Loading…
Loading…
2,842 results • Best match
KyIP ACP (NP) 2024-25-Clearingand desilting of Chemmarathur distributary canal between ch 0/000 km and tail end andMudappilavil distributary canal between ch 0/000 km and tail end
GENERAL-KyIP ACP(NP) 2024-25-Clearing jungle and Desilting of Kakkodi branch canal b/w Ch 15/600 Km and 20/300 Km and FBs coming from it-General Civil Work
AMRUT TSS Procurement of Vehicle mounted sewer cleaning equipment for sewerage system maintenance in Thiruvananthapuram Corporation Area Supply delivery trial run and demonstration of combination of high pressure Jetting Suction Desilting type
KPIP-AM-Jungle clearance, desilting, removing of slipped earth, floating bodies and minor rectification works to Arakurussi distributory and RBMC in Thenkara Grama Panchayath -for the year 2022-23 - General Civil Work
GENERAL-Removing pola , floating material and desilting Chilavannor Kayal ATS CARS to DLF flat Flooding thodu -in div(old 52) new 48 General Civil Work-kochi corporation vyttila zone-General Civil Work
GENERAL Monsoon Preparedness 2024 Kolakkad Thodu Urgent Desilting in between Kotipurath thazhe VCB and Mekkalam pattil thazhe in Ward No 8 of Atholi Grama Panchayath Balussery LA Kozhikode District General Civil Work
KWA - DRW 2022 -23 - Source Improvement works(part2) for relieving water stress - ARWSS to M/T/C/P pts.-Desilting og intake well at Parakkadavu and providing protection grill at the intake
GENERAL-JILLA PANCHAYATH DEPOSIT-KPIP SECTION 4/3-2025-26-Jungle clearance ,desilting, removal of slipped earth, floating bodies of LBMC from ch.0/000Km to ch.1/300Km-General Civil Work
Custom Bid for Services - CONTRACT FOR OUTSIDE REFINERY DESILTING HOUSEKEEPING AND MISC JOBS AT SWSS STF JETTY PIPELINE CORRIDOR OF BPCL KR FOR THREE YEARS Similar Category Facility Management Service - Outcome Based
Cleaning of Palappuram branch between Ch 6/000 km to tail end for second crop, first crop and monsoons and as and when directed clearing and desilting
KyIP ACP (NP) 2024-25-Clearingand desilting of Nadakkuthazha distributary canal between ch 0/000 km and tailend andNadakkuthazha sub distributary canal between ch 0/000 km and ch 2/300km
KyIP ACP (NP) 2024-25-Clearingand desilting between ch 0/000 and tailend of Chingapuram distributary canal, Kizhurdistributary canal, Kannamkulam distributary canal, Purakkad Field bothie, Pallikara Fieldbothie and Iringal Field bothie canal
DEPOSIT-GPS -I- RBC - 2024- 2025 - DISTRICT PANCHAYATH - PALAKKADAnnual maintenance of CADA Canals- Field boothi canals and Field canals-Jungle clearance and silt removal of Various Field Boothis and Field Channels
clearing grass twice on both canal side before mundakan crop distribution and summer water distribution, Silt removal from unlined bottom and concreted bed bottom with suitable thickness proposed to necessary lengths
Provisions included the estimate are Clearing grass, Clearing jungle, Earthwork excavation for silt removal, Engaging labours for clearing cut and cover and cleaning, removing trees and bushes growing over aqueduct etc.
clearing grass silt removal bfore the commencement of water distribution during mundagan and summer necessary internal man mazdoor and tipper for clearing obstructions during water distribution and for transporting these materials
GENERAL-Desilting Division 12 (old 63)-Desilting the Dry thode infront of Supplyco -General Civil Work
desilting length of thodu - 1310.00m
Desilting and forming earthen bund
Retaining wall Desilting Bund formation
Cleaning and desilting 2100 m
GENERAL-KyIP ACP(NP)-2025-26-Clearing jungle and Desilting of Kakkodi branch canal between Ch.20/300 Km and 23/000 Km and Distributories and FBs coming from it -General Civil Work
GENERAL- KPIP-AM-Jungle clearance desilting removing of slipped earth floating bodies and minor rectification works to Pallikurup and Chooriyode distributory- in Kanhirapuzha Grama Panchayath for the year 2022-23-General Civil Work
GENERAL Desilting Emergency monsoon preparedness 2025 2026 Rectification of Baveli River Silt slush and boulders due to land slide near Padiyadath thode at Poyyamala in Kelakam Gramapanchayath in Kannur district General Civil Work
GENERAL-KyIP - ACP (NP) 2025-26 Clearing and desilting between ch 0/000km and tailend of Panthalayani FB, Viyyur FB,Vellarkad distributary canal, Kodakkad distributary canal and Kakkulam Field bothie General Civil Work
Annual maintenance
Annual maintenance
Annual maintenance
Annual maintenance
The cleaning of canals and desilting is inevitable to enable smooth water distribution and conveyance of water through the RBC canals to the paddy fields during the year 2026 and this work needs to be executed prior to water distribution
GENERAL-Monsoon Preparedness 2024- Arathil Vayal thodu-Urgent silt removal from Arathil Vayal thodu (Near Kotta) for ensuring smooth flow during monsoon in Cheruthazham Panchayath, Kalliassery constituency, Kannur District-General Civil Work
Provisions included the estimate are Clearing grass, Earthwork excavation for silt removal, Engaging labours for clearing cut and cover ,UT and cleaning, removing trees and bushes growing over aqueduct,tree cutting etc.
Investigation work
Desiltation of Patchilavalam pond in Kollathirumedu Range during the year 2020-21
Desiltation of Vachumaram pond in Kollathirumedu Range during the year 2020-21
Restoration of storage capacity ofMeenkara Dam Reservoir by removing silt and silt mixed with sand and clay by means of Pneumatic suction pumps and thereafter separating them individually into seperate stacks in measurable form
Desiltation of pond in Kummati in Sholayar Range during the year 2020-21
GENERAL Monsoon Preparedness 2024 Kolakkad Thodu Urgent desilting and removal of obstructions to D S of Chathanparambath thazhe VCB in ward No 7 of Atholi Grama Panchayath, Balussery LA Kozhikode dist General Civil Work
GENERAL-Civil work-Sivagiri Theerthadanam-Emergency Cleaning,desilting and removing other blockages in the thodu starting near Janardhana Swamy temple pond and extending to Varkala beach side in Varkala constituency-2023-General Civil Work
GENERAL-KyIP - ACP (NP) 2025-26- Clearing and desilting of Villiapally distributary canal between ch 0/000 km and tailend and Thodannur distributary canal between ch 0/000 km and tailend-General Civil Work
Earthwork excavation,Clearing and removing thick Karuka (Hyacinth)
CPP MLBC Annual maintanence for the year 2022 23 Clearing jungle and silt removal from High level canal between Ch 0 000 km and 7 000 km High level canal General Civil Work
clearing grass silt removal before the commencement of water distribution during mundagan and summer necessary internals man mazdoor and tipper for clearing obstructions during water distribution and for transporting debis and other materials
Annual maintenance
Desilting is planned for a total length of 950m , in which 200m is coming under curve portion and 750 m coming under striaght portion.In curve portion depth of excavation is 80cm and 50cm is the depth of excation for straight portion.
Rectification of Bund,Desilting of Thodu
Rectification of Bund,Desilting of Thodu
Rectification of Bund,Desilting of Thodu
Rectification of Bund,Desilting of Thodu
Water hayacinth and desilting of thodu