Loading…
Loading…
1,470 results • Best match
SH Providing and laying cement concrete pavement at RD 0.500 to 0.550 0.600 to 0.650 0.750 to 0.850 and construction of U. shape drain at RD 0.600 to 0.680 3.400 to 3.450 and 3.525 to 3.575
P/L GSB/G-II and 20mm thick premix carpet with seal coat at RD 0/600 to 0/710, 0/770 to 1/0 and cement concrete pavement at RD 0/710 to 0/770.
Construction of 40.00 metre span bridge, Formation cutting, passing places, Retaining walls, Cross drainage work, GSB, WBM-II, WBM-III, tarring work, Cement Concrete pavement, side drain and parapets including five Year Routine Maintenance after comp
SH providing and laying interlocking paver block pavement at RD 3.050 to 3.125 cement concrete pavement at RD 3.315 to 3.415 and construction of edge wall and U shape drain at RD 3.315 to 3.450 LHS
Construction of Edge wall (H 0.90) at RD. 0/836 to 0/876 (Right side) and Providing and Laying Cement Concrete Pavement at RD. 0/475 to 0/505 and 0/766 to 0/876 Mohal).
Construction of retaining wall, Breast wall, road side drain, repair of culverts, wire crate protection work, providing and fixing crash barriers and cement concrete pavement road in various reaches between Km 3/000 to 14/400
Providing and laying GSB, G-II, G-III at RD. 03/525 to 03/780 and premix carpet in km. 03/300 to 03/780 and cement concrete pavement at RD 03/780 to 03/800
C/O B/wall at Rd 0/00 to 0/030, U-Shape drain at Rd 0/00 to 0/050 P/L cement concrete pavement at Rd 0/00 to 0/050) (under PDNA Head)
SH Construction of Retaining wall at R.D. 0.360 to 0.400 and 2.450 to 2.480 U shape drain at R.D. 0.800 to 0.900 providing and laying cement concrete pavement at R.D. 1.365 to 1.405 2.400 to 2.570
P/L GSB, CC Pavement V-shape Drain at km 0/00 to 0/375
SH Repair of pot hole with CC pavement at RD 4 725 to 4 850
P/L filling with both side E/wall, hume pipe 450mm, Soling and CC pavement.
SH Providing and laying CC pavement at RD 0/090 to 0/210 under MMGSY
Restoration of rain damage on budha C/O R/wall, cc pavement retaining wall etc.
SW C/O R/Wall, Wirecrate, side drain WBM-II, CC Pavement and tarring work
SH PL GSB CC Pavement V-Shape drain in km 0 0 to 0 400
P/L CC Pavement at RD 0/105 to 0/197) Deposit SDP/2023/928
P/L G-II G-III Tarring work and CC Pavement) Under Nabard RIDF-XXVII
P/L CC pavement at RD 0/00 to 0/145) Deposit SDF/2023/801
CC Pavement, C/O Edge wall in km 0/500 to 0/870). (under MMGSY)
Construction of retaining wall interlocking paver block and CC pavement on various RDs Under PDNA
A/R and M/O Dalyanoo Pillilani Nainidhar road km. 0/00 to 22/800 (SH C/O PCC road side drain from km. 0/00 to 4/00 in essential reaches )
C/O Piplighat Bag Baunal road km. 0/00 to 3/00 (SH- P/f Interlocking Paver Block and C/O PCC road side drain from RD. 2/00 to 2/270)
SH Construction of cement concrete road and Court Yard surfaces in the campus of make shift Hospital Job No.I
SH Construction of cement concrete road and Court Yard surfaces in the campus of make shift Hospital Job No.II
C.O 900mm dia RCC Hume pipe culvert with wing wall at RD 4.300),Providing and Laying Cement Concrete pavement at RD 5.320 to 5.350 and construction of Solid causeway at RD 5.310 to 5.320) Deposit SDP.2024.442
SH Construction of Breast Wall at RD 1.505 to 1.520 900mm dia RCC hume pipe culvert at RD 1.795 and 2.310 and providing and laying cement concrete pavement at RD 1.750 to 1.930 and 3.0 to 3.250
Formation cutting intermidiate standard, C/o Retaining wall, Cross drainage, P/L GSB, Metalling and tarring, Cement concrete pavement, C/o Road side PCC drain, Parapet, road side furniture etcetra) under Central Road and Infrastructure Fund ( CRIF)
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, Plastic cell filled cement concrete pavement and Tarring work including five years routine maintenan
ROFD, R/wall, B/wall, Cross drainage, P/L GSB, WMM, Metaling Tarring, Cement Concrete Pavement, Interlocking tiles, side drain , parapets sign boards in Km. 0/00 to 8/00) Under NABRD XXXI including 5 year maintenace
C/O R/wall at Rd 0/020 to 0/030, U-shape drain at Rd 0/050 to 0/100 and P/L Cement concrete pavement at Rd 0/00 to 0/100) (under PDNA Head)
C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work including five years routine maintenance
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, Plastic cell filled cement concrete pavement and Tarring work including five years maintenance etc
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement, Dumping Site and Tarring work etc.
Job 1 Construction of Link road from Tarkhan Mohalla Shiv Mandir to GPS Singan-II Ward No-4 in G.P. Singan Sub Head C.O CC pavement at RD 0-0 to 0-150 and C.O Retaining wall at RD 0-0 to 0-150 and RD 0-030 to 0-152 - Under MMSY
Restoration of Mundkhar Manoh via Nelli Jamli rod KM 0 00 to 4 255 SH PL CC pavement at RD 1180 to 1 290 2 690 to 2 790 2 900 to 3 180 and V shape drain at RD 2 800 to 3 00 3 800 to 3 910 Under PDNA
R M of various roads under SCDP Demand 32 in Pragpur Sub Division (SH C/o C/o CC Pavement at RD 1/630 to 1/690 (3 75 mtr wide) on Harizan Basti Saluhi road and C/O R/wall at RD 2/555 to 2/570 on Saleti to Bhindla road)
RR Damages on RCD road km 00 to 2200 SH CO BWall in PCC road km 00 to 2200 CO BWall in PCC 136 stone Masnoary cm 16 at RD 0900 to 0951
P/L CC Pavement, G-II, G-III and 20mm pre mix carpet including seal coat
SH- C/o CC pavement between RD 27/945 to 28/023 alongwith U shape drain
P/L GSB, CC Pavement V-shape Drain in km 0/00 to0/700). (under MMGSY)
P/L CC Pavement and edge wall in km 0/00 to 0/090). (under MMGSY)
SH CO CC pavement BWall and Ushape drain etc in km 0000 to 0200 Under SCSP
C/O Passing places, missing CD, R/wall, side drain, parapets ,CC pavement and Tarring work
P/L WMM,CC Pavement and Edge wall in between km 0/00 to 7/165).
C/O Passing place, missing C.D., side drain , parapets, crash barrier, CC pavement and Tarring work
C/O U-shape Drain, P/L CC Pavement in km 0/00 to 0/350
Restoration of rain damages on Bhager Panol Sunhani road in km 0/00 to 3/300 SH C/o Cement Concrete road to village Kangar in km 0/00 to 0/350, R/wall at RD 0/150 to 0/190, B/wall at RD 0/310 to 0/340 and U-shape drain at RD 0/050 to 0/350 under PDN
ROFD in Km 0/255 to 1/060 and C/O R/wall and B/wall in various Rds. And Cement concrete Pavement at0/060 to 0/100, 0/405, to 0/450 0/515 to 0/650
P/L wearing grade-II in Km. 0/400 to 0/500, Kharanja soling and cement concrete pavement in Km. 0/700 to 0/800 and premix carpet with seal coat in Km. 0/0 to 0/500