Loading…
Loading…
1,501 results • Best match
Construction of box culvert at Km 1.30 & 1.90 of Soragav to Metagudda via Jaliber, SH-55 approach road in Mudhol taluka of Bagalkote district under 5054-80-190-0-01-132 KRDCL capital expenditure for the year 2025-26
Construction of Boox Culvert on Road from Ankali-Hanumasagar Connecting Hosuru (SH-26) SH-256 at Km 81.23 & 82.68, Constructioin of Crash Barrier and Repairs to Bridge at Km 91.75, and Repairs to Box Culvert Km 105.30, 105.90 in the year 2025-26 in Hirekerur taluka of Haveri District (RESERVED FOR SC CATEGORY)
Package-I Construction of Pipe Culvert in Km No. 4 and Km No. 7 of Kudachi Dy, Construction of Box culvert along combined structure in Ch 9.800 of Chinchali main canal connecting to offtake of Suttatti Dy & Construction of Bridge at Ch 12.200 (Near Karlatti Farm) of Chikkud branch canal and other works.
Improvements to Road on NH-752K Siddapurwadi Cross to Lakhangaon via Telgaon, Talwad(M) & Atnoor MDR road from KM 9.30 to KM 11.80 and Construction of Box Culvert and Approach roads at km 11.80 & 16.84 in Bhalki Tq Bidar Dist. BDR25210331.
Preparation of Detailed Project Report for Improvement of Ravihal-Itigihal MDR road From KM. 1.55 to KM 3.87 and Construction of box culvert on Ravihal-Itigihal MDR road at km 2.30 and 3.50 Under CMIDP grant for the year 2025-26.
Improvements To Road From Ankalimatha To Medikinal Via Nagalapur Km 21.30 To 26.00 (Selected Reaches) And Box Culvert (2 x 2 x 1) Km 24.30 Maski Constituency In Lingasugur Taluka Of Raichur District. Under CMIDP Fund For The Year 2025-26
Constrcution of Box culvert at Ch. 42.84 km at NH4A Desur to Sh-44 up to Gokaka Taluka Border via. Rajhans gad, Nandihalli-Nagerhal-KK Koppa-Bagewadi-Sampgaon-Kardiguddi-Marihal-Tumbarguddi in Belagavi Taluka for Year 2025-26 under 3054
Taking Trial Bores at proposed Reconstruction report on the soil Investigation for the proposed Reconstruction of box culvert at ch 2.1km in Bhadravati to Sasivehalli Joining Road via holehonnur, Sliddipura, S.K.Magge, Nagasamudra, Mongote, Anaveri, Nimbegondi, saydharakalli road in bhadravathi talu
Improvement of Ravihal-Itigihal MDR road From KM. 1.55 to KM 3.87 and Construction of box culvert on Ravihal-Itigihal MDR road at km 2.30 and 3.50.in Siruguppa taluk, Ballari district under 4059-CMIDP grant for the year 2025-26.
Formation of 9mtr wide connecting road from Road No. 5 to Utility area 3 and construction of RCC Box Drain, RCC Box Culvert & Compound wall to Water supply area at Sarathi Kurubarahalli 2nd Stage Industrial Area, Harihara Taluk, Davanagere District.
Construction of box culvert in km no 2 near satti farm km no 7 ( Chinchali chowki) of chikkud branch canal , construction of pipe culvert in km no 1 of yabaratti Dy across Hrugeri yalaparatti road , Construction of Foot bridge in km no 3 of North ... pipe culvert near ...
Constructio of High level Causeway (Bridge) near Bommanahalli tank under Acchalu Gramapanchayath
CONSTRUCTION OF CULVERT
Construction of Retaining Wall at Upstream Side to Box Culvert at Ch 122.45 Km of SH-275 Kengal (on NH275) to Alur (on SH110L) via Yediyuru (NH 75) Mayasandra, Soravanahalli, (NH 150A) Bochihalli, Talakere, Aralikerepalya, Vishwanathapura (NH 150A) Turuvekere Road in Turuvekere Taluk.
Construction of Box Culvert at Km 1.18 Kitta Cross to (SH-163) Towards Basavakalyan Road & Km 1.70 on SH-34 to Betgera wadi at Km 0.60 On Kohinoor Pahad to MS Border to Ladwanti wadi in Basavakalyan Taluka of Bidar Dist. BDR255223200.
Construction of Causeways at Nandibande RF Halagapura Sy No.2 & 3 ( Chigarumatti) of 1 No in Hosapete Range During-2025-26 (Unit No.48)(KMERC-Nandibande RF Project) (Category-Others)
Maintenance of Bridge and Culvert at Ch 4.30 km of Hosoor - Hoskote - Koothi Road (2) Manitenance of Bridge and Culverts at Ch 2.90 km of Kalale - Shanalli - Kowkodi Road (3) Manitenance of Bridge and Culverts at 1.20 and 2.70 of Kalale - Echalabeedu Road in Sakleshpur Taluk.
developement of road at kerpala boothasthana link road and near roshan kurunji house in ward no 11, providing concrete road near shrimathi mohini nagaraj house road balence portion in 9th ward and construction of slab culvert at khb 3rd cross road in 10th ward sullia tp limits
Construction of Bridge cum barrage to Lakshmisagara tank kodi halla near Tavarekere village, Construction of causeway in Sy.No 236 of Hendore village, Construction of checkdam & causeway near Tarur village, construction of causeway to halla across ... of causeway to ...
CONSTRUCTION OF CHECKDAM CUM CAUSEWAY NEAR JODICHIKKENAHALLI VILLAGE IN CHITRADURGA TALUK, CHITRADURGA DISTRICT.
Construction of Causeways at Nandibande RF Halagapura Sy No.2 & 3( Vyasapura Road) of 1 No in Hosapete Range During-2025-26 (Unit No.49)(KMERC-Nandibande RF Project) (Category-Others)
Repair of CD at Km 31.00 and Construction of Box culvert at Km 53.63 on Badamoi Godachi Gokak Falls (BGGF) SH-134 in Ramdurg taluka of Belagavi District for the year 2025-26 Under the 3054-SH Bridge Maintenance.(Reserved for ST Category Only)
Preparation of Detailed Project Report for Construction of Box Culvert On MDR-31103, Road Connecting SH-131 Kotturu to Banavikallu(SH-131) road Via Kodihalli, Rampura, Sunkadakallu, Palayyanakote, Suladahalli road at Ch.9.70 and Km 9.99 (Near Sunkadakallu Village), in Kudligi Taluk, Vijayanagara District
Renewal to Road From NH-50 (Sugar Factory Cross) to Honnali-Udbal SH198(Hallikhed(B) Hilalpur Road ) and Improvement of road from NH-50 to Kabeeraadwadi-Namdapur Road from KM 2.43 to 3.00 and Box culvert at KM 1.10 in Humnabad Taluka Bidar District. (BDR243223257)
Improvement to Road Madarakhandi Timmapur cross SH 284 from Ch km 1.00 to 3.6 in selected reaches and Construction of Box culvert at Ch 20.35 in Rabkavi Banahatti taluk of Bagalkot District Under 4059-80-051-0-60-132 CMIDP for the year 2025-26
Construction of Box Culvert, KIADB Zonal Office Painting, Providing interlock footh path in front of KIADB Zonal Office, Desilting of drains, Construction of Septic Tank and Repair work on the damaged portion of Road No.1 at Baikampady Industrial Area, Mangaluru Taluk, Dakshina Kannada District.
Preparation of Detailed Project Report for the work of Improvements to road vattumurani-ts kudlur MDR from chainage km. 0.00 to 2.50 and Construction of box culvert at ch. Km. 0.45 in Siruguppa taluk, Ballari district, under CMIDP grant for the year 2025-26.
CONSTRUCTION OF BOX CULVERT AT KM 37.04 ON HULSUR-MAHAGAON ROAD (SH-11), AT KM 5.00 ON AMBEWADI-BEMALKHEDA ROAD SH-163, AT KM 127.50 & KM 130.60 ON AURAD-SADASHIVGAD ROAD SH-34 IN BASAVAKALYAN TALUKA OF BIDAR DIST UNDER KKRDB FOR 2025-26. BDR255223198.
Construction of Box Culvert at ch. 17.83 km and Approach road from km 15.38 to 19.00 (Proposed Ch. 17.35 to 19.00 ) for MDR Athani Shirahatti in Athani Taluka Belagavi District. Under HOA 5054-80-190-0-01-132 KRDCL for the year of 2026-27.
CONSTRUCTION OF CAUSEWAY AND IMPROVEMENT OF HALLA NEAR RENUKAPURA VILLAGE CHALLAKERE TALUK, CHITRADURGA DISTRICT.
Construction Of Box Culvert at SH-223 (SH-NE26) -Hurulihala (Kombehalli To Gadimakunte Road Via Meenakere, Hurulihala, Chikkajogihalli, Chikkajogihallithanda,M.B Ayyanahalli,Harakabavi,Nimbalagere, Ganagatte) CH km 8.90 and 9.60 IN Kudligi Taluk, Vijayanagar District.head of Account 5054 APPENDIX E S H BRIDGES (RESERVE FOR ST CATOGERY)
Restoration of under Tunnel/Box Culvert at 13.60 km, 14.675 and 17.580 kms and improvements to the SP/CTC at CH.16.250km, 16.620km, 17. 600km, 22.100km, 22.475km, 23.250km, 23.450km, Formation of Embankment, CC lining formation of SR/IP of Mundaragi Branch Canal of Singatalur Lift Irrigation Scheme.
Consultancy services for survey, investigation and preparation of design, drawings, estimates, Detailed project Report, package estimate & DTP for the works of improvement and development of Nala/Tank/Rajkaluve/Tank Filling workand Construction of ... checkdam/Bridge/ Box culvert and ...
Reconstruction of damaged DROPs at CH 0.290 and 0.310 of DY 23 of MLBC and Repairs to the damaged concrete lining of MLBC at CH 53.395 and Construction of single vent box culvert near Survey no 31 of Aribenchi village for MLBC seepage water Nala (Janakki halla)
Construction of Road and Box Culvert on MDR Hunsgera-Sonkera-Dubulgundi-Kabirabad wadi-NH-50 at KM 1.20 in Humnabad Taluka and Improvement to Road from Jalasangi Cross(on NH-50) to Chitguppa via. Malkapur, Madargaon, KM 3.86 to KM 8.40 in Humnabad Taluk Bidar Dist. (BDR25322344)
Improvements of Culverts and Construction of new Culverts in ward Jurisdiction ward no 47 (72) D.J.Halli for the year 2025-26
CONSTRUCTION OF CHECKDAM CUM CAUSEWAY ACROSS HALLA NEAR ARALIHALLI VILLAGE IN HOSADURGA TALUK, CHITRADURGA DISTRICT.
CONSTRUCTION CHECKDAM CUM CAUSEWAY ACROSS HALLA FLOWING NEAR JAMAPURA VILLAGE IN CHANNAGERE TALUK DAVANAGERE DISTRICT.
Construction of culverts in ward No.179 Madiwala
Improvements to Approach road to Box Culvert chainages at km 168.10 (Near Gosabalu village) and at km 171.00 (Near Hagalur village) of SH 61 to Deodurga-Amaravati- Bhogavathi-Hirekotnekal- Ayanur- Ballari road (SH 128 Road) in siruguppa taluk,Ballari Dist under 4059-CMIDP grant for the year 2025-26.
A) Construction of Retaining Wall to The Box Culverts (3 Vent) on SH-149 (Higway Connecting from Shahpur to Shivrampur) at Chainages Km 106.20 & 106.30 Near Khajakotnoor Village in Taluka and District Kalaburagi and (B) Construction of RCC head Walls and repairs to Various Cross Drainagess in Road Connecting Malagatti to Bolewad MDR at CH. Km 17.69 to 23.41 In Taluka And District Kalaburagi
Construction Of Checkdam cum Causeway near local Nala at Balehosur Village of Laxmeshwar Taluk,Gadag District.
Improvements to culverts at Ward No 60(76) Gayathrinagar
Improvements to culverts in Ward No 59(66) Subramanyanagar
Maintenance of Kadra Kodasalli road, culverts and drains works
Improvements to culverts at inward No 58(65) Kadumalleshwara
Construction Of Box Culvert at 122.450 Km of SH-275, kengal (on NH275) to Alur Via Kanva, Dasavara, Makali, Hittalapura, Huliyurudurga, K. Honnamachanahalli, Kilara, Hanchipura, Paduvagere, Hanumapura, (SH-75) Kodatthi, Yadiyuru (N.H.-75) Mayasandra, Soravanahalli, (NH-150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathapura (NH-150A) Turuvekere, Nonavinakere, Road in Turuvekere Taluk.
Name of work IMPROVEMENTS TO ROAD FROM SANKANOOR ROAD TO BALI NAYAK TANDA, CONSTRUCTION OF BRIDGE TO ROAD FROM HABANAIK THANDA TO BELEGERA AND CONSTRUCTION OF BOX CULVERT & PROTECTION WALL TO ROAD FROM DANDAGUNDA TO SHIVANAGAR THANDA IN CHITTAPUR CONSTITUENCY KALABURAGI DISTRICT UNDER SCP/TSP 2025-26 KS-15-56
Construction of Low level Causeway at Turvihal Nala D/S of Main Canal Mile 53 of TLBC
CONSTRUCTION OF CHECKDAM CUM CAUSEWAY ACROSS KERE KODIHALLA NEAR JN KOTE VILLAGE IN CHITRADURGA TALUK, CHITRADURGA DISTRICT.