Loading…
Loading…
5,884 results • Best match
stone, concrete and earth work
Dismantling, Replacement /Repair, Erection, Commissioning, Testing of 05(five) sets of Vertical lift Gates of size 8000mm x 3600mm along with Rope drum hoisting arrangements and allied structures for Gobardhanpur Barrage
Improvement and Black topping of road at Satiguda Dam and Road from Ghataghumar to Kolabnagar under UKHW Division, Kolabnagar.
Improvement to periphery road on right side of Kuanria Dam and road to view tower of Kuanria Irrigation Project.
Execution of Earth Dam from RD 1610 Mtr to RD 1950 Mtr of Kanupur Irrigation Project (River Gap Closing).
Earth work excavation, Sand filling, C.C. M10 and M 15 RRHG Stone masonary and 12mm c.p. etc.
Improvement to Sapuanalla
Civil Work
Civi works
Paver Road work
road works
Construction of entrance gate
Installation of required capacity of Transformer for Electrification.
Replacement of Vertical Lift Gates in bay No.1,2,8 9 by dismantling, erection, commissioning , testing, construction of extra bay, walkway including painting of Malaguni Barrage near Rameswaram in Tangi Block of Khurda
Water Hyacinth, silt Clearance and removal of earth cross bundh
IMPROVEMENT TO DRAINAGE CHANNELS
Repair Work
Canal work
Refurbishment of twelve nos of Under Sluice Gate no 13 to 24 of left spillway of Hirakud Dam at Hirakud, Sambalpur.
Fabrication, Supply AND Erection of Gate AND Hoist scouring sluice of Dunduliguda check dam in Kalyansingpur block under MI Division, Rayagada.
RFP for engagement of Proof Engineering Consultant (PEC) for the work Construction of Weir across river Budhabalanganear village Madhapanda of Badasahi block in the District of Mayurbhanj including Hydro-Mechanical Works.....
Construction of Weir across river Budhabalanganear village Madhapanda of Badasahi block in the District of Mayurbhanj including Hydro-Mechanical Works, Power Connectivity Works, Guide Bund, watchman tower, operating building, Road Connectivity....
Construction of Distribution system for 5052.68 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 60.304 km to 71.505 km through Under Ground Pipe Line Irrigation system (Gravity Flow) of ABP
Earth Work, RCC,PCC, Rough Stone Dry Packing etc
Civil Works Roads
Services
Clearing Jungle and Painting
Please refer to Bid documents
Supply and installation of DG Set
Earthwork and concrete work
Improvement and Black topping of Canal service road of right and left distributaries of Bhaskel Dam Project under Nabarangpur Irrigation Division, Nabarangpur
Earthwork, Cement Concrete, Reinforced Cement Concrete, Z-type sheet pilling and RR Stone Works
Earth work sand filling, CC M-10, CC M-20, centering and shuttering, HYSD Bar, Brick work 12 mm C,P, painting, supplying and fixing 80 mm c.c faver block of M-40 grade , filling foundation with exac materials supply and fitting of M.S gate .
Deployment of Security Personnel
Construction of boundary wall
Cement concrete, roof fitting and GCI Sheet fitting.
Building work
O/o Superintending Engineer, UKHW DIV Kolabnagar
Earth Work, RCC,PCC, Rough Stone Dry Packing etc
Earth Work, RCC,PCC, Rough Stone Dry Packing etc
Earth Work, RCC,PCC, Rough Stone Dry Packing etc
Instrumentation
Earth Work, RCC,PCC, Rough Stone Dry Packing etc