Loading…
Loading…
6,231 results • Best match
Deepening of Open Well at Vaniyar Dam Pappireddipatti Head Works in Pappireddipatti Town Panchayat
DEVELOPMENT OF NEW A SITE KSK AT KONERIPATTI BARRAGE TO POOLAMPATTI, PULAMPATTI VILLAGE, EDAPPADY TALUK, SALEM DISTRICT, SALEM DIVISIONAL OFFICE UNDER TAMIL NADU STATE OFFICE
Supply, Erection and testing of Synchronizing and control Desk for rectification and restoration of fire accident affected Unit 1 at Bhavani Barrage Power House2 Umayapalayam
Improvement works to the panel room for operating the Tunnel gate of Karaiar dam by replacing the damaged wooden doors and windows with steel doors and windows and other allied civil works at Karaiar dam.
Strengthening the road from Kondappanai kanur - Ponnaniyar Dam road Km 0/0-4/2 R55
1.Providing Upgradation and Black Topping to the Iyyanar Kovil Salai to Karupanathi Dam Road
Dam Rehabilitation and Improvement works Chipping and Cement Mortar pointing on the downstream face of the Dam below Geomembrane area in Kadamparai Generation Circle, Coimbatore District, Tamilnadu under the World Bank Funded DRIP (Phase II and III
cleaning the drains disposing of debris, sullages, maintenance of drinking water supply arrangements in and around the quarters area, maintenance of approach road, Dams, power house tail race, trash rack and IB pertaining to Masinagudi Sub Division
Hiring Vehicle for Executive Engineers MM and SI Division MTPSII
Procurement of compact pressure switch and 3 by 2 way mechanically operated poppet valves
Hiring Vehicle for SE PA MTPS2
Procurement of PLC, HMI with its communication cable and UPS 3KVA 4 items
Procurement of Electro Pneumatic Positioner with Feedback Module 2 Nos
Procurement of Sequential Purging Boards 3 items
Works Contract for Pappamady section in Tharamangalam sub division in Omalur division
MTPS II CHP II Removing of Coal Choking in the Coal transfer chutes in SCR machines I II Conveyors 7 9 8A 8B 10A 10B 11A 11B 12A 12B 13A 13B TTR-1 TTR 2
Upkeeping the ground floor of Boiler area, below JT-1 to JT-2 conveyor area and Watering and trimming the lawn on the western side of NDCT for a period of one year from the date of commencement of work
Supply of Spares for SAN Locomotives 7 8 9 1 Item
Man power supply for the maintenance of Project Best Equipments in Mettur EDC for a period of one year .
Procurement of 20KVA parallel redundant UPS with bypass SCVS ISO Transformer 1No
MTPS-II - Civil Circle - UpKeeping of STG building by cleaning, mopping of 17m, 23.50m, 27m and 31.75m floors for a period of 180 days from the date of commencement of work.
Hot End Sector Plate for APH Model LAP 13494 2200 2 Set
Slope Protection - Providing RCC Retaining wall to the slope along the Road No.27 and 28 near MTPS -II Coal yard from Chainage 402.00m to 378.00m
Procurement of Multi Port Pitot Tube Flow Meter For Mill Primary Air Flow Measurement 08 Nos
Supply Erection Testing and commissioning of new single stage oil injected rotary screw type Air Compressor with drive 160KW and 30KW accessories and pipeline and Air drier for Instrument air of PDFACS of Unit III of MTPS I
Dismantling the existing damaged RR Masonry protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV / 110KV SS yard of K.R.Thoppur 400KV SS. (Chainage 110.00m to 145.00m)
MS Flange and Expansion Joint and Reducer and Bolt of various sizes for Existing Conveying Pipe Line 16 Items as per drawing Enclosed
UpKeeping of STG building by cleaning, mopping of 0m, 3.50m, 8.50m, 12m and 13.50m floors, cleaning of toilets in STG building, regulation of potable and service water etc., for a period of 180 days from the date of commencement of work.
Chain 179 links of sealed chain with split master link 1 Set
Works Contract for Chinnathirupathi section in Omalur sub division in Omalur division
Fabrication and Supply of Hot air damper assembly including drive mechanism and connecting links without actuator and pneumatic power cylinder 5 Nos
Scrapper Assembly for Coal Mill Under Bowl 18 Nos Dimensions and Mateial Details are as per Drawing Enclosed
Procurement of Rectangular Non Metallic Expansion Joints 1 No
Supply, erection Commissioning of Slew bearing in SCR-I
MTPS II CHP I Routine Preventive Maintenance works in Reversible Belt Feeder 1 2 at PCH Rotary Breaker 1 2 at PCH Belt Feeder 1 2
Procurement of 250NB MS ERW pipes of 6 mtr length flanged at one end 90 Nos
Up keeping of main drains running along the 585E road, 967N road, 735E road, 800E road, 867.5N road, 1255N road, near Canteen, Chemical Lab, Dispensary and up keeping of toilets in Central office, Fire protection office, Chemical Lab, Dispensary
Upkeeping and removal of dust and dirt in Chemical house, clarified water pump house, roads and drains in PTP area, RWPH and Stores area for the period of 180 days from the date of commencement of work.
Removing of earth below the power evacuation lines (EHT) of 230KV Switch yard to increase the clearance between lines and ground beyond Chainage 25M
Providing concrete flooring around the hot water return pipe line near NDCT, around the Condenser Cooling water supply header pipe line and near the TDBFP
Supply of Hopper Heater 40 Nos
Provision of one number diesel Petrol driven Ambulance van-Tata Winger Force Trax Force Traveller on hire basis for a period of one year from the date of commencement of contract for the purpose of transporting any sick or injured employees o
Supply of 150NB 200NB MS ERW PIPE and 200NB 90 degree Bend 3 Items
Procurement of SEC Wire 21 SWG and SEC Wire 15 SWG
Construction of new Electrical Stock room in Wagan Tippler area of MTPS II.
Providing Aluminium partition with Door between PLC panels and Server cabins in the CHP Control room and Cleaning of septic tanks near Common toilet near JT-7, Dozzer shed and removal of filled up ash in the sumps of
Providing new acid resistant tiles in place of the existing damaged acid resistant tiles in the neutralization pit No-1 near CPU building of MTPS-II for bringing the Condensate Polishing Unit back into service
MTPS CHP 2 EMC Attending daily and Routine maintenance works and up keeping of CEMS Room Environment related equipments and assisting environment monitoring related works for a period of 365 days from the date of taking over of site
MTPS I Operation Circle Chemical Division Engaging of external agency on works contract basis for the works of Collection of various samples for analysis For a period of 120 days from the date of awarding the work
Procurement of spares for Long Retractable Soot Blowers Model IK545 5 Items