Loading…
Loading…
2,951 results • Best match
CO 900mm dia hume pipe culvert at RD 0190 with wing wall 300mtr Both side Under SCSP
C/o Hume pipe culvert at Rd 0/180, 0/285, 0/345 i/c wing wall).
Construction of 900mm dia hume pipe culvert along with both side wing walls at R.D. 2/202
C/o RCC Hume Pipe culvert at RDs 1/780 to 2/200 and 2/285) DMFT
Removal of Formation deficiency and Construction of Hume Pipe Culvert at Rd. 0/0 to 0/700
Construction of Formation cutting and Hume pipe culvert 900mm dia in km. 0/00 to 0/800
Formation cutting and C/o 900mm dia Hume pipe culvert between km. 0/00 to 3/300)
C/o wire crate R/wall, P/L 900mm dia R.C.C hume pipe culvert etc/ (under MMGSY)
C/O 900 mm dia hume pipe culvert at RD 1/994, 2/089 and 2/429
Restoration of rain damages on Bathri Sundla Langera J and K Boundary road K.M. 28/0 to 93/400 (SH Construction of 6.37 metre span culvert over Sarog Nallah at R.D. 61/258 and Construction of PCC Retaining wall along both sides of slab culvert)
C/O Dungaghat Kila Klanch road Km 0/0 to 22/0 (SH- C/O 15.00 mtr span cause way at RD 18/300and 6.00 mtr span RCC slab culvert at RD 17/510).
Restoration of rain damages on Jawalamukhi Dehra Jawali Raja Ka Talab road in Km 22.0 to 39.180 SH Extension of 3.00mtr Span RCC Slab Culvert alongwith wing wall at RD 23/825 Under PDNA
Construction of Link road Simli to Fatehpur Km. 0/0 to 6/580 Formation Cutting, Breast walls , Cross Drainage including 1 No. 6.00 Mtr. Span slab culvert in Km. 0/0 to 2/500
R/R damages on link road from Nursary to Shitti Nallah Km. 0/00 to 4/00. (SH- C/o both side protection wall for slab culvert abutment at Rd. 1/600 (Dutti Nallah
Strengthening of road from Manpura- dhela road to Macload pharma along with Retaining wall along the damaged road near pump house GP Manpura and protection work of slab culvert on the road, G.P. Manpura.
Restoration of rain damages to Paonta Puruwala Singhpura Bhagani Gojjar Dakpathar road (MDR-94) Km. 0/0 to 26/500. (SH- Repair to existing 2.00 mtrs. span RCC Slab Culvert at RD. 10/390).
Restoration of rain damages on Govt. Senior Secondary School Kherian to Chatra via Harizan Basti Kanguhi in Km 0.0 to 1.500 SH Construction of 3.00 mtr. RCC Slab Culvert at RD 0.020 Under NDRF
Dharamshala Yol Dadh Holta Palampur Holta Chadiyar Sandhole road Km 33/00 to 40/500 (SW- Repair of 6.00 mtrs Slab culvert at RD 39/110 and 38/300 (Flooring, Protection wall, Railing etc)
RRD on Kun Galoo to Baroha Ropa Matyal road Km. 0/00 to 2/800. (SH- C/O R/wall with toe wall at Rd 2/151 to 2/166,2/480 to 2/487 and C/O catch pit and toe wall to RCC hume pipe culvert at Rd 1/550 AND 1/720) under PDNA-2023
Construction of Mangan to Antu road Km 0/0 to 3/0 (SH Improvement of curve at RD 0/195 to 0/235, ROFD between km. 0/600 to 1/00 and C/O 900mm dia RCC Hume pipe culvert alongwith both side wing walls at RD 0/920, 1/180, 1/350 and 1/650) under MNP
C/o Link road to Harizan Basti Dhadi village Fatoh km 0/00 to 0/230 SH Formation Cutting in km 0/00 to 0/130,Hume Pipe Culvert at RD 0/010 and Retaining Wall at RD 0/010 to 0/080 and metalling and Tarring at RD 0/00 to 0/130 under DMFT
Imp of black spot on Narkanda Thanedhar Kotgarh Bithal road Km. 0/000 to 44/000 SH Imp of narrow curves at RD 27/080 to 27/100 C/O PCC wire crate R/ wall at Rd 27/125 to 27/137 27/139 to 27/146.20 and C/O 900mm dia Hume pipe culvert at rd. 27/138
Restoration and Rain Damaged on Kelodhar Patikari road Km 0 000 to 11 000 SH Construction of 900mm dia RCC hume pipe culvert with wing wall at RD 1 310 and 1 686 PCC Retaining wall at Rds 0 930 to 0 950 4 760 to 4 770 8 640 to 8 670 and 8 870 to 8 9
Construction of Link road from Bhanra Kadoli to Thontha Shilli Bhagadi Chokar km 0/00 to 9/00 (SH ROFD from km. 1/065 to 1/195 ,2/120 TO 2/815 and 2/940 to 3/020 and C/O 900 MM Dia RCC Hume pipe culvert at RD. 2/864 and 3/420) Under SCSP
C/O link road to village Bhawai Baleech km. 0/00 to 2/870 (SH ROFD in km. 0/060 to 0/494, Hume Pipe Culvert at RD. 0/210, R/Wall in wire crate from km. 0/200 to 0/240 and R/Wall in wire crate at RD. 0/300 to 0/320) Under MNP
C/O link road from Harijan Basti Shanad to Sheel Km.0/000 to 3/000 SH C/O P.C.C R/wall and Wire crate R/wall at various Rds C/O RCC Hume pipe culvert at RD.0/230, 0/820 0/920 and 1/105 i/c both side wing wall and P/L Kharanja stone soling.
Construction M/T on Shargaon Ranaghat road Km 0/0 to 10/00 ( SH Providing and laying WBM G-II in km 1/500 to 4/0 , C/O unlined drain, ROFD in Km. 5/610 to 5/955 and C/O 900 mm dia RCC Hume pipe culvert alongwith both side wing walls at RD 7/105
Construction of link road from Ghareothi to Tipper Km 0/000 to 0/870 SH C/O 900mm dia Hume Pipe culvert at Rd 0/175 0/300 0/480 0/555 i/c both side wing wall and Providing/laying Kharanja stone in km 0/000 to 0/300 and 0/480 to 0/840
Construction of Mattal Bakhog Nag Timba road km 0/00 to 3/00 (SH Construction of PCC B/Wall at Rd 2/240 to 2/255,2/455 to 2/470 and 2/950 to 2/965 and Construction of 900 mm dia RCC Hume pipe culvert along with both side wing walls at Rd 0/180) Unde
RRD On Link road from Rada Nallah to Dhandal 0/00 to 2/900(SH- C/O catch pit and wing wall to RCC hume pipe culvert at Rds 2/800 to 2/805 and R/wall at Rd 2/805 to 8/820, 2/830 to 2/866 and 2/875 to 2/885 under PDNA 2023).
C/O CD and M/T on link road Jamu to Jamdagi Temple km. 0/00 to to 2/500 (SH P/L WBM G-I, G-II, and M/T alongwith road isde drain in km. 0/00 to 1/00 and 900 mm dai Hume Pipe Culvert from RD. 0/240 and 0/980)
C/O Link road to village Gajwa km. 0/00 to 2/550 (SH Improvement of formation deficiencies from km. 1/310 to 1/405 and C/O RCC Hume Pipe Culvert at RD. 1/740,1/780 , 2/010 and 2/100 and C/O R/Wall from km. 0/380 to 0/397) Under MNP
Balance work for construction of link road from Sarkalti Hawan Oddi SH P/L Kharanja soling Km 0/000 to 3/435 and C/O Hume pipe culvert at Rd 0/735 1/375,1/73, 1/810 1/885 1/960 2/2102/555 2/960 3/105 3/480 3/660 3/780 ans 3/870
C/o of road from Kadharghat to Palag Serikadi Km 0/0 to 7/03(SH Formation cutting 5/7 metre wide in KM 0/0 to 7/030,c/o of CD works for 900 mm dia RCC hume pipe culvert,unlined surface drain,wire crate walls for dumping structure in Km 0/0 to 7/03
C/O Habban Dhamoon road via Bagna km 0/0 to 4/00 (SH ROFD in km 1/840 to /090 , 2/135 to 2/180 and 2/225 to 2/390 C/O 900 mm dia RCC Hume Pipe culvert along with wing walls both side wing walls at Rd 1/830 , 2/435 ) SCSP
C/o link road from main road Balghar to village Kalehar Km. 0/0 to 0/750 (SH Formation cutting C/o R/wall at RD 0/220 to 0/265 900mm dia hume pipe culvert at RD 0/270 and P/L CC interlocking paver blocks at RD 0/0 to 0/310) under MMGSY
Restoration of rain damages on Bara-Da-Ghat Saloun Bum road km 0/00 to 5/500 Sh C/o wire crate at Rd 0/405 to 0/455, C/o D/S Toe wall and both side wing wall of 900 mm dia Hume pipe culvert at Rd 2/100 and P/L cement concrete interlocking paver blo
Balance work for construction of link road from Sarkalti Hawan Oddi Km 0/000 to 3/975 SH Providing and laying Kharanja soling Km 0/000 to 3/435 and C/O Hume pipe culvert at RD 0/735 1/375 1/735 1/810 1/885 1/960 2/210 2/555 2/960 3/105 3/48
C/o of Exist road from HRTC Bus Stand Ghumarwin approach road from Bus stand to Seer Khad Bridge on NH-103 km 0/00 to 0/300 SH C/o 600 mm dia Hume pipe culvert at Rd 0/210, C/o U-shape Drain,Steel work for Railing work, Providing and laying paver blo
Construction of link road from Chammb Bhujan road to Palangri village Kangoo Ka Johar Km. 0/0 to 1/425 (SH- Formation cutting in Km. 0/945 to 1/325, C/o R/wall at RD 10/030 to 10/045 and C/o 900mm dia hume pipe culvert at RD 0/900 and 1/098)
Balance work for construction of link road from Sarkalti Hawan Oddi SH P/L Kharanja soling Km 0/000 to 3/435 and C/O Hume pipe culvert at Rd 0/735 1/375,1/73, 1/810 1/885 1/960 2/2102/555 2/960 3/105 3/480 3/660 3/780 ans 3/870
Construction of road from main road to harizan basti Shaya Chhabron km 0/0 to 1/725 (SH Providing and laying WBM G-I, G-II, G-III and Taring in km 0/0 to 0/550 , C/O unlined drain and C/O 900 mm dia RCC Hume pipe culvert alongwith both side wing wal
Formation cutting, Providing and laying GSB from RD 0/770 to 1/120, Hume Pipe culvert at RD 0/230, 0/290, 0/395 and Causeway from RD 0/340 to 0/355) (Under MMGSY)
Construction of 900 mm dia RCC Hume Pipe Culvert with Wire Crate Wing Wall at RD 28/110
C/o 900mm dia Hume pipe culvert at RD 1/000 a/w wing wall) Under Head O.F.C.
S.H C O 900mm dia Hume pipe culvert at rd. 0.200 and Rwall at RD. 0.100 to 0.120
C/o 900 mm dia Hume pipe culvert at Rd.0/110 and 0/380 alongwith wing wall
Construction of 900mm dia R.C.C. Hume Pipe culvert alongwith wing walls at R.D. 0/465 and 0/840
C/o 900mm dia Hume pipe culvert at Rd. 1/690, 2/450, 2/900 AND 3/180)
SH C o 900mmdia Hume Pipe Culvert at RD 5.390,and R Wall at RD.5.550 to 5.575)