Loading…
Loading…
1,471 results • Best match
Formation Cutting at RD 2/375 to 2/500, R/wall at RD 2/365 to 2/450 and 900mm dia Hume Pipe Culvert at RD 2/200 and C/o Cement Concrete pavement at RD 2/225 to 2/350 ) and Edge wall at RD 2/165 to 2/225 Under Industrial Corridor
C/O PCC Road Side drain in Km. 3/00 to 6/00)
C/O PCC Road Side drain in Km. 11/480 to 14/480)
C/o PCC Road side drain in Km. 64/700 to 66/00)
C/o PCC Road side drain in Km. 64/700 to 66/0)
C/O PCC Road side drain in Km. 8/400 to 13/400)
C/O PCC Road Side drain in Km. 8/500 to 11/500)
C/O PCC Road Side drain in Km. 4/200 to 6/00)
C/O PCC Road side Drain from Km. 102/ 00 to 107/00)
C/o PCC Road Side Drain in Km 0/0 to 4/200
(SH- CC pavement in a length of 0.675 Km. in different demanding locations for Batail side and interlocking tiles in built up area in 0.100 Km. length)
C/O Passing places missing CD R/walls side drain parapets CC pavement and Tarring work under PMGSY Batch I 2018-19 Package No HP 04 376
P/L CC Pavement at RD 0/00 to 0/300 R/wall at RD 0/040 to 0/060 0/150 to 0/156.60)(Under MMGSY)
Improvement, C/o Passing places, CD works, side drain, parapets, CC pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-525.
C/O Link road Village Kajwa Km. 0/0 to 2/150 (SH P/L WBM G-ll, G-lll and M/T along with PCC road side drain in Km. 0/0 to 1/0 and 900 mm dia hume pipe culvert at RD. 0/090,0/195)
Restoration of Rain Damages on Nohra Hinda Bandal road km. 0/0 to 5/300(SH P/L WBM G-I from km. 4/0to 5/0 and C/O PCC road side V-shape drain in patches in km. 0/0 to 5/300) Under PDNA 2023
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Providing and Fixing MS Channel and M.S. Plate at RD 0/940 to 0/955 and CC Pavement Along with drain at Km 0/900 to 0/960
C/o Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets and road furniture including five year routine maintenance
C/O R/wall at various RDs, P/L CC Pavement at RD 1/550 to 1/600 and V-shape Drain at various RDs) (under PDNA Head)
Earth work, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Providing and Laying Kharanja Stone Soling, Providing and Laying CC Pavement 1 1 5 3 at RD 0/450 to 0/650 and Retaining Wall at various RDs
FORMATION CUTTING IN KM. 1/300 TO 1/700, R/WALL/ W/BALL AT VARIOUS RDS, P/L CEMENT CONCRETE PAVEMENT AT RD. 1/400 TO 1/410, G.S.B, W.M.M and P/L TARRING IN KM. 1/300 TO 1/400, 1/410 TO 1/700 and P/L 900MM DIA R.C.C. HUME PIPE CULVERT AT RD. 1/4
C/O V-Shape drain in Km 1/800 to 1/850 U-shape drain in Km 1/720 to 1/760 1/880 to 1/910 , Edge wall at Rd 1/645 to 1/850, Grating in Km 1/780 to 1/910 P/L cement concrete pavement in Km 0/150 to 0/255
P/L Cement concrete pavement at rd 2/660 to 2/700, 3/100 to 3/150, 3/290 to 3/390 and V-shape drain at Rd 0/600 to 0/700,6/780 to 6/850 and 8/350 to 8/520) (Under PDNA) Time Limit Two month Cost of Form Rs. 2000/-Job No.4
FORMATION CUTTING IN KM. 1/300 TO 1/700, R/WALL/ B/WALL AT VARIOUS RDS, P/L CEMENT CONCRETE PAVEMENT AT RD. 1/400 TO 1/410, G.S.B., W.M.M. P/L TARRING IN KM. 1/300 TO 1/400, 1/410 TO 1/700 P/L 900MM DIA R.C.C. HUME PIPE CULVERT AT RD. 1/450) (UN
Construction of V-shape drain at R.D. 0/00 to 0/035 LHS and 0/035 to 0/100 RHS , Edge wall at RD. 0/075 to 0/090, P/L cement concrete pavement at RD. 0/176 to 0/356 and C/o 900mm dia RCC Hume pipe culvert at R.D. 0/160 Deposit work
SH-Construction of Retaining wall at RD 2/755 to 2/772 2/872 to 2/902 Providing and laying Cement Concrete Pavement at RD 2/755 to 2/772 2/872 to 2/882 2/950 to 2/954.50 Drain at RD 2/872 to 2/972 and construction of R.C.C. hume pipe culvert 900mm d
ROFD in km 0/510 to 0/975, P/L 900mm dia RCC Hume Pipe Culvert at Rd 0/830, 0/935, 1/125 P/L Cement concrete Pavement at RD 0/090 to 0/120, 0/270 to 0/300 P/L GSB, WMM, V/U - shape Drain at RD 0/00 to 0/300). (Under MMGSY)
Providing and laying Cement Concrete Pavement at RD 0/740 to 0/840, 1/150 to 1/270, V-Shape Drain at Km 0/600 to 0/800, 1/150 to 1/300, Retaining wall at Km 0/820 to 0/835, 1/260 to 1/280 and RCC Hume pipe culvert at Km 1/980)
ROFD in Km 1/480 to 2/060, P/L GSB,WMM, M/T,cement concrete pavement , U-Shape drain at various RDs, B/wall at Rd 1/840 to 1/865, R/wall at Rd 1/520 to 1/540, 1/910 to 1/945, 1/690 to 1/750 1/990 to 2/005 ) (under PDNA)
SH C/o PCC retaining wall breast wall at RD 0/360 to 0/372 and 0/375 to 0/390 C/o 900mm dia RCC Hume Pipe Culvert at various RDs and cement concrete pavement paver block P/L GSB WMM BC in km 0/0 to 0/500 and C/o U Shape Drain
Providing and laying 20mm thick premix carpet with seal coat at RD 1/460 to 1/550, 1/570 to 1/825, 1/985 to 2/150 and cement concrete pavement at RD 1/550 to 1/570 and 1/825 to 1/870 on Pukharbar 1410 Dam area to village Khabbal road km 0/0 to 4/0
Estimate for left out civil work R wall cement concrete Road U shape drain chain link fencing gate for proposed 33/11 KV 1x3.15 MVA Sub station at Taniyahar under ED HPSEBL Dharampur
A/R and M/O Danoi khud Drabil Road KM 0/0 to 18/945 (SH C/O PCC Road Side drain in Km. 0/060 to 0/180,0/255 to 0/320,1/055 to 1/155,1/570 to 1/650,2/080 to 2/160, 2/720 to 2/795)
(Sub Head- C/O of Retaining wall at km at RD 1/160 to 1/170 and CC Pavement at RD 3/370 to 3/960 under PDNA 2023
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19) Package No. HP-04-395
C/O passing places missing CD side drain parapets CC pavement and Tarring work including five year maintenance under PMGSY Batch I 2018 19 Package No HP 04 373
Improvement, C/o Passing Places, Missing CD, Side Drain, Parapets, Crash Barrier, CC Pavement and Tarring work under PMGSY-II, Batch - I, 2019-20 Package No. HP-02-07
Improvement , C/O Passing places, Missing CD, side drain, parapets, CC pavement , Interlocking paver Block and Tarring work including five year maintenance under PMGSY-II Batch-I, 2019-20)
Improvement ,C/O Passing places, Missing CD, side drain, parapets, CC pavement , interlocking paver Block and Tarring work including five year maintenance under PMGSY-II , ( Batch-I, 2019-20)
C/O Passing places, R/wall, Missing CD works, side drain , parapets, CC pavement, B.M. and Tarring work including five year maintenance under PMGSY-II ,( Batch-I, 2019-20)
Improvement ,C/O Passing places, Missing CD, side drain, parapets, CC pavement , interlocking paver Block and Tarring work including five year maintenance under PMGSY-II ,( Batch-I, 2019-20
Formation Cutting, Passing Places, R/Walls, Missing CD work, Side Drain, Parapets, CC Pavement and Tarring including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII)
P-L CC Pavement from RD. 28/200 to 28/070 and Const. of Wing wall at RD. 27/981 to 27/985 and 28/00 to 28/003
C/O B/wall at Rd 0/110 to 0/125 and P/L Stone soling, CC Pavement work at RD 0/00 to 0/230) MMSY (Balance work)
Improvement, C/o Passing places, CD works, GSB, WBM-II, Side drain, Parapets, CC Pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No.HP-08-539.
Formation Cutting, C/o Passing Places, R/wall, B/wall, CD, Side Drain, Parapets, Cell filled CC Pavement and Metalling and Tarring work etcetera including five-year routine Maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, CD, Side Drain, Parapets, Cell filled CC Pavement and Metalling and Tarring work etcetra including five year routine maintenance)