0/700 to 0/800). Under Chief Minister Announcement work.
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five years maintenance under NABARD XXVI
Construction of 900mm dia Hume pipe RCC culvert with wing walls at RD 0/900, Providing and laying cement concrete pavement at RD 0/885 to 0/960
ROFD, Wire Crate Wall, V-Shape Drain and P/L Cement Concrete Pavement from KM 0/120 to 0/285 and 1/200 to 1/500 under SCSP
C/O R/wall at Rd 0/370 to 0/390 , P/L cement concrete pavement in Km 0/255 to 0/500 ) (Job No-2) (under MMGSY)
Construction of Badhal to Dhiman Basti Buhala road Km 0.0 to 3.200 SH C.o Cement concrete pavement at various RDs between Km 0.0 to 3.200 under Industrial Corridor
P/L 900 MM DIA R.C.C. HUME PIPE CULVERT AT RD. 0/030 and P/L CEMENT CONCRETE PAVEMENT FROM RD. 0/120 TO 0/176) (DEPOSIT WORK).
C/O Path from Mandyal house to Onkar house in Ward No. 12 Sub Head - P/L cement concrete pavement, interlocking paver block and C/O retaining wall
Construction of Safeda Chowk to village Soldha Km 0/0 to 0/450 SH Construction of Cement Concrete pavement at RD 0/250 to 0/750 Under MMGSY
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five year maintenance under NABARD-XXVI
Providing and laying WBM-II, WBM-III and construction of cement concrete pavement at R.D.3/300 to 3/500 and Hume pipe culvert at R.D.3/372
Improvement, C/o passing places, missing CD, Side Drain, Parapats,Cement concrete pavement and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-781.
Construction of CC road from main entrance gate to KV school at Andal, W.B.
M/T and C.D works on Sarol Bazar i/c drain (SH Construction of PCC road side drain in Km. 0/450 to 0/745)
M/T and CD work on Sarol Bazar i/c Drain (SH Construction of PCC Road side Drain in Km. 1/475 to 1/775)
C/o link road tikkar to buhad (SH-CC pavement
P/L CC Pavement in km 0/00 to0/090
IMPROVEMENT WIDENING AND STRENGTHING OF SADWAN TO KALESHWER RAOD KM 0.0 TO 7.00 IN DISTT KANGRA HP SUB HEAD C.O R.WALLS CROSS DRIANGES WORK GSB WBM G-II WBM GIII CC PAVEMENT TARRING WORK INTERLOCKING PAVER BLOCK ROAD SIDE DRAIN AND PARAPETS
Const of link road Chowar to Jawar via Radoh Kanyari Rajpura Nari including two Nos Bridges from km 00 to 10074 SH Formation cutting including Retaining walls cross drainage work GSB MT Drain CC pavement Interlocking paver block road signage from k
RRD on Saleti to Bhindla road Km. 0/0 to 2/820 (SH C/O CC Pavement at RD 0/800 to 0/830 and C/o R/wall at RD 1/0 to 1/030, 2/600 to 2/615) PDNA
CO and MT link road Bharwain Duhal Bangwalan road near house of sh Suresh Kumar to vill Thanikpura upto Gugga Mandir and Radhey Shyam Mandir km00 to 1500 SH PL CC pavement and protection wall between km 1050 to 1250 under MNP
Construction of Karsal to Didian via Mastial Km. 0/0 to 3/400 (SH. Formation cutting 5/7 mtr wide including R/wall in Km. 0/540 to 1/0 and CC pavement from Km. 0/300 to 0/500) under OTMNP.