Routine Maintenance of CEMS for 365 days
UpKeeping of STG building by cleaning, mopping of 17m, 23.50m, 27m and 31.75m floors for a period of 180 days from the date of commencement of work
Supply of Hydrazine Hydrate 80 percentage Purity As per IS 12086 / 1987 1 M.T.
Hiring vehicle for Executive Engineers MM and SI Division MTPS II
MTPS II CHP II Breakdown Work Preventive Maintenance Works Assistance for carrying out cold Vulcanizing belt joint replacement of worn out damaged conveyors belt removal of weak joint excess elongation of conveyor belt in CHP II etc
Arresting the seepage water in side con 1B at apron feeder 5 with pressure grouting and Providing Micro concrete using construction chemicals of W.T 5 tunnel house of MTPS-II
Up gradation of computerization system in Coal Handling Plant I
Watering to the tree saplings planted at various location inside MTPS-II plant area using tractor trailer for the period from 13.04.2020 to 17.07.2020.
Vane pump for clamping power pack of wagon tippler 2 Nos and Coupling for Vane pump 2 Sets
Supply of Various size of Cast Iron Wafer type Butterfly valves Make BHEL Audco Fouress Kamala Kartar Surya Upadya as per the Specification 2 items
Providing Mill rejects in the portion between eastern side compound wall and Silo road from MTPS II Silo gate to Skew bridge from Ch.210.00 -Ch.530.00 to curtail jungle growth.
Construction of a lean to roof shed for Caustic recirculation tank near Chlorination Building of MTPS2
Procurement of Xerox Papers 3 Items
Providing micro concrete in around the chiller unit area at 31.75m floor of STG Building and other miscellaneous works in STG building area of MTPS-II.
Watering to the tree saplings planted at various location inside MTPS-II plant area using tractor trailer for the period from 05.04.2021 to 03.07.2021.
E-Tender for Procurement of Fabric Bellows and Rectangular bus duct Rubber Bellows 4 items
Construction of store room for MRT division on the eastern side of Switchyard and opposite to DG House of MTPS-II.
Providing concrete coping to the structural columns of Drycon conveyor system in Bottom Ash Hopper area
Clearing the jungle growth, Cleaning of drains at the eastern side of coal yard compound wall, Cleaning of two numbers septic tanks at the eastern side of STG building and providing precast slabs at the intermediate drain in boiler area.
Construction of car parking shed by providing lean to roof with colour coated metal sheets opposite to the control room building at K.R.thoppur 400 KV SS.
Attending repair works replacement of water closet removal of heavy jungle in the residential quarters area at Thermal Nagar-11 (Thottilpatty area), and other works.
Upkeeping of roads and berms of 800E Road, 735E Road, 585E road, 1255N road, 967E road, road leading to Dispensary, Two wheeler sheds, Dispensary and Chemical lab building etc. for a period of 180 days from the date of commencement of work
Upkeeping and removal of dust and dirt in Chemical house, clarified water pump house, roads and drains in PTP area, RWPH and Stores area for the period from 19.07.2021 to 30.12.2021.
Procurement Various sizes of HT Studs and Bolts with Nuts and Washer 27 items
works for effecting services in various schemes in North Kolathur section in Mettur division
UpKeeping of Switchyard buildings, CPU Building, FOPH, CWPH, FWPH, Chlorination building and nearby roads for the period from 05.05.2021 to 31.10.2021 in MTPS-II Premises.
Providing galvalume sheet roofing with flooring to the sewage water disposal pumps and providing cladding sheet with flooring below the lamella clarifier for store room in ETP area.
Removal of silt, slush, ash deposits and other waste materials in all the drains in A-Zone area, around switchyard and along JT-1 to JT-2 areas and clearing the jungle growth in Chimney northern side, Fuel oil pump house western side and Switchyar
Providing one number Diesel Petrol Driven Maruti Swift Tata Indica or equivalent on hire basis for the official use of the Superintending Engineer PA MTPS II
Sprinkling of water over the roads inside MTPS-II using tank mounted tractor trailer for dust suppression purpose for a period of 180 days from the date of commencement of work.
Supply of Concentric reducer air bellow for seal air fan and Air bellow for seal air fan and Seal air fan filter 3 Items
Supply of 50W Cooling Fan and 35 Watts 4 Inch Industrial Fan 2 Items
Ring Granulator (Secondary Crusher House) Screen locating I beam 2 Nos.
Specification for Hiring of Diesel Driven Van for Executive Engineer/ MRT/Mettur for One year
Supplying and spreading of blue metal inside the fencing of 400KV Switchyard 229m level and attending repairs to the R.R.walls and paver blocks by pointing in the 400KV switchyard in MTPS-II.
Procurement of Bearings for Stacker Cum Re-claimer Machine I II 3 Items
Procurement of Castable Refractory and Pourable Refractory 2 Items
Procurement of Venturi for Bag Filter Cage Assembly 208 Nos as per drawing enclosed
works for effecting services in various schemes in T.N Palayam section in Sankari division
Construction of retaining wall in R.R masonry along the northern side of Power Evacuation Towers between Gobi - Thingalur and Karamadai feeder.
MTPS II Mechanical I Circle Oil Ash Handling Division Providing one number diesel driven Tata Sumo Tavera Xylo Bolero on hire basis for the official use of Executive Engineer Mech Oil Ash Handling Division Mettur Thermal Power Station II
Providing one number diesel driven Tata Sumo Tavera or equivalent vehicle on hire basis for the official use of Executive Engineer Civil O and M Dn. MTPSII for the period from 01.10.2021 to 30.09.2022.
Removal of collected debris from the dust bins and accumulated debris in entire plant area for the period from 01.03.2021 to 31.08.2021.
Supply of Sealed Lead Acid Battery 2 Items
Capital Overhauling AOH 2025 Cleaning of forebay of cooling water pump house and disposal of deposited silt slush, Replacement of handrails with 40mm dia G.I pipes in place of corroded worn out handrails at inside walking platform of NDCT, c
Upkeeping of roads and berms of 800E Road, 735E Road, 585E road, 1255N road, 967E road, road leading to Dispensary, Two wheeler sheds, Dispensary and Chemical lab building etc. for a period of 180 days from the date of commencement of work.
works for effecting services in various schemes in South Kolathur section in Mettur division
Providing Mill rejects in the portion between eastern side compound wall and Silo road from MTPS II Silo gate to Skew bridge from Ch.530.00m-Ch.680.00m and western side of washing shed at Silo area to curtail jungle growth.
Split Type Mechanical seal assembly for CEP-3 sets
UpKeeping by removal of dust and dirt in all floors and operating the valves of water supply lines of ESP and MCC Control Room, Central office, Fire station building, ETP MCC room