MTPS I Civil Circle - Providing micro concrete to the structural support in the sides of hot water line in the stack floor, stair case protection hand rails and other allied Civil works in Cooling Tower II
MTPS I TM Revisioning of all the brakes overhauling of motors in Main hoist Aux hoist Cross travel and Long travel of 2 Nos 125 30 Tonnes Station EOT Cranes
MTPS I BM Unit IV Boiler pressure parts AOH 2024 Water Washing of complete Boiler Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers etc
MTPS I BM AOH 2025 26 Unit IV Complete overhaul of APH A and B Sides and other related works
MTPS I CA CWS II Overhauling of Flow Control Valve complete assembly renewal of its worn out components in Cooling Tower III of Stage II during AOH 2024 25
MTPS I BM DM plant Periodical inspection and overhaul of Contact tank 2 Nos and pressure sand filter bed 4 Nos in DM Plant Stage I
MTPS I Mill Plant Unit IV Dismantling and assembling of fuel inlet Elbows and Hard facing of Fuel inlet Elbows long and short during Annual overhaul 2024 25
MTPS I - Civil Circle - Providing chain link fencing along the boundary at MTPS in UAD area for 200m to 400m long (Reach- II)
MTPS I Mill Plant Unit I Clearing the Mill rejects from Unit I Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G etc
MTPS 1 BM Unit III Annual maintenance 2023 24 A B stream Boiler PA fans FD Fans ID Fans its isolation dampers and APH gear box
MTPS I CA RWS FWPH Complete Overhauling of V12 diesel engine of Emulsifier system at fire water pump House
MTPS I Mill Plant AC Plant Complete overhauling of Stage I Cooling tower and its accessories
MTPS 1 Mill Plant Unit III Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing etc
MTPS I Mill Plant A C Plant Unit III Air Washer System Epoxy painting of blower 3A and spray system spray nozzle cleaning Replacing damaged pipe line Flushing the spray system pipe line
MTPS I BM Unit IV Boiler pressure parts AOH 2023 Water Washing of boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers and LRSB
MTPS I M I Circle CA FP Break down Preventive maintenance works in Hydrant Emulsifyre headers such as dismantling and erection of pipe lines of various sizes patch welding replacement of fire hydrant post removing of slabs and earth work and dewater
MTPS I Mill Plant Centralised AC Plant Attending breakdown works in AC Compressor No 2 and 3 AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc for a period of 120 days from the date of comm
MTPS I CA CWS I Cooling Tower II Overhauling of Flow Control Valves including reconditioning of worn out spares during AOH 2021 2022 of Unit II
MTPS I BM Unit IV Boiler Pressure parts AOH 2022 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works Replacing damaged insulation in boile
MTPS I CA CWS I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of Clarifier I during AOH 2024 25
MTPS I BM Unit I Overhauling of released worn out voith coupling from ID fan 1B to keep it as spare to meet out breakdown of Units I to IV ID fans voith couplings
MTPS I CA CWS I Overhauling of CT ID Fan gear boxes 4 Nos including Static balancing of blades in Cooling Tower I and II
MTPS I CA CWS I CT I Painting of Hot water basin sun shield roof doors and Cleaning the algae and other foreign materials on CT ID Fan blades safety grills inside the fan stack area gear boxes GB foundation in CT I during AOH 2021 2022 of Unit I
MTPS I TM Unit I to IV Attending Breakdown maintenance works of tube puncture and gasket renewal work in LP Heaters Gland coolers Main Ejectors and attending defects in regenerative system as and when required basis for a period of one year
MTPS I BM Unit II AOH 2023 24 Flue Gas duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion etc
MTPS I TM Unit I Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 and 4 etc
MTPS I TM Unit II Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories and disposal of waste insulation materials for Unit II during Annual overhaul 2022 23
MTPS I Mill Plant Unit III Dismantling and assembling of fuel inlet elbows during Annual overhaul 2021 22
MTPS 1 Mill Plant Unit I Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies hard facing of Clamping ring Bowl hub cover strengthening welding of journal header
MTPS I BM Unit I Boiler pressure parts AOH 2023 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st and II nd pass area
MTPSI BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and air washing of Boiler structures, floor and allied works
MTPS I Mill Plant Unit IV Clearing the Mill rejects from Unit IV Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G switch yard area coal yard by using contractors vehicle etc
MTPS I BM Pressure parts Unit I Boiler Statutory inspection 2022 Water washing of boiler Ist and IInd pass area Rectification of defective boiler tubes overhauling of valves sky climber erection operation and allied works etc
MTPS I BM Unit IV Boiler Pressure parts AOH 2024 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
MTPS I BM Unit I and II Boiler Pressure parts Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism etc
MTPS I BM Unit IV AOH 2022 23 Complete overhaul of APH A Side and other related works
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works
MTPS I Mill Plant Unit III Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc in Mills 3A to 3F during Annual overhaul 2023 24
MTPS I BM DM Plant Rectification of damaged Boiler back filling interconnection line between Unit III and IV provided at CST Extending breather arrangement for De Gasser De mineralized water tanks and Unit I to IV CST tanks
MTPS I BM Unit III Boiler Pressure parts AOH 2023 Reconditioning and Hard facing of used and Worn out square coal nozzle tips including SS304 plates and checking of deformation and matching with nozzle
MTPS 1 Mill Plant Unit II Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings etc
MTPS I BM Unit III AOH 2023 24 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts Air ducts and other related works etc in both A and B side
MTPS I TM UNIT III Renewal of piston seal and piston rod packing in HP LP Bypass Valves and its Spray valves Actuators including servicing of Oil filters during AOH of 2024 25
MTPS 1 Mill Plant Unit II Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies mechanical face seal assembly renewal of vertical shaft thrust bearing etc
MTPS I - Civil Circle - Supplying and fixing of brass coated metal letters and Emblem (English and Tamil) in existing black granite board of Main Gate at MTPS I
MTPS I CA RWS Complete Overhauling of Service water Pumps 2 Nos painting of assembly Column pipes pump stool inner and outer sides etc Removal of existing wornout sleeves bearings etc
MTPS I - Civil Circle Replacing the damaged RCC fencing supports by new MS angle in CT I, II and CWPH transformer areas and providing paver block in front of CWPH and attending other allied civil works etc., at MTPS I
MTPS I TM Alignment of Gantry rails with reference to Piano wire for 125 30 Tonnes Station E O T Cranes During 2020 21 for Unit I and II area
MTPS I TM UNIT III changing the eroded control valves reducers expanders pipes and bends Replacing the defective valves size GLV 100 40 ATA in MC28 Modification of HPTIPT existing 1 casing drain line valves
MTPS I Mill Plant Unit IV Dismantling assembling of Mill outlet elbows and it accessories in mill 4B to 4F during Annual overhaul 2020-21