Loading…
Loading…
1,470 results • Best match
C/O link road from village Naiyan Basti Baliwal to Mohalla Rajputtan Km 0/00 to 1/600 G. P. Baliwal SH C/O CC pavement at RD 0/00 to 0/358 and 900 mm dia pipe culvert at RD 0/020 and C/O U shape drain at RD 0/00 to 0/045-RHS)- under MMSY
Restoration and reconstruction of link road Hira Nagar Dagrani Tobba to main road Dulehar via Ravi Dass Mandir Dulehar Upperla Km.0/00 to 2/00 SH C/O R/wall RD 0/720 to 0/736 LHS and edge wall RD 0/775 to 0/800 BHS and C/O CC pavement RD 0/635 to
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, CC pavement and V-Shape drain
SH P L CC pavement at RD 0 300 to 0 350 to 0350 0450 to 0 500
P/L CC Pavement at RD 3/060 to 3/159, cutting of hump earth cutting and Parapets
Balance work of Road side structure, GSB, G-II, G-III, tarring work and CC pavement) under NABARD
P/L CC pavement and side drain at RD 0/300 to 0/366) Deposit BSP/ 2021/37
C/O Formation cutting , CC pavement and hume pipe culvert between Km 0/00 to 0/420) MMSY
C/O Formation cutting , CC Pavement and Humi pipe culvert between Km 0/00 to 0/420) MMSY
Supplying and stacking of crushed stone aggregate 20mm, Course sand and Boulder
C/o cc road and p/l cc paver from h/o Ajeet towards h/o Anup Dhiman in ward no. 09 chowki
SH Formation cutting in Km. 0 600 to 0 800, Co Rwall at RD 0 615 to 0 630 and 0 705 to 0 725 and Providing and laying cement concrete pavement in Km. 0 600 to 0 800 under OTMNP Head
Formation cutting, Passing Places, R/walls, Cross drainage works, GSB, WBM G-II, WBM G-III, Tarring work, Cement concrete pavement, Road side drain and Parapets including five years routine maintenance in Km 0/0 to 6/580). (Under NABARD RIDF-XXIX).
(SH-Construction of Retaining wall at km 0/273 to 0/300, Breast wall at km 0/270 to 0/285 and providing and laying Kharanja Stone Soling and Cement Concrete pavement at km 0/060 to 0/340 under PDNA 2023)
Providing and Laying 25 mm Bituminous concrete at km-8/000 to 8/600, 8/645 to 8/710 and 8/740 to 8/930 and Cement Concrete Pavement at km-8/600 to 8/645 and 8/710 to 8/740 )
SH Construction of Retaining wall at R.D.0.215 to 0.230 0.740 to 0.750 1.020 to 1.040 1.170 to 1.200 U shape drain at R.D. 1.00 to 1.100 providing and laying cement concrete pavement at R.D. 0.0 to 0.080 and 1.00 to 1.105
Formation Cutting, Passing Places, R/Walls, B/Walls, Cross Drainage Works, GSB, WBM G-II, Tarring Work, Cement Concrete Pavement, Road Side Drain, Parapets, Road Furniture i/c Five Years Routine Maintenance in KM 0/0 to 7/160) under NABARD RIDF-XXVII
F/C, C/o R/wall CD work, P/L Gramular Sub base, WBM-II, WBM-III, Tarring, Cement concrete pavement, road side drain, Parapets and providing and fixing Sign boards etc i/c maintenance for five year after completer of construction work.)
ROFD, C/O wire crates/gabion walls, R/walls, M/T, cement concrete pavement, C/O road side parapets, providing crash barriers, C/O V-shape and U- shape drains, X-drainage work including 5 year routine maintenance after completion of work
Formation cutting, Passing Places, R/walls, Cross drainage works, GSB, WBM G-II, WBM G-III, Tarring work, Cement concrete pavement, Road side drain and Parapets including five years routine maintenance in Km 0/0 to 3/00). (Under NABARD RIDF-XXIX).
C/O Cement concrete pavement at various RD,s 0/331 to 0/377.40, 1/260 to 1/267 and U-shape drain at RD 0/281 to 0/331 and R/Wall at RD 1/267 to 1/297 in RHS
SH Construction of 5/7 metre wide road formation cutting 900mm dia RCC Hume Pipe Culvert, cement concrete pavement construction of V-Shape drain providing and laying parapets metaling tarring sign board and km stone in km 0/0 to 1/300
C/O passing places missing CD side drain parapets CC pavement and Tarring work including five years maintenance under PMGSY Batch I 2018 19 package No HP 04 379 and C/O passing places missing CD side drain parapets CC pavement and tarring work in
Improvement, R/walls, C.D. work, GSB, WMM, tarring work, CC pavement, Paver block, side drain and parapets under OTMNP
C/O R/Wall, P/L CC pavement and interlocking concrete paver block at various RDs) under Industrial Corridor
P/L GSB, CC Pavement Edge wall in Km. 0/00 to 0/500). G.P. Kandrola Plassi (under MMGSY)
C/O R/Wall, P/L Soiling and CC Pavement in km 0/180 to 0/250. (Under PDNA)
SPL REPAIR TO ROAD AND DRAINAGE AT MT SHED, E-37, E-38, E-49 AND E-50 WASHING POINT AT ALHILAL AND PCC ROAD 200 MTR APPROX FROM POLICE GATE TO MT PARK AT PALAMPUR MIL STN
SH Co U Shape drain hard shouldering in km 0375 to 0510 and CC pavement in km 0460 to 0535
Construction of RWall at RD 0/075 to 0/095 and CC Pavement in Km 0/0 to 0/175
Improvement, Construction of Passing Places,Missing CD, Side Drain, Parapets, CC Pavement, Interlocking Paver Block, Tarring work and Sign boards
Improvement, Construction of Passing Places, Missing CD, Side Drain, Parapets, CC Pavement, Interlocking Paver Block, Tarring work and Sign boards).
C/o PCC R/wall and CC pavement at damaged stretches at Km. 0/315 to 0/450) Under PDNA
SH ROFD, C/O passing places, CD CC Pavement, M/T and Five years routine maintenance) Package No.HP-06-201.
SH F/C C/O Passing places, side drain, Parapets,Cross Drainage, CC Pavement, M/T Package No.HP-06-194.
CC Pavement at RD 0/909.50 to 0/1057.50, 1/060 to 1/171.80 and 1/227.40 to 1/679.40
SH C O edge wall at RD 0390 to 0400 and CC pavement at RD 0 300 to 0 429
Providing and laying WBM G-I, G-II and Tarring in Km. 3/00 to 4/200,Cement concrete Pavement at R.D. 3/480 to 3/550 and Construction of 900mm Dia HP Culvert at R.D. 3/150, 3/855, 4/105 and 4/180
C/O U-shape drain at RD 2/0 to 2/200, 2/700 to 3/0, Edge wall at RD 2/130 to 2/160(both side) 2/800 to 2/850 and Cement concrete pavement at RD 2/060 to 2/100
Construction of link road NH-88 Paisa Chowk to Un-Connected Basti Balugaloa Km 0/000 to 2/000 in Distt. Kangra (H.P.). Under SCSP Head (SH-Construction of WBM Grade-I and cement concrete pavement (M-30) at RD 0/000 to 0/500)
Providing and laying Cement Concrete Pavement at RD 0/380 to 0/400 and V-Shape Drain at Km 0/250 to 0/400, 2/100 to 2/300, 3/550 to 3/700 and wire Crate work at RD 3/600 to 3/660)
C/O 3.00 mtr span RCC slab type culvert at Rd 0/240, C/O R/wall at Rd 3/360 to 3/365, 7/050 to 7/075 P/L cement concrete pavement in between Km 0/00 to 7/165) (under PDNA Head
P/L cement concrete pavement at rd 0/080 to 0/310, V-shape drain at Rd 0/310 to 0/630, Edge wall at Rd 0/125 to 0/140 and M/T in km 0/310 to 0/630) (Under SCSP Head
Construction of Retaining wall at Km 4/435 to 4/452, 6/370 to 6/394, U-Shape drain at RD 4/280 to 4/420, 4/650 to 4/720 (left side) and Cement Concrete Pavement at Km 2/370 to 2/405)
ROFD in km. 0/0 to 0/075, R/wall / B/Wall at vrious km,. 0/0 to 1/0, P/L Cement concrete pavement at Rd. 0/0 to 0/115, 0/170 to 0/180 0/700 to 0/950) Under OTMNP Head
Construction of P.C.C. Retaining wall at RD 0/380 to 0/390 L.H.S., cement concrete pavement at RD 0/200 to 0/300 and 0/800 to 0/900 and V-Shape Drain at RD 0/200 to 0/320). Under Chief Minister Announcement work
Supply and Stacking of Crushed/Broken Stone agg. 20mm and Sand.
R.O.F.D., protection work, cross drainage works, GSB, G-II and G-III, DBM, BC, Cc pavement, road furniture and dumping structure
Const. of CC Pavement at RD. 3/040 to 3/388 and C/o PCC Drain 3/040 to 3/388
ROFD, protection work, cross drainage works, GSB, G-II and G-III, DBM, BC, Cc pavement, road furniture and dumping structure