Loading…
Loading…
1,470 results • Best match
P/L Tarring in Km 0/225 to 0/760, C/O R/wall at Rd 0/00 to 0/015, Cement concrete pavement at Rd 0//00 to 0/100
SH Removal of formation deficiency, C/o passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Cement Concrete Pavement and Tarring work
MMSYSH Construction U.shape drain with edge wall at R.D. 2.345 to 2.545 and providing and laying cement concrete pavement at R.D. 2.585 to 2.330 3.195 to 3.218 and 3.255 to 3.361
( Sub Head - Providing and Laying Kharanjha Soling in km. 0/00 to 0/255 and Cement Concrete Pavement in km 0/00 to 0/050 under Deposit SID-BSP/2024/646)
(SH- Providing and laying cement concrete pavement in 1-1.5-3 at Km. 0/0 to 0/240, 1/180 to 2/224 and 2/556 to 2/688) Under SCSP
ROFD, R/wall, B/wall, Cross drainage, P/L GSB, WMM, Metal Tarring, Cement Concrete Pavement, side drain , parapets sign boards in Km. 0/00 to 3/450) under NABARD XXX
Re- construction of CC Road awasthi college to h/o prince in Ward No 9, Nalagarh
C/O CC Road from Pipal Thala to Baramchari temple at Rodi in W.No. 08. Palampur
Providing and laying CC pavement at RD 51/250 to 51/700
C/O CC pavement, R/wall andHume pipe culvert at various RD
Providing and laying CC Pavement in Km. 0/910 to 1/090.
P/L CC pavement at RD 0/400 to 0/600)OTMNP
Balance work of road from Ghumarwin Seer khad Bridge to Nalwari Mela Ground Ghumarwin in km 0/00 to 0/400 in Tehsil Ghumarwin Distt Bilaspur HP SH P/L of cement concrete road at km 0/00 to 0/400,Construction of Retaining wall at Rd 0/188 to 0/238 a
Providing and laying wearing and tarring, providing and laying cement concrete pavement, construction of road side drain, construction breast wall, retaining walls and formation cutting between Km 0/000 to 1/500
ROFD 5.7 mtrs. Wide at RD 1.225 to 3.00, C.O R.wall at RD 1.210 to 1.27, B.wall at RD 0.970 to 0.980 and P.L Cement concrete pavement at RD 0.0 to 0.070).
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 2/00
(Sub Head - Construction of retaining wall a RD. 0/075 to 0/081 and cement concrete pavement at RD. 0/915 to1/100 and 1/334 to 1/187 under PDNA 2023)
Formation cutting, retaining wall ,breast wall cross drainage work, GSB, WBM-II, WBM-III, Tarring , cement concrete pavement drain, parapets and road furniture including five years routine maintenance under (NABARD) RIDF-XXVIII)
Construction of retaining wall and U-Shape drain at km. 0/035 to 0/135 and cement concrete pavement at km. 0/035 to 0/040 and 0/0752 to 0/080).
C/O PCC R/Wall at 9/340 to 9/385, Cement Concrete Pavement at RD 9/340 to 9/390 and 2.00 mtr span RCC Slab Culvert at RD 9/350
Job 8 Construction of link road to Bangarh Panchayat to Village Fatehwal Lawana Basti Mehatpur Handola Road to Mehatpur Panchayat Ward No. 4 km. 0-0 to 2-200 Sub Head C.O Retaining wall, GSB, WMM, CC Pavement in RD. 0-460 to 0-720 Under OTMNP
C/O Jeepable road from Kanam Bus Stand to Lower Kanam Km. 0/00 to 0/900 (SH- C/O CC Pavement from Km. 0/405 to 0/505, B/wall in R.R Masonry at RD. 0/813 to 0/36, 0/840 to 0/863
MT on Link road Olinda to Bohru from km0000 to km 11090 under NABARD RIDF XXVII SH Formation cutting Co Retaining wall CD work CC Pavement PL GSB WMM PL Bituminous concrete Road side Drain Parapets PF Kilometer stone Sign Boards in Km 0000 to 11090
Construction of road from Patta Jatian road to Paplah bridge via Patta Brahmana in GP Patta SH Construction Edge wall with V shape drain at RD 1.400 to 1.432 and Breast wall from RD 2.245 to 2.295 LHS and providing and aying CC Pavement at RD 5.54
Restoration and repair due to laying of MDPE Natural Gas pipe line on link road from Ajouli to Sanoli upto Punjab Boundary km.0.0 to 4.600 (SH CO CC pavement at RD.1.285 to 1.675 Both sides and RD.2.450 to 2.825 Both sides (BPCL deposit)
Widening of Bhiambi to Barsar road from Km 0000 to 33500 SH 7 half 10 meter wide formation cutting RWall cross drainage work PL GSB WMM and 30mm thick Bituminous concrete CC Pavement U and V Shape drain PF W Type crash barrier km stone and si
Construction of MT on link road Repoh Piplu to Sundhari Karap Gondpur Baroh Basuni Mairi Gurudwara link road from km 000 to 10665
P/L Cement concrete pavement at rd 0/037 to 00/330 ( Actual Rd. 0/095 to 0/320) (Under PDNA) Time Limit Two month Cost of Form Rs. 500/-Job No. 5
(SH -Providing and laying Kharanja Stone Soling at km 0/210 to 0/235 and Cement Concrete pavement at km 0/235 to 0/270and 1/00 to 1/205 under PDNA 2023)
P/L cement concrete pavement in Km 5/305 to 5/435 , C/O R/wall, B/wall U-Shape drain, Grating in between Km 0/00 to 10/300 ) (under PDNA Head )
C/O R/wall at Rd 0/340 to 0/360 0/710 to 0/735 , P/L soling, WMM, Cement Concrete Pavement V-Shape drain in Km 0/800 to 1/00
Providing and laying Soling, wearing and tarring, providing and laying cement concrete pavement, construction of road side drain, construction breast wall, retaining walls and formation cutting between Km 2/500 to 3/600
SH Construction of Edge wall at R.D.0.090 to 0.120,breast wall at RD 1.270 to 1.300 and 1.450 to 1.465 and providing and laying cement concrete pavement at RD 1.300 to 1.400
PROVIDING AND LAYING G.S.B., W.M.M. AND TARRING IN KM. 1/500 TO 1/600 AND 1/665 TO 1/865 AND P/L CEMENT CONCRETE PAVEMENT AT RD. 1/600 TO 1/665)
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 3/500
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 3/100
SH Construction of Retaining wall both side 3.240 to 3.246 U.shape drain with edge wall at RD 3.070 to 3.210 and providing and laying cement concrete pavement at RD 4/230 to 4.660
Formation Cutting passing places , retaining walls, cross drainage, side drains, parapets ,cement concrete pavement and metalling and tarring) under PMGSY (Regular) Batch -II for the year 2018-19 Package no HP-02-334
Providing and laying Soling, wearing and tarring, providing and laying cement concrete pavement, construction of road side drain, construction breast wall, retaining walls and formation cutting between Km 1/500 to 2/500
Construction of Edge Wall with U-Shape Drain at Km 0/300 to 0/352,1/470 to 1/524 and Providing and laying Cement Concrete Pavement at Km 0/015 to 0/045)
Providing and laying metalling and tarring and cement concrete pavement in various reaches between Km 3/600 to 5/025 and construction of causeway at RD 4/070 to 4/085) Under SCSP
Construction of Solid Causeway at RD 0.804 to 0.828, 1.403 to 1.053, 1.109 to 1.115, 1.256 to 1.271, B.wall at RD 1.075 to 1.105 and P.L Cement concrete pavement in various slushy reaches
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 1/555
SH M.T work with BC and CC pavement, C.O U.shape drain with grating
P/L CC Pavement in km 0/00 to 0/100). (under MMGSY
C/O CC pavement at RD 16/320 to 16/400) under PDNA
C/O CC pavement at RD 0/500 to 0/900 400 mtr.
P.L CC Pavement in various RDs and Construction of V shape drain (MMGSY)
Job 1 Balance work of Construction of link road from Panjawar Bathri to Harijan Basti via Satsang Ghar Lalhri Sub Head Construction of CC pavement with edge wall at RD 0-0 to 0-150, 0-650 to 0-700 and earth filling, Providing and Laying GSB, WMM a
Up-Grad of Kulani Chandpur Bharmat Colony Kamakhya Mandir NH Holta Simblu Patti Km 0/00 to 9/300 (SH- Imp. of road, P/Places, R/Walls, B/walls, C.D Work, GSB, WBM-II, WBM-III, Tarring, CC Pavement, drain, parapets and road furniture i/c 5 years r.m.)