Loading…
Loading…
6,233 results • Best match
MTPS I TM Unit I Complete overhauling and painting of Service Air Compressors 1A 1B 1C
MTPS 1 BM Unit II AOH2022 23 Application of hard setting sealing compound of Eromat 1003 on the erosion prone area of the Curved portion of APH Outlet at 450 slope in Flue gas ducts
Mettur TPS I Mill Plant Unit II Strengthening Rectification of raw coal bunkers 2A 2B 2C and 2F leak arresting work by patch welding and Providing stiffeners during AOH 2021 22
MTPS I Mill Plant Unit III Renewal of Coal pipe bends coal pipes and fabrication hard facing of coal bends 6nos between Mill Outlet Elbow and Fuel Inlet Elbow etc
MTPS I Civil Circle Periodical Cleaning of septic tanks located near T-4 block in Thermal Nagar3 (R.E Quarters area) and near Q-14 block in Thermal Nagar 5 (A4 area) by pumping out the sewage waste into closed container and disposing
MTPS I BM AOH 2021 22 Unit IV Flue Gas duct A side Patch up works and other repair works between APH out let to ESP inlet
MTPS I Mill Plant Centralised AC Plant Attending Breakdown works in AC Compressor No 2 and 3 AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc
MTPS I BM Lift Preventive Breakdown maintenance for 1 No Freight cum Passenger lift of VIP Lift I of MTPS I for the period of one year from the date of commencement of work
MTPS I TM Unit IV Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and allied works
MTPS I TM Unit III Overhauling and renewal of worn out spares and Bearings and commissioning of Heater Drip Pump 3A and 3B during AOH of 2022 23
MTPS I Mill Plant Unit IV Inspection and replacing inverting of 8 Nos eroded Orifices dia 415 mm 2 Nos dia 406 mm 1No dia 400 mm 2Nos dia 410mm 2Nos dia 396 mm 1No in coal pipes at boiler side 8 locations during AOH 2021 22
MTPS I CA CWS I Complete dismantling inspection Overhaul and renewal of pump components in 1 No Cooling Water Pump of stage I
MTPS I Mill Plant Unit IV Cutting removing of existing worn out mill separator body curved liners and erection of new MS liners in Mill 4A to 4F during AOH 2024 25
MTPS I TM Division Load Testing of 2 Nos 125 30T Station EOT Cranes during 2023 2024
MTPS I BM Unit I Reconditioning of Saw tooth expansion joints in FG ducts near chimney area Strengthening of ESP internal structures ESP Hoppers ID fan outlet flue gas duct deflector plates Cutting and removal of the eroded portion
Mill Plant Unit III overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 3A to 3F
MTPS I Mill Plant Unit Dismantling and assembling of fuel inlet Elbows during Annual overhaul 2023 24
MTPS I CA RWS Complete dismantling inspection and Overhauling of Raw Water Pump and its butterfly valve dismantling fabrication and Erection of damaged raw water intake screens at RWPH
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate valves in mills 2A to 2F during AOH 2021 22
MTPS1 BM DM Plant AOH 2021 Cleaning and painting of inner surface area of Condensate Storage Tank I and III with one coat of epoxy paint
MTPS I BM Unit I Bend removal by hot correction of collecting electrodes Replacing Reconditioning of worn out CERM and EERM shaft and its internal spares and other allied works in the first 2 rows AB and CD pass of ESP during AOH 23 24
MTPS I CA CWS I Strengthening and reconditioning of Stop Log gate 2 Nos in outlet canal of stage I cooling tower
Raising the existing floor level in repair bay floor and replacing the existing damaged window glass panels by new one of RWPH and other allied civil works at MTPS I
MTPS I Mill Plant Unit I Clearing the Mill rejects from Unit I Mill Feeder area weighing in departmental weigh bridge etc
MTPS I Mill Plant Unit II Clearing the Mill rejects from Unit II Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area
MTPS I TM Unit I Overhauling of Valves in Feed Water Main Condensate Extraction Steam Auxiliary steam and Drain Water lines during Boiler License Renewal Work 2020 21
MTPS 1 Mill Plant Unit II Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing
MTPS I TM Unit I to IV Replacement of 2 Nos existing Service hour Completed emergency replacement of Boiler Feed Pump Cartridge by a Reconditioned Cartridge and commissioning
MTPS I - Civil Circle Providing temporary supporting arrangements for cracked column in PCR to prevent from further damages at CHP area of MTPS I
MTPS I TM Unit III Overhauling of valves in Heater Drain Pegging Steam to Deaerator Condenser air Auxiliary steam and Drain Water lines in Unit III during AOH 2021 22
MTPS I TM I Unit IV Inspection and Overhauling of oil vapour extraction fan assembly and renewal of gaskets of Turbine Lub oil line valves NRVs and existing worn out cooling water pipe line of inlet outlet and vent pipes of TLOC SOC AC LOP
MTPS I TM Unit IV Overhauling and renewal of worn out spares and Bearings and commissioning of Heater Drip Pump 4A and 4B during AOH of 2022 23
MTPS I BM Boiler Statutory Inspection 2022 23 Unit I APH B Checking of rotor level sector plate level and axial seal plate alignment Water washing of cold end baskets and other related works
MTPS I Mill Plant Unit II Hot air ducts welding of eroded and worn out portion of hot air duct joints etc
MTPS I Civil Circle Periodical cleaning of Manholes, Inspection Chambers and Sewer lines in the residential quarters area in Thermal Nagar 11 for the period from 06.06.2022 to 30.09.2022
MTPS I TM Unit IV Air Compressor System Cleaning painting renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks of 1 and 2 of Instrument Air System overhauling of Refrigerant Dryer etc
e-Tender for the supply of Cardan shaft for SAN Locomotives as per given Annexure
MTPS I CA CWS II De watering complete cleaning and sludge removal cleaning with bleaching powder including painting the structure of clarifier III during AOH 2023 24
MTPS I TM Unit III Inspection and complete overhauling of Boiler Feed Booster pump 3C
MTPS I CA CWS I Cooling Tower II Overhauling of Flow Control Valves and including reconditioning of worn out spares during AOH 2022 2023 of Unit II
MTPS 1 TM Stage I Unit I and II Overhauling and Load testing of 2 ton capacity EOT crane 3Ton capacity electrical Hoists in LP Bypass valve LHS and RHS and movable 1 ton chain block trolleys in pumps and Compressor area for the year 2020 21
MTPS I Mill Plant Unit I Overhauling of tramp iron chute knife edge gate valves and laying of pneumatic line in mills 1A to 1F during AOH 2021 22
MTPS I TM Unit I to IV Dismantling, Cleaning and assembling of Main oil Tank filters and Centrifuges bowl assembly for the period of 120 days from the commencement of the work
MTPS I BM Unit I AOH2020 21 Flue Gas duct B side Patch up works and other repair works between APH out let to ESP inlet
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze bullet shot of LHS AND RHS of condenser tubes in Unit IV condenser during AOH of 2020 21
MTPS I Mill Plant Unit IV Releasing the journal spring assembly from the journal door dismantling the assembly for inspection complete overhauling of journal spring assy etc
MTPS I BM Unit I and II Rotating parts Removal of deteriorated and peeled off insulation and re Fixing the new insulation materials over the Portion of the common flue gas duct from ESP outlet to ID fan 2A and 2B and Unit I near chimney area
MTPS I Civil Circle Annual Over haul 2025-26 Cleaning of columns, Beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in Cooling tower III
MTPS I TM Unit I Complete overhauling and painting of Instrument Air Compressors 1A 1B and 1C
MTPS I BM Unit I Boiler Pressure parts AOH 2024 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works