Loading…
Loading…
1,470 results • Best match
Restoration on Mundkhar Manoh via Nelli Jamli road km 0 00 to 4 255 SH P L CC pavement at RD 0 390 to 0 410 0 630 to 0 740 0 890 to 0 930 and V shape drain at RD 0 00 to 0 270 PDNA
C/O link road house of Sh Mohinder singh to Chotti Sidh Mandir W No 5 GP Gondpur Jaichand SH C/O V shape drain with edge wall RD 0/120 to 0/250 RHS and P/L CC pavement RD 0/00 to 0/400 under MMSY
Providing and laying Grading-II at R.D.0/540 to 0/735 and cement concrete pavement at R.D. 0/165 to 0/405 and 0/540 to 0/740). Under Chief Minister Announcement work
formation cutting,R/wall,breast wall,CD works,GSB WBM-II,WBM-III,Tarring,cement concrete pavement,drain, parapets,soild causeway and road furniture i/c five years routine maintenance under NABARD RIDF-XXVIII
Providing and laying Cement concrete pavement at RD 0/175 to 0/320, 0/380 to 0/500, 0/600 to 0/700, 1/200 to 1/300 and 1/600 to 1/700
P/L cement concrete pavement Km 0/360 to 0/455, 0/895 to 0/950, 1/755 to 2/00, 2/00 to 2/046 and 4/570 to 4/600) (Under NABARD)
Construction of retaining wall at RD 1/100 to 1/125 and providing and laying wearing at RD 2/900 to 3/130 and cement concrete pavement at RD 3/400 to 3/625
Providing and fixing roof over water storage tank in PWD qtrs. Type-I, II and III, railing, cement concrete pavement water supply and sanitary fitting etc. under Sub Division No. II HPPWD, Joginder Nagar)
C/O Solan Meenus road Km. 61/00 to 110/0 (SH C/O PCC road side drain from km. 94/500 to 102/00 in essential reaches ) Under MNP
Construction of cement concrete road from House No 106 to 112 and House No 127 to 136
Construction of Cement Concrete road from house No 106 to 112 and House No 127 to 136
SH C/o CC Pavement at RD 2/460 to 2/490 Balance work
C/O R/wall alongwith CC pavement between Rd. 0/260 to 0/290
C/O R/wall alongwith CC pavement between Rd. 0/190 to 0/202
Construction of PCC R/Wall at RD 15/005 to 15/033 Cement Concrete Pavement 15/005 to 15/205 and Drain at RD 15/005 to 15/155 and HPC at RD 15/120
M/T on Himat Pur Dabli kheel Dharampur Basolu road in km 0/0 to 6/165 SH Interlocking tile pavement at various RD and C/O cement concrete pavement at various Rd under SCSP
Formation cutting, Passing Places, R/walls, Cross drainage works, GSB, WBM G-II, WBM G-III, Tarring work, Cement concrete pavement, Road side drain and Parapets, P/F Road Furniture including five years routine maintenance
SH Construction of retaining wall at R.D.0.025 U.S of existing HPC and 0.030 to 0.070 Left side R.D. 0.025 to 0.043 RHS and providing and laying cement concrete pavement at R.D.0.00 to 0.233
Providing and laying cement concrete pavement from Km. 0/930 to 0/130 and Tarring in various RDs Km. 0/550 to 0/800, 0/850 to 0/993 and 1/330 to 1/550
C/O 3.00 mtrs. Span RCC slab type culvert at Rd. 0/570 and P/L Cement concrete pavement at Rd. 0/390 to 0/430 and 0/450 to 0/480) Under SCSP Head
ROFD, R/walls, B/walls, CD work, P/L GSB,WMM, Metal Tarring, Cement concrete Pavement, interlocking tiles, side drain, parapets sign board etc. in km 0/0 to 4/100) Under NABARD RIDF-XXX
Construction of retaining wall at RD. 0/370 to 0/387 and cement concrete pavement at RD. 0/0 to 0/370, 0/450 to 0/640and 1/550 to 1/650 under PDNA 2023
Construction of formation cutting 0/0 to 3/0, cement concrete pavement at R.D. 0/0 to 1/0 and V-Shape Drain at RD 0/800 to 1/0). Under Chief Minister Announcement work.
SH Formation cutting, Passing places, Retaining walls, Cross drainage work, Providing and laying Granular Sub Base, WBM-II, WBM-III, Tarring work, Cement concrete Pavement, side drain and Parapets) including five year maintenance after completion
ROFD for 5/7 mtrs wide, R/walls/ breast walls, C.D, M/T, Interlocking paver block, Cement Concrete pavement, drain, Parapet Road Furniture etc in km 4/00 to 7/746) (Under Nabard RIDF XXXI)
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc.
ROFD for 5/7 mtrs wide, R/walls/ breast walls, C.D, M/T, Interlocking paver block, Cement Concrete pavement, drain, Parapet Road Furniture etc in km 0/0 to 4/00) (Under Nabard RIDF XXXI)
Providing and laying bituminous macadom and bituminous concrete with Paver Finisher in Km-2/000 to 3/700 and cement concrete pavement at RD-2/120 to 2/200 and 3/285 to 3/405
Formation cutting, C/O Passing places, Breast wall, Retaining wall, Gabion wall, Missing CD, Road side Drain, parapets , Crash Barrier, Road sign Board, Bio Engineering works, Cell Filled Cement concrete Pavement and Tarring work etc.
SH Construction of Retaining wall at RD 0.460 to 0.466 0.480 to 0.489 0.510 to 0.519 Edge wall at RD 0.450 to 0.492 and providing and laying cement concrete pavement at RD 0.536 to 0.600
(Sub Head- Providing and laying Kharanja stone soling at km.0/400 to 0/450 and cement concrete pavement at km.0/400 to 0/450 and 0/0 to 0/255 under PDNA 2023
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work etc
SH Constructiion of R/wall, cross drainage works and cement concrete Under SCSP
A/R and M/O Paller Pidiyadhar Road Km. 0/00 to 17/00 (SH -C/O PCC road side drain from km. 2/500 to 4/200 at essential reaches.
Job 1 Construction of link road Nagnoli to Harizan basti (via Mohalla Brahmana, Gujran Chooti khad km..0-0 to 3-345 Sub Head Providing and laying CC Pavement at RD.1-191 to 1-310 and premix carpet with seal coat at RD.1-795 to 2-076 Under SCCP
Up-gradation of Holta to Tanda Holta road km 0/0to5/500 (Pkg No HP-04-420 ) under PMGSY-III (Batch-I, 2022-23) in Distt Kangra HP (SH- Imp, P/places, Missing CD, S/Drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etc i/c 5 year RM)
Restoration of rain damages on Kailu di Bar to Godri Sidh km 00 to 3300 SH CO Breast wall at RD 2100 to 2175 RHS Retaining wall at RD 2105 to 2135 LHS V-Shape drain at RD 2180 to 2480 and CC Pavement at RD 2110 to 2310 Under PDNA2023
Job 1 Construction of link road from Shahtoot Bagh Khad Harizan Basti to National Highway Pandoga Tehsil Haroli Distt. Una HP Km. 0-0 to 2/600 Sub Head P.L CC Pavement at RD. 0-200 to 0-370, C.O Edge wall at RD. 0-620 to 0-670 Under OTMNP
C/O link road to Harijan Basti Polian Km 0/00 to 1/500 (SH P/L Paver block at RD 0/250 to 0/300, P/L CC pavement in extra width with RD 0/130 to 0/150 LHS, C/o R/wall RD 0/030to 0/040
Upgradation of link road Umrali Dhilwan Heeran Thara Pubowal to Polian via Kuthar Beet from Km 0/00 to 3/400 (SH FC, CD,P/L GSB,WMM,DBM,BC C/o CC pavement, U-shape drain, Parapets Km 0/0 to 3/400 and Road side furniture etc.) under OTMNP
B/W of Tanda Pantehar Dharaman Band Vihar Moli Chak Kandwari Nanahar road Km 0/00 to 10/00 (Under RIDF-XXIII) (SW- B/W C/o 3.00 mtrs Span Culvert, P.C , CC pavement, P/L Wearing and CC to extended portion (Both side berms) Km 0/500 to 1/700)
Construction of road from Bagshar, Shanvagi, Gadari,Kharahal Kund Besta road Km. 0/0 to 16/110 (SH- Formation cutting, Passing place, C/o R/wall, C/o CD works, P/L GSB,P/L wet mix Macadam, P/L30mm BC, P/L CC pavement, road side drain, perapets etc
C/o L/R towards House of Sh. Roop Lal, Neeraj, Surinder, Suresh etc. from Rera Dibla Chowk GP Taraun SH C/o R/wall at RD 0/020 to 0/029 AND 0/210 to 0/225 and P/L CC Pavement at RD 0/00 to 0/047
Restoration and reconstruction of sampark marg from Baba Charang Nath Mandir to the H/o Sh Om Parkash. village Janani, W.No. 1, GP Polianbeat SH C/O V shape drain with edge wall RD 0/120 to 0/250 RHS and CC pavement RD 0/135 to 0/302 under MMSY
R M Link road to Shamshanghat of Beri Brahmna in GP Bhukkar Tehsil Bhoranj Distt Hamirpur HP SH CO CC pavement at RD 0110 to 0215 R/wall at RD 0110 to 0120 and edging at RD 0 020 to 0 110 HPC 450 dia at RD 0/110 Deposit Work
C/o cc road to h/o Jitender, Vijay Chouhan and others in ward no. 07 Bindraban MC Palampur
Construction of Cement concrete pavement at RD 6/200 to 6/270, 6/670 to 6/770 and 6/800 to 6/900 and PCC drain with edge wall at RD 6/800 to 6/900
Formation cutting, Retaining walls, cross drainage works, GSB, WBM-II WBM-III, Tarring, cement concrete pavement, drain, and construction of 25.00 mtr span Box Girder bridge over Guglahar Nallah including five years routine maintenance)Under NABARD