Loading…
Loading…
2,842 results • Best match
GENERAL-KyIP ACP(NP) 2024-25-Clearing jungle and Desilting of Kakkodi Branch canal b/w ch 0/000 km and 10/000 km and its FBs-General Civil Work
-KRE2-2531/24 Kochi corporation Vyttila zonal- Desilting various thodu and removing pola payal at Corporation colony to water land road , Chilavanoor thodu and ponneth by thodu Division no 57
GENERAL-Ward- 11,17 Thrikkakara Municipality-Premansoon work 2023-24 Desilting of Athikkali Thodu in ward 11 and 17 Reach-1 Chainage 0 m-600m (From chitrapuzha to Athikkali bridge )-retender
GENERAL Munsoon preparedness Desilting and removal of debris, waste materials, etc. deposited in Manalilvayal ela thode in East of Nallezhathumukku in Ward No. 14 of Chavara panchayath General Civil Work
DRW 2023-24 MWSS to Malappuram Municipality Panakkad and Melmuri Villages Desilting and Cleaning of collection well and Intake well and Putting up timber Planks at storage weir in Chamakkayam
SDRF Mitigation of flood damages desilting of Desa thodu south portion from Desa thodu palam to Kurumbi kayal in ward no.4 of Thuravoor and ward no 12 Kuthiyathodu panchayath
GENERAL DESILTING Removing wastes cleaning blocks and desiltation of Ayiroor river on the right bank D/S OF check dam near Elakamon Panchayath Ramp work Reach-1-General Civil Work
GENERAL PREMONSOON DESILTING 2026 Urgent removal of silt and all obstructions from Edakkadu Kunnicode Kidangayil thodu in Panchayath Office ward ward no 3 of Vilakkudy Grama Panchayath General Civil Work
GENERAL Desiltation Emergency Monsoon Preparedness 2026 Desilting and clearing the Elathodu from Kodamchira pump house to Illimala moozhikkal thodu which passes through Puliyoor Budhanoor and Pandanad Panchayath in Chengannur Constituency
GENERAL Operation Vahini 2026 2027 Removing obstructions and Desilting of Puthen thodu from Lanka Bridge to Kadakkara bridge in ward no.11,12 and13 at Ezhikkara grama Panchayath in Ernakulam DistrictGeneral Civil Work
Cleaning of RB Main canal from 20/000 to 26/000 km for second, first crops and as and when required,clearing and Desilting
GENERALCPPMLBC Annual maintenance for the year 202425Jungle clearance and silt removal from Main canal between Ch17300 km to 21700 km Pattanchery branch canal ChenthonyKallingalchiraThengode and Karippali distributoryGeneral Civil Work
clearing grass, silt removal before the commencement of water distribution during mundagan and summer necessary internals, man mazdoor for clearing obstructions during water distribution, greese and lock for shutters
clearing grass, silt removal before the commencement of water distribution during mundagan and summer necessary internals, man mazdoor for clearing obstructions during water distribution, greese and lock for shutters
Clearing grass,earth excavation for silt removal ,Extra lift for excavated earth in deep cutting areas, labour for clearing pipe aqueduct,cut and cover, felling life threatening trees etc
Canal cleaning works
GENERAL-Sivagiri Theerthadanam 2024-25- Emergency Cleaning, desilting and removing other blockages in the thodu starting near Janardhana Swamy temple pond and extending up to Varkala beach side in Varkala constituency
DEPOSIT-GENERAL-KPIP Section 4/3 -- Jungle clearance, desilting, removing of slipped earth, floating bodies of LBMC from ch0/000 to 1/300km for the year 2023-24 -General Civil Work
GENERAL KyIP ACP NP 2025 26 Clearing jungle and Desilting of Kakkodi branch canal between Ch 15 600 Km and 20 300 Km and FBs coming from it General Civil Work
Cost of Desilting of pond in various areas ( Neduvarapu area,Parakkulam area,Choolakkallu area,Njanchuchuttanpara area,Pampadum shola hut area) in Kurinjimala Sanctuary under Shola National Parks ranges during 2025-2026
GENERAL MISC 2023 Mullassery Kadavu Mannathra thodu Mannar Desilting and side Protection works of Mullassery Kadavu Mannathra thodu in ward no 5 of Mannar Gramapanchayath in Chengannur constituency General Civil Work
DEPOSIT General KPIP section 4 3Jungle clearance, desilting, removing of slipped earth, floating bodies of LBMC from Ch 0000 km to 1300 km for the year 2024 25 General Civil Work
Handling and Transport on Lumpsum Basis - Desilting of Thottappally Harbour Mouth And Its Channel by Engaging 100 Ton Capacity Suction Cutter Dredger and Transport the Dredged Out Sand to IREL Chavara
GENERAL- KPIP-AM - Jungle clearance, desilting, removing of slipped earth, floating bodies and minor rectification works to Arakurussi distributory in Thenkara Grama Panchayath - for the year 2023-24.-.-General Civil Work
GENERAL-DESILTING -Removing wastes cleaning blocks and desiltation of Ayiroor river on the right bank D/S OF check dam near Elakamon Panchayath Maintenance of ramp Reach-2-General Civil Work
EYE2/6628700/25 DESILTING OF RAILWAY THODU,JAWANCROSS ROAD,LENIN THODU ,SNEHA THODU ETC IN NEW DIV 30(old div 37) Edappally zonal-EDAPPALLY ZONE DIV 37(NEW30)-General Civil Work
Clearing jungle and Desilting of Kakkodi branch canal between Ch.20/300 Km and 23/000 Km and Distributories and FBs coming from it and Edakkara Syphon
EarthenBundformationusingstiff kayalclaylaying geotextileand desilting
Deepening and Desilting Canals
Deepening and Desilting Canals.
Deepening and Desilting Canals.
Desilting and bund formation
Desilting and protection work
Deepening and Desilting Canals
clearing grass and desilting
Deepening and Desilting Canals.
Desilting and Bund formation
Deepening and Desilting Canals.
Deepening and Desilting Canals.
Deepening and Desilting Canals.
Deepening and Desilting Canals
Desilting and Protection Work
Clearing Jungle and desilting of Nadakutazha distributary canal between ch 0/000 km andtailend and Nadakutazha sub distributary canal between ch 0/000 km and ch 2/300km
Cleaning of Palappuram branch canal between Ch 0/000 to 6/000 km for second crop and as and when required clearing and Desilting Mazdoor
clearing jungle, clearing grass, silt removal before the commencement of water distribution during mundagan and summer man mazdoor and tipper for clearing obstructiongreese and lock for shutters and patch work
Clearing jungle and Desilting of Kakkodi branch canal between Ch.23/000 Km and 26/000 Km and Distributories and FBs coming from it and 8/2
Emergency works- Removing and clearing debris deposited at the tail end of Vazhuthoor ela thodu in Neyyattinkara Municipality
KP- Rectification of flood damages-Desiliting of Puthangadi thodu from Pulikkachira to Palukkaripalli at ward no.11 in thanneermukkam Panchayathu.
Desiltation work in Poonoorpuzha at Mokayi in Unnikulam Panchayath.
Restoration of storage capacity of walayar Dam Reservoir by removing silt by means of pnematic dredger and thereafter separating and stack individually.