Loading…
Loading…
1,471 results • Best match
Improvement, passing places, missing cross drainage, side drain, parapets,crash barrier,CC pavement , Tarring and road signs etcetera including five year routine maintenance) under PMGSY-III (Batch-I, 2023-24 Package No. HP-09-716
F/C, passing places, C/O R/walls, X-drainage work, MT, CC pavement, road side drain and parapets in Km. 0/0 to 3/930 including 5 year routine maintenance after completion of work
Providing and Laying CC pavement at Km 0/0 to 0/600 and providing and laying GSB G-II G-III and metalling Tarring at km 0/600 to 0/900 (under D-10-3054
SH Removal of formation deficiency CD works Retaining wall CC Pavement GSB WMM MT works PCC drain and Parapets and minor bridge Const of 20 meter RCC Girder Bridge at RD 2920 Under Nabard RIDF XXIX
C/o CC Pavement work at rd 0/020 to 0/460, Wire crate B/wall at rd 3/355 to 3/380 and R/wall wire crate work at rd 3/355 to 3/395)
Formation cutting, C/o Retaining wall, wire crate, CD work, CC Pavement, P/L GSB, WMM, P/L Premix carpet surfacing, Road side Drain, Parapets, P/F Kilometer stone in Km 6/920 to 8/920
Formation cutting, C/o Retaining wall, wire crate, CD work, CC Pavement, P/L GSB, WMM, P/L Premix carpet surfacing, Road side Drain, Parapets, P/F Kilometer stone in Km 5/285 to 6/920
F/C at Rd 0/00 to 0/060, C/O R/wall at RD 0/049 to 0/060 and P/L CC Pavement at RD 0/00 to 0/014.40) Deposit BSP/2023/41
C/O R/wall at RD 0/450 to 0/545, P/L CC Pavement at RD 0/00 to 0/600 on link road to PHC Bhira 0/00 to 3/00) (under PDNA Head)
Formation cutting, C/o Retaining wall, wire crate, CD work, CC Pavement, P/L GSB, WMM, P/L Premix carpet surfacing, Road side Drain, Parapets, P/F Kilometer stone in Km 0/000 to 5/285
Improvement, C/o Passing places, CD works, GSB, WBM-II, Wet Mix, side drain, parapets, CC pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-522 and HP-08-524.
(SW- Formation cutting, Passing Places, R/Walls, C.D.Work, GSB, Wet Mix macadam, Tarring work, CC Pavement, Side drain, Sign board and parapets including 2 No. Bridges) including maintenance of five years after completion of construction work).
Formation cutting, C/o Retaining wall, wire crate, CD work, CC Pavement, P/L GSB, WMM, P/L Premix carpet surfacing, Road side Drain, Parapets, P/F Kilometer stone in Km 8/920 to 9/920
Formation Cutting, Improvement of Road, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII
Restoration of rain damages at Khajanchi Mohalla near Chhanga Ram, Ashok, Sumit and Bagga house in Ward No. 5 Sub head - P/L M.S. grating, CC pavement, C/O R/wall and tor steel for culvert
P/L GSB, G-II and 20 mm thich premix carpet with seal coat at RD 0/150 to 0/450, CC pavement at RD 0/00 to 0/045, 0/450 to 0/505) (SCSP)
C/O B/wall at Rd 9/405 to 9/425, 9/600 to 9/645, 9/750 to 9/770, 10/600 to 10/645, 11/705 to 11/735, 11/810 to 11/835 R/wall at Rd 9/735 to 9/780, 11/705 to 11/720 P/L cement concrete pavement in Km 2/110 to 2/170, 2/210 to 2/230 U-Shape drain at
C/O R/wall at Rd 0/015 to 0/030 0/100 to 0/120, 0/045 to 0/060 0/080 to 0/090, P/L 900mm dia RCC Hume pipe culvert at Rd 0/130, cement concrete pavement at Rd 0/00 to 0/150 , C/O V-shape drain at Rd 0/040 to 0/100 U-shape drain at Rd 0/100 to
P/L cement concrete pavement at Rd 0/00 to 0/040, 0/125 to 0/215, 0/420 to 0/543, 0/730 to 0/850, P/L 900mm dia RCC Hume pipe culvert at Rd 0/930, 1/145 P/L GSB, WMM M/T in Km 0/040 to 0/125, 0/215 to 0/420, 0/543 to 0/730 0/850 to 1/600 (DC De
C/O R/wall at Rd 0/224 to 0/270 , 0/310 to 0/330, 0/360 to 0/390, B/wall at Rd 0/360 to 0/390, P/L 900mm dia RCC Hume pipe culvert at Rd 1/405, Cement concrete pavement at Rd 2/150 to 2/194, Wire crate R/wall at Rd 5/230 to 5/247.50, 5/270 to 5/290
C/O Cement concrete pavement in settled portion 0/690 to 0/810, 0/900 to 0/990 along with 0/945 to 0/975, B/wall at RD 1/850 to 1/895 and R/wall 1/920 to 1/935, 5/00 to 5/015, 4/735 to 4/765 and 4/825 to 4/840 and P/F Crash Barrier at RD 0/780 to
P/L cement concrete pavement at Rd 5/790 to 5/910 6/600 to 6/810, C/O V-Shape drain at Rd 4/900 to 5/080, 1/210 to 1/650, 3/340 to 3/625 6/750 to 7/00, C/O B/wall at Rd 1/510 to 1/535 2/940 to 2/960 P/L 900mm dia RCC Hume pipe culvert at Rd 5
Improvement of Road, Passing Places, R/Walls, Missing CD work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII).
Improvement of Road, Passing Places, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII).
SH Removal of formation deficiency C/O R wall gabions wall M T works CC pavement PCC U V shape drain Cross drainage work road furniture from km 0 000 to 12 195 including 5 years maintenance
Improvement of Road, Passing Places, R/Walls, Missing C.D. Work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII
Formation cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain and parapets including 19.75 mtr span bridge over Nera Khad including five years maintenance after completion of work
Improvement,Passing places, R/walls,C.D. work, GSB, WBM-II, WBM-III, Tarring work, Side Drain, Metal crash Barrier, CC Pavement, Interlocking paver Block and parapets including routine maintenance for five years after completion of construction work
Formation cutting, Construction of passing places, Missing CD, side drain, Parapets, Crash barrier, CC pavement and tarring work including five year maintenance after completion Under PMGSY-II (Batch-I for, 2019-2020)Package No HP-02-06
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM,Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-705
Formation Cutting, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABA
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM,CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-701
(SH- ROFD, Protection works, Cross Drainage works, GSB, WBM, Cold Mix, CMBM, CC Pavement, V-Shape Drain, Crash Barrier, Parapets, dumping site and Road furniture i/c Five year maintenance) under PMGSY Package No. HP-09-702
Improvement, passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and road signs etc. including five year routine maintenance of Package No. HP08561, HP08562, HP08563 and HP08564
SH- C/o road, drains and RCC culverts (Balance work thereof).
SH- C/o road, drains and RCC culverts (Balance work thereof).
Providing and Laying CC Pavement at Km 65/124 to 65/180, 65/415 to 65/472, 67/645 to 67/673, 69/180 to 69/205, 69/680 to 69/719 and 69/840 to 69/870.
C/o Passing Places R/walls Missing C.D. works Side Drain CC Pavement B.M. Tarring work road safety easure place of identification sign board Protection work and Maintenance for 5 year after completion Package No. HP-04-403
SH- Formation Cutting, C/O Passing places, R/wall, Missing C.D. work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapetsand road side furniture including routine maintenance for five years after completion of construction work.
Imp. of road, Formation Cutting, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD
ROFD wire crates/Gabion walls C/o R/wall P/L Granular Sub Base (GSB) CC pavement parapets crash barriers system V-shape and U-shape drain cross drainage structures including five year routine maintenance after completion work
Improvement, Passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and Road signs etc. including five year routine maint. of Package No. HP08566 HP08567 HP08568 HP-08569 HP089999.
Tender for C/O Cement concrete road damaged due to land slide in Monsoon 2025 at 33/11 KV, 2x1.6 MVA Sub-station Kothian under ESD, HPSEBL, Baroh under Electrical Division HPSEBL, Nagrota Bagwan. Ch. To- R/M of Boards building under ESD Baroh
C/O R/wall at RD 1/150 to 1/165, CC Pavement at various RDs, P/L interlocking paver block at RD 0/050 TO 0/150, 4/700 TO 4/800 , V-shape drain at various RDs
Improvement of road, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, CC pavement, Side Drain , Parapets, crash barrier and road furniture i/c routine maintenance for five years after completion of construction work
C/O R/wall at RD 07/220 to 07/230, 09/310 to 09/325, (near jagdish chand house), P/L Embankment, P/L G.SB, CC pavement and U-shape drain in km 10/300 to 10/800
SW- P/L G-II, G-III, C/o CC Pavement at RD 1/550 to 1/750, P/F Crash Barrier at RD 1/100 to 1/160, P/L B.C from RD 0/880 to 0/990)
Widening or road to intermediate lane standard, R/walls, B/walls, C.D. work, GSB, WBM, Tarring work, CC Pavement, Interlocking Concrete block, Side Drain, Parapets, Crash Barrier and Sign Boards including C/o 30.00 meter span Double lane Bridge
ROFD, Protection of works, C.D. work GSD, WBM, CMBM, bituminous cold mix, CC pavement, V-shape drain, Parapets, Crash barrier, Road Safety, Km stone, Irrigation crossing and dumping site RD 0/0 to 9/330 (including 5 years maintenance)
P/L Grading-l,G-ll, M/T and C/O PCC Road side drain in Km. 0/00 to 1/800)