Loading…
Loading…
2,837 results • Best match
EYE1-6627483-25-Desilting of various drain in div 32 (Old 38)-Desilting of various drain in div 32 Edappally Zonal-General Civil Work
EYE1-6627688-25-Desilting of big drains in div 32( old 38)-Desilting of big drains in div 32( old 38)-General Civil Work
Desilting works for this stretch of the canal was not included in the works already arranged and approved earlier as part of the action plan for 2023-24 Items of work include jungle clearance and silt removal The work starts from c
Desilting of Indira nagar thodu in ward 19-General Civil Work
Desilting of pond at Pathadipalam in Sholayar Range during 2021-22
Desilting of Pond at Iruppukallu in Kollathirumedu Range during 2021-22
Desilting of Ponds(8 Nos) at Athirappilly Range during 2021-22
Annual Plan-Thengochal Thodu,NPOL thodu desilting - 38,39,35,-General Civil Work
Desilting of Pond at Pachilavalam in Kollathirumedu Range during 2021-22
Desilting of pond at Mechappilly in Sholayar Range during 2021-22
Desilting of pond at Kummatti in Sholayar Range during 2021-22
Desilting of pond at Thumbikaipara in Sholayar Range during 2021-22
Annual Plan-Desilting Bismi nagar thodu -Ward 23- General Civil Work
Desilting of pond at Chandanthodu in Sholayar Range during 2021-22
Desilting of pond at Choozhimedu in Vazhachal Range during 2021-22
GENERAL-Pallipattu thodu desilting -Ward 33,2 reach 3- General Civil Work
Desilting of Pond at Vachumaram in Kollathirumedu Range during 2021-22
Desilting of check dam
Bund formation and desilting
GENERAL-GPS -I-RBC-2025-2026-Annual Maintenance - Jungle clearance and silt removal of Canals-For various branch canals and distributory canals (under Second reach of R.B. Main canal ) under RBC Irrigation Section, Oottara- For Karippode
GENERAL ACTION PLAN 2024-25 KPIPAM Canal cleaning including jungle clearance, silt removal through LBMC between Ch 23/000km and Ch 31/500 km and Minor rectification works at Ch 30/350km of LBMC General Civil Work
NABARD-Nabard -2024-KPIP-New lining works ,silt removal and jungle clearance between Ch 8/000 km and 9/000 km of LBMC for the year 2023-24-General civil work-General Civil Work-General civil work
GENERAL ACTION PLAN 2024 25 KPIP AM Clearing grass, jungle and silt removal for Pombra, Karakurussi, Karimba I and Karimba II distributaries and minor rectification work at Karakurussi distributary between Ch 1/200 and 1/400 km
KIP Annual Maintenance of canals Jungle clearance and silt removal from the bed of canal and removal of floating bodies and obstructions during water distribution of Enadimangalam distributory from Ch 0m to 6480m Elamannoor maroor distributory from
GPS - I - RBC - 2026 - 2027 - Annual Maintenance -Jungle clearance and silt removal of Canals - Under RBC Irrigation Section, Oottara-For Koduvayur Branch Canal and Peruvemba Distributory Canal- all canals from Ch. 0/000 km to tail end
GPS - I - RBC - 2026 - 2027 - Annual Maintenance -Jungle clearance and silt removal of Canals - Under RBC Irrigation Section, Oottara-For Malayampallam Distributory Canal and Oottara Branch Canal - all canals from Ch. 0/000 km and tail end
GPS - I - RBC - 2026 - 2027 - Annual Maintenance -Jungle clearance and silt removal of Canals - Under RBC Irrigation Section, Oottara-For Pallassana Branch Canal and Vadavannur Distributory Canal -all canals from Ch. 0/000 km and tail end
DESILTING AND SIDEWALL CONSTRUCTION OF MANCHAKKAL THODU
Desilting of small drains in Div.56
pre mansoon urgent desilting work in thottamukku jaladhra thodu
Desilting Kudumby Colony Thode and ST- Sebastian Thode
SDRF-MI- Rectification of flood damages-Desilting of Retender-Muppari thodu in ward 16 of Kanjikkuzhy Panchayath
Desilting of pond at Medicinal pocket area of Vazhachal forest station in Vazhachal Range during 2020-21
Desilting of pond at Ikka shed area of Vazhachal forest station in Vazhachal Range during 2020-21
Desilting
This estimate was prepared for the pre monsoon works includeding Urgent clearing of Light Jungle , Silt removal from CC Drain and Culvert ,removing and relaying covering slabs of side drains, cutting trees in Ayur-Ithikkara
Desilting of thodu
Desilting of thodu
Clearing and Desilting
Desilting of thodu
Desilting of Karichira thodu
Cleaning and Desilting of Darussalam thodu
Cleaning and Desilting of Pallikkeripadom thodu
EYE1/2648031/24 DESILTING OF THRIVENI THODU AND CONNECTED THODU IN DIV.44-DESILTING OF THRIVENI THODE AND CONNECTED THODE IN D44 Kochi Corporation (RETENDER)
PyIP_Desilting of UT near main canal Ch.21_500km, Desilting of Vesala FB near ch.2_300Km, desilting of UT in Azheekkal branch canal near Ch. 11_800Km
FC River course correction work by dredging Korapuzha river from railway bridge at Ch 418 32Km to Korapuzha river mouth in Koyilandy taluk Kozhikode District
GENERAL-KPIP-AM-2026-27-Jungle clearance silt removal and canal cleaning works of LBMC between ch 42/000 km to 52/000 km including water distribution through LBMC for for the year 2026-27-General Civil Work
Annual Maintenance of canals Jungle clearance and silt removal from the bed of canal and removal of floating bodies and obstructions during water distribution RBMC from 34320m to 43000m during water distribution for the year 2021-22Annual Maintenance
Desilting pond Bison Valley Bit 2,Bison Valley Bit ,Aadukulam,Aanakkal,Block 39 under Parambikulam Range