Loading…
Loading…
1,471 results • Best match
( Improvement, passing places, missing cross drainage, side drain, parapets,crash barrier,CC pavement , Tarring and road signs etcetera including five year routine maintenance) under
SH Construction of Rwall LHS. at RD 4.820 to 4.850and 6.270 to 6.280 and embankment filling and CC. pavement at RD 4.820 to 4.843
ROFD work in km 2/610 to 2/790 and P/L CC Pavement 2/610 to 2/670 2/675 to 2/790
C/o R/Wall at RD 0/105 to 0/125 and CC pavement at RD 0/0 to 0/150 UNDER BASP Deposit
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
SH Metalling Tarring, Retaining wall, Breast wall, cross drainage, PCC Drain, CC Pavement, Imp. of curves, setting Out, Parapet and 5 year routine maintenance
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
C/o edge wall at RD 0/550 to 0/562 P/L CC Pavement at RD 0/382 to 0/513 under BASP
Construction of R wall at RD 0/302 to 0/320 and CC pavement at RD 0/300 to 0/460 under BASP Deposit
SH RODF, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-189.
SH RODF, C/O passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-205.
SH RODF, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-204.
P/L CC Pavement at RD 0/00 to 0/300 C/O R/wall at RD 0/045 to 0/090). (Under MMGSY)
C/O R/wall at Rd 0/300 to 0/315 B/wall at Rd 0/380 to 0/390 ,P/L Cement concrete pavement at Rd 0/050 to 0/140 , 0/210 to 0/290 , 0/350 to 0/550 0/600 to 0/650) (under PDNA Head)
Formation cutting ,construction of passing places ,side drain, parapets, cross drainage, sell filled Cc pavement, metalling and tarring work exctra including five year routeen maintenance
Formation Cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain and parapets) (Under NABARD RIDF-XXVI)
P/L GSB, G-II, Metalling Tarring at RD 0/0 to 0/500 and CC pavement at RD 0/500 to 0/700)OTMNP
Balance work Sajao to Chatrayana km 0.0 to 2.135 ic WBM-II, III, MT, CC Pavement and V Shape Drains in km 0.600 to 2.135
C/O edge wall at RD 0/030 to 0/040 P/L CC Pavement at RD 0/00 to 0/100 (under PDNA Head)
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
C/O 1.00 Mtr. Span RCC slab culvert at RD 0/620, Hume pipe culvert at RD 7/240,7/310, side drain and CC pavement
GSB, WMM, Premix carpet seal coat in km 0/0 to 0/500 CC pavement in km 0/050 to 0/070). (under OTMNP Head)
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
Sub Head- Improvement, Passing places, Missing Cross Drainage, side drain, Parapets, Crash barrier, CC Pavement, Tarring and road signs etcetra including five year routine maintenance
C/O Khranja soling AND CC pavement in various RDs 1/780 to 1/855,2/090 to 2/195 and 2/300 to 2/390)
SH F/C, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-180.
P/L CC Pavement at RD 0/00 to 0/100, P/L GSB M/T in km 1/450 to 2/00). (under MMGSY)
SH F/C, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-186.
SH F/C, C/O Passing places, Side Drain, Parapets, Cross Drainage, CC Pavement, M/T and Five years routine maintenance Package No.HP-06-190.
SH F/C, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-187.
SH F/C, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-183.
P/L CC Pavement in km 0/670 to 1/00 V-shape Drain in km 0/300 to 1/00 in Leg No. 4)
Removal of Formation Deficency, Formation Cutting, R/wall, B/wall, CD works and CC Pavement etc. i/c Five year maintenance under NABARD RIDF XXVI.
(ROFD, Improvement, passing places, missing cross drainage, side drain, parapets, crash barrier, CC pavement, tarring and road signs etcetera including five year routine maintenance) under
Providing and laying wearing Grade-II in Km. 11/600 to 12/475 and BUSG, Bituminous concrete 30mm thick in Km. 11/0 to 11/765 and 11/870 to 13/0, cement concrete pavement in Km. 11/765 to 11/870 and V-shape drain between Km. 11/0 to 11/800
ROFD Removal of formation deficiencies C/o wire crates Gabion walls C/o R/walls and B/walls P/L M/T C/o cement concrete pavement C/o Parapets Providing and erecting crash barrier system C/o V-shape and U-shape drains X-drainage works i/c 5 years rout
SH Construction of PCC retaining wall breast wall at RD 0/360 to 0/372 and 0/375 to 0/390 C/o 900mm dia RCC Hume Pipe Culvert at various RDs and cement concrete pavement paver block Providing and laying GSB WMM BC in km 0/0 to 0/500 and Const
C/O Link road Village Kajwa Km. 0/0 to 2/150 (SH P/L WBM G-ll, G-lll and M/T alongwith PCC road side drain in Km. 0/0 to 1/0 and 900mm dia hume pipe culvert at RD. 0/090,0/195)
C/O B/wall at RD 0/930 to 0/952 and P/L CC Pavement and U-shape Drain at 0/930 to 0/990
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets and road furniture including five year maintenance) under NABARD RIDF XXVII
Sub-Head Formation Cutting Passing Places R/Wall GSB WBM-II WBM-III Tarring Work CC Pavement Side Drain And Parapets including five year routine maintenance)
C/O Passing places, Missing CD, side drain , parapets,crash barriers, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
(Sub Head- Providing and laying Kharanja Soling and CC Pavement at RD 0/200 to 0/300 and 0/400 to 0/453 under PDNA 2023
C/O Passing places, Missing CD, R/walls, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19)
SH C O R wall at RD 1 200 to 1 230 CC Pavement at RD 1 700 to 2 00 and V shape drain PDNA
C/O CC pavement at RD 9/580 to 9/645 and C/O U-shape drain at RD 9/460 to 9/645 in RHS
P/L GSB, WMM from Km 0/00 to 0/405, cement concrete pavement at Rd 0/405 to 0/800 and C/O B/wall at Rd 0/155 to 0/165, R/wall at Rd 0/220 to 0/230, 0/260 to 0/274 and 0/550 to 0/560) (under MMGSY)