Loading…
Loading…
447 results • Best match
Rubber dam kit, Rubber dam sheets, Mandrel for sandpaper, Beading wax box of 12 strips, Mock-up wax box of 200 gm, Plaster of paris pkt of 1 kg, Paste Impression pkt of two tubes containing ZnO Base 125 to165 gm and catalyst, Pontic wax set Box of 300 pcs, Kenacort 0 point 1 percent 7 point 5 gm, BP handle No 3
Modernisation and Renovation of gates and Regulator Structure of Weir Gates for preparation of installation of SCADA system
Painting of super structure of RHR and CHR of Nangal Dam.
AM and R of 15 No. office sheds of RSD, 4 No. office sheds of SPK Project, PESCO, Store, Ware house, Workshop, Personnel and Public relation sheds at SPK and Non residential buildings at Spk and Dam site during the year 2025 26.
Providing and laying patch work with close-graded premix surfacing material of 20 mm thickness from PRO to Top of Dam Left Side and Right side
Estimate for construction of 1 No. RCC Check Dam at Khoni Nallah.
Estimate for construction of 5 No. RCC Check Dam at Jallalia Nallah.
Estimate for construction of 2 No. RCC Check Dam at Tarna Nallah.
Hiring of unskilled Manpower for ensuring routine operations of Regulation Barrage Gates / Canal/ Disty/ Minors/Sub Minors under Talwara Canal Division,Talwara.
Replacement of old electrical installation in right side drainage gallery and left side drainage gallery at Beas Dam.
Removal of remaining redundant structure balance dumped muck maintaining the designed level at toe of main dam and providing pitching on downstream slope of main dam on left out reach at RSD Project
Restoring the original Capacity of Patiari Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material forPatiari Dam in district Hoshiarpur
Renovation of Regulation building and replacement gauge well aluminium work at Nangal Dam.
Real Time Data As a Service for Surface Water Level Measurement System and Rainfall Measurement System at Various Locations in the Catchment Area of the Ranjit Sagar Dam falling in the state of Punjab, HP and J K and downstream of RSD
Restoring the original Capacity of Mirzapur Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material forMirzapur Dam in district SAS NAGAR
Restoring the original Capacity of Damsal Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material for Damsal Dam in district Hoshiarpur
Restoring the original Capacity of Jainti Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material forJainti Dam in district SAS Nagar
Restoring the original Capacity of Janauri Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material for Janauri Dam in district Hoshiarpur
Restoring the original Capacity of Saleran Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material for Saleran Dam in district Hoshiarpur
Restoring the original Capacity of Dholbaha Dam by desilting through excavating and further own the excavated material after paying Royalty to Government for the excavated material for Dholbaha Dam in district Hoshiarpur
Carrying/lifting of River Bed Material already extracted from Power House 2 and stocked at stockyard of department near Power House 2 of Shahpurkandi Dam Project at Village Sadhauri, Tehsil and District Pathankot
R and R of Side and Bottom Rubber Seals of Barrage Gate and Stoney Gate of head works Barot under SPH, Joginder Nagar (H.P.)
Estimate for construction of Check Dam at Suhan Khad near Charan Chhoh Amrit Kund at Khuralgarh Distt Hoshiarpur in Kandi Canal stage-2 Division under Hoshiarpur canal and Dam circle, W.R.D. Punjab, Hoshiarpur
Estimate for constructing 10 no. check dams in Rahon Drain, Badwa Drain, Langroya Drain, Phambra Drain and Rahon Bazidpur Drain in the Jurisdiction of Nawanshahr drainage sub division, Nawanshahr in district SBS Nagar.
Renovation and laying tiles in the office complex of Hoshiarpur canal and dam circle
Estimate for installation of 22 No. Street lights (Florence decorative lights) at Siswan Dam .
Providing cement concrete interlocking paver block at Olinda colony and Dispensary at Bhakra Dam
Estimate for Repairing/Rehabilitation, painting, oiling and greasing of Gates and Gearing system of Cross Regulator of Banur Weir (11 no Gates)
Restoration Work of Damaged Left Bank of UHL River at Down Stream of New Barrage Gate at Head Works Barot under SPH Joginder Nagar (HP).
Estimate for providing water through sprinklar irrigation in tharoli village at Nara Dam in District Hoshiarpur
ESTIMATE FOR Construction of new pond at Village Manhota (Thana Dam) in District Hoshiarpur Punjab.
Estimate for providing Repair, Maintenance and Renovation of office building Kandi Area Dam Circle, Hoshiarpur.
P/F of Khanda Sahib for Beautification of Shri Guru Gobind Singh Chowk, Nangal Dam
Replacement of wiring of Ganguwal Rest House and Kotla Rest house in Nangal Dam Division.
Replacement of Pipe line from Pandoh Dam site to workshop with 4 inch dia pipe
Procurement of spares for Weir design BFP type FK6D30 booster pump type FA1B56 stageII III and CEP s model EN6J40 of stageII and III
ESTIMATE for Construction of New Pond at Village Dholbaha under Dholbaha Dam in District Hoshiarpur Punjab.
Construction of wire crate Check dam for recharging the well at water works near Ghangl khad.
Construction Of Street Dam Road Avdesh Nursery to H/O Vishwanath ward no-2 Mc Talwara
Estimate for installation of 05 No. Street lights with poles on approach road of Siswan Dam.
AM and R of Non Residential building at SPK and Dam site during year 2026 27
Construction of Stone Masonry Water Recharging and Crate weir Structures at Village Sukhchainpur Dharampur Labbar and Pohari under Sub Division Talwara Tehsil Mukerian District Hoshiarpur
Supply of Unskilled Labour for Cleaning of Trash Racks of Barrage Gates, Old Head Works, Desilting Operation of Decantation Chambers and Reservoirs Keeping etc. at Head Works Barot
Supply,installation, testing, commissioning, training, operation and maintenance of SCADA based Automatic operation of Barrage at Ropar Head works and SCADA based Automatic Operation of Sirhind Canal system
Shifting of Drinking Water Supply tank for construction of Shahpurkandi Hydel Channel Shahpurkandi Dam Project (Phase I)
Estimate for Field Survey and Catchment Area Treatment (CAT) Plan of Reservoir Area of Ram Tatwali Dam.
Purchasing Testing Designing Erection and commissioning of Emergency Flood Warning System at Beas Dam Site
Estimate for constructing 10 no. check dams in Kot Mukandpur Drain, Lassara Drain, Jandiala Drain, Talwan Drain, Phagwara Sullage Drain and Kail Nala Drain in the Jurisdiction of phagwara drainage sub division, phillaur in district SBS Nagar, Jalandh
Construction of Street and retaining Boulder Masonary wall Talwara Dam road near Milk Dairy in ward No. 3
Repair of plaster on walls and CC Path at additional temporary office (Bhakra Dam Division) at Nagal Township.