Loading…
Loading…
2,835 results • Best match
GENERAL KPIP AM 2026 27 Clearing grass,jungle,silt removal and water distribution for LBMC CH 2 500 KM TO CH 10 940 km General Civil Work
GENERAL KPIP AM 2025 26 Clearing grass jungle silt removal and water distribution for LBMC CH 2 500 KM TO CH 10 940 km General Civil Work
CSM-2020-21 Annual maintenance of LBMC b/w ch 29/300km to 34/600 km including clearing silt removal of cut and cover d/s portion
CSM-2021-22 Annual maintenance of LBMC B/W ch 22/950km to 25/000km including clearing and silt removal of Killimangalam, Pynkulam and Panjal branch canal.
GENERAL ACTION PLAN 2024 25 KPIPAM Canal cleaning including jungle clearance silt removal through Mannampetta No 1 and No 2 Eswaramangalam and Valambilimangalam distributories General Civil Work
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Olassery branch canal between ch 0/000 to 4/200 km
GENERAL CPP MLBC Annual maintanace for the year 2023 24 Jungle clearance and silt removal from mettupalayam,mangode and ayyampadam branch canal including attanchery and karikulam distributory
GENERAL KyIP ACP NP 2025 26 Urgent Works for Jungle Clearance and silt removal of All Distributaries and Field bothies of Azhiyur Branch Canal General Civil Work
GENERAL-KPIP-AM-Jungle clearance , silt removal and canal cleaning works of Karumanamkurussi, Kulakkad distributaries and Kuttanassery minor distributary for the year 2024-25-General Civil Work
GENERAL CPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Main canal between ch21/400 km to 24/500 km
GENERAL CPP MLBC Annual maintanace for the year 2023 24 Jungle clearance and silt removal from edayankulambu branch canal and edayankulambu ext.1 and edayankulambu ext.2
GENERAL-KyIP- ACP (NP) 2025-26 Urgentworks for Jungle Clearance and silt removal of RBMC From ch 12 500 km to 20 000 km General Civil Work
GENERAL03 2023 24 Clearing the cut and cover Kolliyil Branch canal Clearing the cut and cover including silt removal upto Ch 1536 m in Kolliyil Branch canal
KPIP AM Jungle clearance Silt removal and minor rectification works for all distributaries between Ch 52/000 km to 61/700 km for the year 2023 24
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Olassery branch canal between ch 4/250 to 8/500 km
GENERAL-AP-2025-26-MP-Annual maintenance-2025-26 -Silt Removal , Jungle Clearance for LB main canal from ch 20/200km to 31/600km.-General Civil Work
GENERAL-KYIP-ACP(NP) 2024-25-Urgent works for Jungle Clearance and silt removal of RBMC from ch 12/500 km to 20/000-General Civil Work
CPP MLBC Annual maintenace for the year 2022 2023 Jungle clearance uprooting and silt removal from Koduvayoor branch canal between ch0/000 km to 2/700 km
DEPOSIT KPIP DEPOSIT Jungle clearance and silt removal for LBMC Between Ch 31 500 km to 33 000 km for the year 2024 25 General Civil Work
GENERALCPP MLBC Annual maintenance for the year 2023 24 Jungle clearance uprooting and silt removal from Olassery branch canal between Ch 0/000 to 4/200 km
GENERAL ACTION PLAN 2024 25 KPIP AM LBMC Clearing grass jungle and silt removal between Ch 10 940 km and 23 000km of LBMC General Civil Work
GENERAL-KyIP- ACP (NP) 2025-26 Urgent works for Jungle Clearance and silt removal ofLBMC From ch 14 400 km to 26 000 km .-General Civil Work
DEPOSIT-KPIP-Section 1/3-Clearing Jungle, Silt removal and water distribution works through Arakurissi Distributary for the Year 2025-26-General Civil Work-General Civil Work
Desilting
MAINTENANCE DREDGING OF AREA BEHIND THE NAVAL JETTIES AT SOUTHERN NAVAL COMMAND, KOCHI BY DEPLOYING A SUITABLE CUTTER SUCTION DREDGER(S)
Silt clearance
clearing jungle ,earth work for silt removal man mazdoor and Hydrolic excavator
Dredging / excavation for a Cutting Depth Minimum 3 Mtrs, and stacking the materials in Stock point at a distance within 5 km radius at palakkod fish landing center,Kannur. Collected material to be washed to remove the salt and also mud, other impuri
Urgent Works for Jungle Clearance and silt removal of-Velom BC from ch 0.000 to tail end and All fbs from this canal
GENERAL-Ward-27 desilting of drain -Ward-27 desilting of drain-General Civil Work
GENERAL-Ward-10 Desilting drain -Desilting various drain at ward 10 -General Civil Work
GENERAL DESILTING Desilting the Areethodu from Thottadi to Vattadi in Thalavady and Edathua panchayath
GENERAL-Ward-31 Desilting drain -Desilting various drain at ward 31-General Civil Work
GENERAL-Ward-36 Desilting drain -Desilting various drain at ward 36-General Civil Work
Re Tender 142/22 Dredging of Thodu from Pathil House to Manalady Boat jetty in Ramankery Grama Panchayath
Silt removal
Silt removal
silt removal
silt removal
Silt removal
Silt removal
silt removal
Silt removal
Silt removal
Silt removal
Silt Removal
Silt removal
silt removal
Silt Removal
Silt removal