Loading…
Loading…
7,053 results • Best match
Construction work of drain with cover from the eastern mouth of PWD culvert built on Nagara main road in village Farsatar passing through Vishnu house till the drain built south of Singhal Dev house
Construction work of culvert of Kanchanpur Puraina road in Gorakhpur district, two cell box of 3x3 m in Km-1 under state plan in the financial year 2025-26 LOT No 2 of 3
Construction of 4x6 mtr span RCC culvert, approach road and protection work at Chorma Nala between Bidar and Koharbhar in Distt. Gorakhpur under Rajya Sandak Nidhi in F.Y. 2020-21 Lot No 1/1
Ward-26, construction work of RCC drain from Kanjadpur turn to Kurmanchalnagar Gate No. 01 till the culvert in front of Neel Kamal showroom and from Khalsa School via Mandi till 100 Feet Square.
1. Construction of footpath from canal culvert towards the temporary Nagar Panchayat office on the west side under the development of the market in ward no. 10 and 14 of Nagar Panchayat Ghaghsara Bazaar
Repairing and reconstruction of Internal Drains, pipe line, A.C. sheet infront of shops and APF, Construction of 05 Nos. Crossing culvert, Interlocking work bitween 9x40M APF, Cleaning and raising the pond at NMY Aligarh
Year of 2023-24 Construction work of RCC Culvert and drain at Moradabad Faruukhabad road (SH-43) Dhannu Mal Petrol Pump Tiraha (Construction of 2x2 and 2x2 m duble Box and 500 m drain)
In Ward No. 45 Datauji Kalan, Datauji Square, from Dr. Subhash shop to the slope of the culvert, construction of footpath with colored strip along with hotmix and tree guard and tree plantation work.
Resurfacing of service road (both side), Construction of footpath, providing and laying interlocking tiles and construction of balance RCC drain work and culvert of along 60M wide road in sector Ecotech-12, Greater Noida
Construction of SGR Building with Billing Center, Retaining Wall cum Boundary Wall, Gate, Road, Culvert, Earth Filling, Tubewell and other Misc. Civil Works at proposed 33/11 k.v. Sub Station Chhauch (New) District Lakhimpur
Flood Protection work for Cluster of Villages Naujallah Naktah etc and Modification of Spur No 1 and construting pipe culvert at River training work Situated on Right Bank of Sharda River in District Pilibhit
REPAIR /CLEANING SEWAGE LINE , PATH,HARDSTANDING, CULVERT , DRAIN, FENCING , BOUNDRY WALL AND MISC WORK AT MH AREA , 2 UB SIG COY AND CMVL UNDER AGE (B/R) AT GE (U) E/M MEERUT CANTT
Zone-1, Ward No. 52, Mantola Repair works including the construction of CC flooring and drains in Haji Nazim (Building No. 5/3), the culvert and lane area, Tilagaj Singh Wali, and connecting lanes.
Repair work of damaged parts including 4x5.00 meter box cell in place of damaged culvert at Km-1.15 due to heavy flood on Nawada Darovast bridge Road in Distt. Shahjahanpur. (Fin Year 2024-25)
Rap. Work Thapar Nagar Gali No-02 near Bhutani Fattas and drian repair in front of Ajith singh kothi, Jaggi Electronice, Gurdwara road, Mission Compounds culvert and other Drain in Patel Nagar word-64
Construction of Interlocking Road From ( Culvert ) h/o Sarnam Singh to h/o Radha Krishna And h/o Brajesh Kumar to Jwala Devi Madir At Village Gautala, Gram Panchayat Chachund, Block Acchalda,Distt Auraiya
Construction of RCC culvert approach road and protective work on the cut of flood damaged road at Madhotanda Kalinagar Shahgarh Assam Road (O.D.R.) in Km-22, 23, 24, 25 and 39 in Pilibhit district.
Cleaning and Desilting taking debris/silt for covered Drains Culvert from Botenical Garden Toilet to Sumshan Gali and Alak Nanda Market to U-38, Mother Dairy to Punjabi Dhabha by Super Sucker Machine, Noida
Under District Lakhimpur Kheri, Construction of Interlocking and culvert from the main road to the village via the primary health center in Palia Sampurnanagar in Gram Sabha Trikolia of Block Palia, Lot No 6
REPAIR OF FLOORING, TILING, PLUMBING, SANITARY, FITTINGS, PAINTING, PLASTER, MONKEY CAGING, REPAIR COMPUND WALL, DRAIN CULVERT, CONCERTINA COIL, CHAIN LINK FENCING, BARBED WIRE FENCING, STRUT GATES, HARD STANDING AND CLEANING OF SEWAGE LINES, SCEPTIC
REPAIR OF FLOORING, TILING, PLUMBING, SANITARY, FITTINGS, PAINTING, PLASTER, MONKEY CAGING, REPAIR COMPUND WALL, DRAIN CULVERT, CONCERTINA COIL, CHAIN LINK FENCING, BARBED WIRE FENCING, STRUT GATES, HARD STANDING AND CLEANING OF SEWAGE LINES, SCEPTIC
Construction of interlocking footpath and covered drain in Ward Nalapar South 05 along the left side of the Fatehpur Dewa Road stretching from the Railway Station turn past the public toilet upto the culvert.
Replacement of Border Flood Lighting Infrastructure along Indo-Pak Border under Punjab Frontier in two phases. (SH: Residual work of providing electrical supply to motorised gate system at culvert in BOP Bahadurke & BOP GG3)
Construction of a link road extending from the culvert near Kurraiya Kala Railway Station, passing through Kurraiya Road Market, up to the paved track (Khadanja) on the outskirts of the village Development Block Puranpur.
SR
AS PER BOQ
Please Refer Tender Document
External Development of Road, Drain and Culvert of Sector-75, 76, 77, 78 and 79 (Construction of Balance road, drain, Footpath and Central Verge on 45M wide road between Sectopr-113 and Sector-80), Noida
Construction of Road, Drain and Culvert in Sector-75, 76, 77, 78 and 79 (Construction of Damaged Drain and Raising/Repairing and Fixing of RCC Drain Cover on road between Sector-74 and 75), Noida
D/O Sector-161 (C/o Servise Road RCC Drain Culvert and Resurfacing of 45m wide Road and other allied work from Railway Corridor to 30m wide road infront of Havells Plot Sector-161) Noida
Work for Line Shifting of 33 KV, 11 KV, LT Lines and Transformers during road widening of Verma Tiraha to ITI Road Culvert under semi turn key basis under jurisdiction of EE, EDD-I, Fatehpur.
Internal development works Construction of Road drain culvert park and water supply line in the campus of under construction 672 Nos G plus 3 EWS houses under PMAY Urban scheme at Village Anaura Sadar Lucknow
Zone-1 Chhata Ward No.-27 Bagh Muzaffar Kolipada Basti, Nal Wali Gali, near Narmadeshwar Mahadev and link lanes, construction of CC flooring and drain repair work and culvert construction work of the main road.
Under District Bahraich, Construction of CC road from Jagdish Singh house/culvert to Bhagwati Prajapati house next to primary school on Behad Chauraha to Kurminpurwa link road in Gram Panchayat Dokri Salempur. Lot No 14
Hariparvat Zone, Ward No. 28 (Veer Nagar) Road construction work using hot-mix asphalt, extending from the Veer Nagar culvert, passing by Ajay Nath Sharma house and Gautam Ji house, up to Rahul Malik house.
Zone-1 Chhatta Ward No.-27 Bagh, near Muzaffar Khan Talwar Enterprises, near Bharat Studios, in front of Bageshwar Temple, construction of CC flooring and drain repair along with construction of culvert in Patema Gali.
Repair and painting of office building, 05 12x88 m shaded auction platform at Naveen Mandi Sthal Jaffarganj, construction of RCC drain, saucer drain, repair of previously constructed drains and construction of crossing culvert, strengthening reconstr
Construction work of RCC covered drain from the corner of the boundary wall of the office of Nagar Panchayat Chitrakoot via Government Girls Inter College and Ashok Singh house till the culvert of PWD road.
Zone-1 Drain repair on the left side of the road and work of interlocking tiles on the side track on the road leading from Romsons factory to the culvert in Foundry Nagar (Part-1)
Cleaning of storm water drain along toe of dump to D/S of 1800mm dia culvert, water coursing along coal transportation road , silt removal etc. including supplying and stacking of stone aggregate at Krishnashila Project
Constructin of Pipe Culvert at Km 0.068, 1.000 and Km 2.000 with its vrbs, sign board, head regulator are repairing painting and writing at Km 0.000. 1.000, 2.000, 3.501, 4.625and Km 5.256 of Chhajlet minor
Leaning and removal of silt/earth from nallah/siltation area of mine towards OB time office along railway line up to double barrel culvert and NTPC boundary wall at Khadia Project during monsoon 2026-27
ZONE-1 CHATTA SR NO.-54 ROAD REPAIR WORK BY HOTMIX FROM CULVERT CROSSROADS IN TRANS YAMUNA PHASE-1 TO GOPAL DAIRY AND VEGETABLE MARKET STREET AND BEHIND WATER TANK IN TRANS YAMUNA PHASE-2.
Work No-21 Ward No-29 Krishnabihari Nagar Peeranpur, construction work of drain from Jilani Masjid to Ayub Khans house and from Mohd. Ahmeds house to Rashidas house and culvert construction work near Shivsharan Chakkiwala.
Zone-1 Drain repair on the left side of the road and work of interlocking tiles on the side track on the road leading from Romsons factory to the culvert in Foundry Nagar (Part-2).
Part B Lot No. 07 Repairing work of damaged bridge and culvert located at Dargah Minor at km. 0.000, 0.300, 0.900, 1.850, 2.250, 2.400 and Bhira Minor at km. 0.000, 0.100, 1.200, 1.430 and 2.150
4. Construction work of footpath from canal culvert towards the temporary Nagar Panchayat office on the east side under the development of the market in ward no. 10 and 14 of Nagar Panchayat Ghaghsara Bazaar.
Construction work of 4x5.00 meter Box cell in place of Damaged Culvert due to heavy flood in Garra devha river at Km-0.600 of Rampur Jaichand Link Road in Distt. Shahjahanpur. (Fin Year 2024-25)
6. Construction of parking space, vending zone and plantation work on both sides from canal culvert towards temporary Nagar Panchayat office under market development in ward no. 10 and 14 of Nagar Panchayat Ghaghsara Bazaar.
Repair work of floor, drain, culvert and drain wall at various places under Cleanliness Survey 2024 in Zone-1 Chhatta Room No. 68 Noori Darwaja, Room No. 35 Dera Saras and Room No. 96 Dhankot.