Loading…
Loading…
7,395 results • Best match
Repairs to Nira Deoghar Dam by applying Epoxy Mortarto Guide wall Tal. Bhor Dist. Pune for 202021
Repairs to End wall of EDA and Tail channel of Alwandi Dam of Vaitarna Hydro Electric Project.
Supplying Security Guard/Watchman of Sina Kolegaon Project, Paranda(Dam, Paranda Pump House and Karmala Pump House.)
Carry out arial survey using Drone for submergence and surrounding area of Gunjwani dam to determine encroachment
Clearing trees- bushes , Repair and construction of essential structures, decoration at Urmodi Dam and Kumathe M.I. Tank.
Construction of dry rubble Check Dam and Mati Bandhara No-1 At Ambegavhan FC No22, Otur Range
M and R to Amadapur Project to Rectify Class 3 Deficiencies Suggested by Dam Safety Organization, Nashik
Providing Security Guard For Security Purpose On Hetawane Dam, Hetawane and Umbarde colony Tal. Pen Dist. Raigad.
Construction of riding tower cum filtration tank at Amalnala dam for tourisum development, Tah. Koprana, Dist. Chandrapur
Removal of hyacinth from Indrayani river of Batwal wasti, Moshi Dam to Hiramata mandir, Charholi STP plant
Providing treatment to arrest leakages through audit no. 1, 5, 6, 22 and 24 of Bhatsa Dam.
Construction of dry rubble Check Dam At Fhulawade F C No 191 (Nala No 1 to 2),
Dhule Indl.Area M and R to WSS Cleaning of Motinala Dam premises and repairing of damaged spillway
Special Repairs to NiraDeoghar Dam By Applying AnticorrosivePaint to Radial Gates and Other Parts of Dam.Tal.Bhor Dist.Pune
Maintence and Repairs and other allied Works Andra Dam Tal. Maval Dist. Pune for the year 20212022
PROVIDING ELECTRICIAN AT SEMI SKILLED MANPOWER FOR ELECTRICAL AT MECHANICAL MAINTENANCE IN MANSOON 2020 AT WADGAON DAM.
Providing Jogging Track and Basic Facilities at Dhasai Dam Campus inTaluka-Murbad, District-Thane. (Under Tourism Programme)
Providing 75MM Dia HDPE Pipeline From Padlag Dam to Chaufula Square at Botha Forest In Khamgaon Range
Cleaning of foundation drain holes and Poros Pipe in gallery of Saddle Dam. Tal- Dodamarg, Dist- Sindhudurg
Tillari Hydro Project Main Dam Dhamane leakage treatment to monolith M4 and stilling basin guide wall Jackating.
Construction of Concrete approach Road to dimbhe dam sub division no 2 Annapur Tal Shirur Dist Pune
Grouting in Stone masonary to stop leakages from Inspection Gallery and Non Overflow section of Supale Dam
Rate Analysis of Electrical Work (vales) for closed pipe line from Pavana dam to Sector 23 Nigdi
Construction of Ghat, Steps and Shed at Jambhe Dam in Taluka-Shahapur, District-Thane. (Under Tourism Programme)
AUGMENTATION OF EXISTING BARSHI WATER SUPPLY SCHEME FROM UJJANI DAM - PHASE II,DIST SOLAPUR UNDER AMRUT 2.0
Providing Security Guard For Security Purpose On Hetawane Dam, Hetawane and Umbarde colony Tal. Pen Dist. Raigad.
Strengthening of breast wall and conduit surfaces of River Sluice No.1 , 4 of Ujjani Dam by Epoxy grouting, cement grouting and epoxy mortar treatment , Strengthening masonry RHS NOF body wall portions of Ujjani Dam by grouting with cementious mater
For Providing Consultancy Services for the Appointment of consultant for A) Development of Bhimashankar Paryatan Udyan at D/S of Dimbhe Dam Tal.Ambegaon Dist.Pune ( Pond 2 to 4 B) Development of Bhimashankar Paryatan Udyan at D/S of Dimbhe Dam Tal
To make compliance of deficiencies pointed out by Dam safety organization,Repair of approch road, Stregthening and restoration of main canal Chainage 0 to 8250 m,Embankment repair at few places for earthen dam portion,New lining,Murum topping on
Providing and applying leakage treatment to Forebay Dam at Kodali for minimising leakage of Monolith No. 2 3 and 4.Providing and applying leakage treatment to Forebay Dam at Kodali for minimising leakage of Monolith No. 2 3 and 4.
Construction of collapsed guide wall due to sliding of hill on Right side Extention of NOF section Embankment behind guide wall and NOF alongwith Gabbion mattressing Saddle Dam d s side toe area treatment and Dam Remaining Work at Ghataprabha Mediu
preparing updated emergency action plan by conducting dam break analysis of the katepurna project as per the guidelines of the CWC and preparing operation and maintenance manual of the project as per the dam safety act 2021 and other allied works
Providing And Applying Anticorrosive Coal tar black paint and oil paint to Radial Gates 12.5 m x 7.62 m - 6 Nos, flap Gates, staircase and ladders on pier 1 to 6 of Koyna dam And Allied mechanical works at Koyna Dam
Providing Epoxy Mortar Pointing and Other Ancillary work at South Spillway Gallery of Bhatghar Dam.
Additional work of shifting of HT, LT Line with DTC which are in ROW of approach road of Jigaon Dam Project near village Jigaon, Takli Watpal, Nimkarda, Mandawa and Adol Tq. Nandura Dist Buldhana (Under Jigaon Project) and handed over to concern MSED
Jangamahatti Medium Project M and R to K T Weir Jangamahatti Turkewadi Karve Mandedurg Dholgarawadi Kowad and Kamewadi Tal Chandagad Dist Kolhapur Plugging and De plugging
Improvement of Road From Karla to Bhutegaon K.T. Weir Km 2/00 to 3/00 and Km 3/00 to 4/300 VR-50 Tq. Jalna
M and R to K. T. Weir at Wadhu Perne Tal. Haveli on Bhima river for the Year 2024-25 M. S. Needle removing and Plugging.
MandR To K.T. Weir at Dehu Nighoje Chimbali and Charholi Tal Haveli Dist Pune On Indrayani River Removing And Plugging Of M S Needles For 202122
Repair work of Mdhapuri P.T., Chaklamba P.T. No.2, Kawadgaon P.T., Amala K.T. Weir, Aadpimpri(Dhumegaon) K.T.Weir, Khandavi P.T. No.2, Sultanpur P.T. Tq.Georai Dist Beed
Repair Work for Pusegaon (katkarwasti),Khatav-3,And Shiraswasti K.T. weir on Yerala river under Guruvarya Late Laxmanraoji Inamdar Lift Irrigation Scheme (Jihe kathapur), Dist- Satara
MandR to KT Weir at Dehu Nighoje Chimbali and Charholi Tal Haveli Dist Pune On Indrayani River Removing And Plugging Of M S Needles For 202021
DG - KUDAL INDUSTRIAL AREA...M and R to Adali Water Supply Scheme...Fixing and removing M.S. needles along with maintenance of K.T. Weir on Kadashi River.
Under Scheme MWCC Sambhajinagar Construction of K. T. Weir At. Abdalpur, Gaurkheda, Mandla, Bazarwada, Ajangaon, Goiwada, Tuljapur-1 and Panjara Bothali, Tah. Arvi, Ashti, Dist. Wardha
CONSTRUCTION OF GATED STORAGE WEIR AT ARJUNI NO.2, DAHEGAON NO.1, LONGADGA NO.1, WANDHALI, PANJHURNI NO.3, WAIGAON BHOYAR NO.1 TA.WARORA DIST.CHANDRAPUR (FRP)
M and R to K T Weir at Karadwadi and Karmbali on Vedganga River Under Patagon Medium Project Tal Bhudaragad Dist Kolhapur Plugging and De Plugging
Repairs to K.T. Weir at Shirasgaon Kata, Inamgaon (Nalge Mala), Inamgaon(Gandhale Mala), Tandali Khore wasti, Tandali Sangam Tal. Shirur By way of Removing Fixing Needles.
Plugging and Removing M. S. Needles of K. T. Weir on Krishna River at Lakadwada, Bhuyachiwadi and Konegaon Tal Karad Dist Satara for year 2021-22
CONSTRUCTION OF GATED STORAGE WEIR AT. AKAPUR 1, PALASGAON KOTHARI 1, PALASGAON KOTHARI 2, TADALA, NALESHWAR, SUSHIDABGAON, CHITEGAON 1 TA. MUL AND BALLARPUR DIST.CHANDRAPUR (07 Works)
Constructing Mini K.T. Weir at Ghatghar Hivala No. 2 comp. No. 66 in Kalasubai Harishchandragad Sanctuary in Rajur Wildlife Range Tal. Akole, Dist, Ahmednagar Div. Nashik