C/O PCC Road Side V- shape drain in Km. 79/500 to 81/00, 82/500 to 86/300) 5.300 km
Formation cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets, road furniture and 33.40 meter span Prestressed concrete Box Girder Bridge at RD 0/0675 including both sides Approaches and
Formation Cutting, Metalling and tarring, C/O Hume pie culvert, R/wall, P/L GSB, WMM, SDBC, CC pavement, Parapets for essential reaches, Road side drain, CD works and five year routine maintenance in KM 0/0 to 04/650
Construction of 125.00 mtrs. Span Bridge (3x40 mtr. PSC Box Girder), Removal of formation Deficiencies, passing places, C/o protection work, Cross Drainage, providing an laying GSB, P/L WBM-II, WBM-III, Premix carpet, CC pavement, side drain, Parapet
Imp of road, Passing Places, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD RIDF-X
SH C/o road from jeep able to 5/7mtrs wide road in Km0/00 to 0/250 soling and pavement tarring in Km0/00 to 0/250 SW C/o paver block and CC pavement in Km0/00 to 0250
Providing and Laying GSB from 1/175 to 1/425, G-II from 1/225 to 1/425 and CC Pavement 1/425 to 1/475 and Tarring from RD 1/475 to 1/660 and 1/310 to 1/425
SH ROFD, Protection of works, CD works GSB, WBM, CMBM, bituminous cold mix CC pavement, V-shape drain , parapets, crash barrier, road safety, kilometer stone, irrigation, crossing and dumping site at Km.0/0 to 9/500) (including five year maintenance)
SH- C/O Formation Cutting, C/O Passing places, R/wall, Cross drainage work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapets and road side furniture including R/M for five years after completion of construction work
Improvement, passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and road signs etc. including five year routine maintenance of Package No.HP-08-552 HP-08-555 HP-08-554 HP08553.
C/O V-shape drain with edge wall at RD 12/200 to 12/270,12/400 to 12/480, 12/930 to 13/00 and 13/250 to 13/800, CC pavement at RD 12/500 to 12/650) PDNA
Construction of Retaining wall and Breast wall between km 51/630 to 51/670,U-Shape Drain between km 51/000 to 51/900 ,Crash Barrier between km 51/200 to 51/900 and Interlocking CC pavement etc. under PDNA).
P/L WBM Grading-ll,G-lll,30mm thick bituminous concrete alogwith PCC Road side drain in Km. 3/00 to 4/00)
C/o R/wall at Rd 19/00 to 19/004 and 20/950 to 21/00 PCC road side drain at various reaches)
F.C, Passing Places, R/walls, B/wall, CD works, GSB, WBM G-II, WBM G-III, Tarring work, CC. pavement, Road side drain, Parapets, Road Furniture i/c five years routine maintenance in Km 0/0 to 7/160. (Under NABARD RIDF-XXVIII
C/O 3.00 mtr span RCC slab type Culvert with wing wall at RD 0/950, R/wall at RD 0/970 to 0/990 P/L CC Pavement at RD 0/900 to 0/950 0/955 to 1/050). (under MMGSY)
P/L Soling, CC pavement work at RD 0/150 to 0/270, E/wall at RD 0/175 to 0/199, U-shape drain at RD 0/150 to 0/175 and Khul crossing at RD 0/195, 0/205) under MMGSY
Const of 900 mm dia hume pipe culvert at Rd 3/225 alongwith wing wall at rd 1/795 to 1/800 CC pavement , PCC drain P/L G-III and bitumen macadam bituminous concrete in Km 0/0 to 3/720
P/L WBM Grading-l,Grading-ll, M/T and C/O PCC Road Side drain in Km. 0/00 to 1/00)Under SCSP
P/L WBM Grading-l, Grading-ll, M/T and C/O PCC Road Side drain in Km. 1/00 to 2/00)Under SCSP
P/L WBM Grading-l, Grading-ll,M/T and C/O PCC Road Side drain in Km. 0/00 to 1/00)Under SCSP
C/O soild casueway at RD 1/400 ro 1/410 Length 10mtr, M/T in kms 0/450 to 0/510, 0/538 to 0/978 and CC pavement in kms 0/523 to 0/578 and RD 1/130 to 1/390
SH ROFD, Protection work, CD works, GSB, WBM, CMBM, bituminous cold mix CC pavement, V-shape drain and Katcha drain, parapets, crash barrier, road safety, kilometer stone, irrigation crossing and dumping site at RD,0/0 to 6/195 (i/c five year maint.
C/O PCC Road Side Drain V-Shape drain in Km. 41/0 to 44/0 and U-Shape drain in Km. 48/900 to 49/400)
Formation cutting C/o wire crates gabion walls Rwalls P/L MT CC pavement C/o road side parapets Providing W metal beam crash barriers C/o v shape drain and u shape drain X drainage work including 5 year routine maintenance after completion of work
C/o V-sghape Drain at RD 0/520 to 0/640, Hume Pipe Culvert at RD 0/585, 0/720 and R/wall at RD 0/695 to 0/720 and Providing and laying Soling and CC Pavement work in Km 0/520 to 0/720).
Construction of Link Road from NH-503 to Ghartheru via Baba Tilla up to Bagli km 00 to 5.500portion km 1.300 to 3.500SUB HEAD Formation Cutting C.o Retaining Wall 900 mm Dia Hume pipe culvert CC pavement PCC Drain P.L GSB and Metalling and Tarring fr
Const. of Retaining wall at RD. 1/555 to 1/575 , 1/800 to 1/810 and CC Pavement at RD. 0/100 to 0/700 , 1/510 to 1/610 and C/o PCC Drain 0/100 to 0/700 , 1/600 to 1/810
F/C, Passing Places, R/walls, CD works, GSB, WBM G-II, WBM G-III, Tarring work, Interlocking Paver Block, CC pavement, Road side drain and Parapets, P/F Road Furniture i/c 5years routine maintenance in km 0/0 to 6/310 under NABARD RIDF-XXVIII
ROFD C/o retaining walls breast walls Crate walls C/O missing CD work P/L GSB MT CC pavement road side drain road side parapets W Metal Beam crash barriers PMGSY information board sign boards kilometer stones 200mtr RD stones etc i/c five year maint
Balance work of Cleaning and grubbing, ROFD, C/O R/wall, B/wall, Wire crate, P/L GSB, WBM-II, WBM-III, Metaling and tarring, CC pavement, Parapets for essential reaches, Road side drain, Sign board, KM 0/0 to 03/545) Stage-II (package NO. HP08-341
C/O 6 mtr. span RCC slab culvert at RD 1/330 with approaches, C/O 900mm dia Hume pipe culvert at RD 0/075,solid causeway at RD0/730 to 0/740 and CC pavement in kms 1/570 to 1/630 and 2/175 to 2/250.
P/L GSB,G-II,G-III,Metalling and Tarring at RD 0/650 to 1/160,HP Culvert at RD 0/720 and CC Pavement at RD 0/072 to 0/196 and 0/300 to 0/450,Edge wall at RD 0/300 to 0/450
R/R damages on Sanwar Gate to Mandodhar via Shillar Pathia raod in Km 0/00 to 3/500 SH- Loosining and levelling, P/l GSB and CC pavement at RD 0/870 to 0/970, 1/182 to 1/255 and 1/580 to 1/636.50) under PDNA
SH C/o road from jeepable to 5/7mtr wide road in Km0/0 to 0/250 CD in Km0/00 to 0/250 soling and pavement tarring in Km0/00 to 0/250 SW C/o paver block and CC pavement in Km0/0 to 0/250
C/o link road Chahari, Jahari, Kasaru , Babeli road GP. Seo km. 0/00 to 4/00 (SH C/o RCC H/pipe culvert 900 mm dia at R.D 2/010 and 2/180 and providing and laying CC pavement at R.D 2/00 to 2/200) (UNDER SCCP)
Construction of Retaining wall 56/870 to 56/900 , Breast wall between km 56/860 to 56/900,U-Shape Drain between km 56/400 to 56/900 and Crash Barrier between km 56/400 to 56/900 and Interlocking CC pavement at various Rds etc. under PDNA
C/O R/wall at RD 2/530 to 2/550, P/L CC Pavement at RD 1/970 to 1/990 2/715 to 2/740 P/L bituminous concrete 30mm thick in between km 0/00 to 3/00 on Dhar Dheli Jassai road) (under PDNA Head)
ROFD C/o R/Wall B/Wall Crate walls C/o missing CD work P/L GSB M/T CC pavement road side drain road side parapets W-Metal Beam crash barriers PMGSY information board sign boards kilometer stones 200mtr. RD stones etc. i/c five year routine maint.
F/C R/Wall B/Wall, C/D work GSB WBM-II WBM G-III Tarring work Road Side Drains Parapets CC Pavement and C/O 102.50 Mtr span prestressed concrete Box Girder bridge over Dehar khad at RD 0/240 i/c 5 Years Routine Maint. NABARD RIDF-XXIX
RODF 5/7 mtrs. Wide road km. 0/0 to 0/080, R/wall at various rds. 900mm dia RCC hume pipe culvert at Rd. 0/075 U-Shape drain at Rd. 0/0 to 0/030, P/L CC Pavement at Rd. 0/0 to 0/080) Under DC Deposit)
Providing and laying Kharanja stone soiling, CC Pavement 1 1 5 3 Breast Wall at Rd 0/000 to 0/025, 0/105 to 0/155 , 0/260 to 0/280 and Retaining Wall at RD 0/180 to 0/195,0/210 to 0/218 and 220 to 0/226
C/o 900mm dia hume pipe culvert at R.D. 0/003 and 0/145, PCC R/wall at R.D. 0/068 to 0/123.50, P/L CC pavement at R.D.0/068 to 0/272, construction of 1.00mtr. span slab culvert at R.D.0/182) Under Chief Minister Announcement work
C/o 5/7mtr. Formation cutting at RD 2/475 to 2/527 and 2/615 to 2/945, CC pavement at RD 2/527 to 2/537 and R/wall at RD 2/315 to 2/325, 2/610 to 2/615 and 2/740 to 2/755) Under OTMNP
C/O R/wall at RD 0/640 to 0/665, CC Pavement at RD 0/570 to 0/680, P/L 20mm thick premis carpet in km 0/680 to 0/930 V-shape drain at RD 0/680 to 0/900 0/950 to 0/990). (under MMGSY)
C/O R/wall at RD 1/310 to 1/320, B/wall at RD 1/310 to 1/330, P/L 900mm dia RCC Hume pipe Culvert at RD 1/780, P/L CC Pavement, V-shape drain at various RDs. on link road to village Jassai ) (under PDNA Head)
Toe wall and flooring of existing hume pipe culvert at RD 0/840, 2/600 and existing 5.00 mtr span culvert at RD 2/300 and P/L WBM-III, 2cm thick premix carpet, seal coat and CC Pavement and Balance work of side drain between RD 0/0 to 3/600
CC Pavement at RD 2/170 to 2/200 , P/L GSB, WMM in km 2/000 to 2/170 , 2/200 to 2/400 , P/L M/T in km 2/000 to 2/170 , 2/200 to 3/000 on linkl road Mansai to village Baranjar via Pandhera). (under PDNA Head)
Providing and laying paver block at RD 3/00 to 3/390 in Barin Mandir Siswan Gahlot road Construction of V-shape drain at RD 0/590 to 0/890 and Construction of R/wall at RD 0/015 to 0/085 and CC pavement at RD 0/675 to 0/790) Under PDNA
C/O R/wall at RD 0/945 to 0/960, B/wall at RD 0/975 to 1/00 , 1/180 to 1/190, V-shape Drain in km 0/750 to 1/150 , P/L CC Pavement at RD 0/750 to 1/150 , 1/175 to 0/300).(under OTMNP Head)