Loading…
Loading…
2,835 results • Best match
Maintenance Dredging in Udyogmandal Canal of National Waterway.3 Kerala using backhoe dredger
Maintenance Dredging in front of the new and old Wharf of Beypore Port
( NP )2024-25-Urgent Works for Jungle Clearance and silt removal ofall distributaries and field bothies of Thunery Branch Canal
CSM-2020-21 Annual maintenance of LBMC b/w ch 34/600km to 40/900 km including silt removal of Kondayur branch canal
GENERALCPPMLBCAnnual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Main canal between Ch21400 km to 24500 kmGeneral Civil Work
GENERAL ACTION PLAN 2024 25 KPIP AM Clearing grass Jungle and silt removal for Pulapatta No 7 and Vengassery distributaries General Civil Work
GENERAL CPP MLBC Annual maintanence for the year 2023 24 Jungle clearance and silt removal from old Arampadam,Karippode distributory and Pokkunni distributory
GENERALCPPMLBCAnnual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Vilayanchathannur branch between Ch0000 km to 4000 kmGeneral Civil Work
GENERAL-KyIP ACP (NP) 2024-25-Jungle clearance and silt removal of LBMC ch 3 080 to 14 400 km-General Civil Work
GENERAL-KyIP ACP (NP) 2024-25-Jungle clearance and silt removal of LBMC ch 0 000 to 3 080 km-General Civil Work
GENERAL-AP-2025-26-MP-Annual maintenance-2025-26-Silt Removal , Jungle Clearance for Ethanur, Kakkayur and Koduvayur branch canals. -General Civil Work
GENERAL-Monsoon preparedness- Kallur- Urgent silt removal from Thodu in Kallur harijan colony in Mattannnur Muncipality Mattannur constituency Kannur district-General Civil Work
DEPOSIT KPIP DEPOSIT 2025 26 Jungle clearance and silt removal for LBMC between Ch. 31 500km to Ch. 33 000km. General Civil Work
DEPOSIT-KPIP-Deposit work 2025-26 -Jungle clearance Silt removal and canal cleaning works through Veeramangalam distributary and Poothakkad distributary -General Civil Work
Urgent Works for Jungle Clearance and silt removal of Azhiyur Branch Canal from Ch 12/500km to 17/100km
Urgent Works for Jungle Clearance and silt removal of Azhiyur Branch Canal from Ch 0/000km to 12/500km
de-silting liquid mud in the sump well , removal of liquid mud from drains inside the gallery, washing and cleaning floor and sides of the gallery and bailing out water from penstock gallery, chemical analysis, food expense for higher officials
KyIP ACP NP 2024 25 UrgentWorks for Jungle Clearance and silt removal of Edachery Kummankode and KuttippuramDistributaries from Ch 0 000km to Tail end
GENERAL-Andhakaranazhy-Budget work 2025-26 -Dredging from Kadakkarappally Andhakaranazhy pozhichal towards south in Cherthala LAC-General Civil Work
CheriyamundamGP Pro no 70 Construction of Side Protection and Dredging work at Varoo Thode
DEPLOYMENT OF CUTTER SUCTION DREDGER (CSD) FOR DREDGING CSL BD RECESS AND RD MOUTH
Cheruvathur Fishing Harbour-Urgent dredging and deepening of basin works to Cheruvathur Fishing harbour
MAINT DREDGING FOR BEHIND SNC JETTY FOR THE YEAR 2022-23 AND 2023-24
CSM 2022-23 Annual maintenance B/W ch. 25/000 km to 29/300km including silt removal of cut and cover U/S portion
GENERAL KyIP ACP(NP)-2025 26 UrgentWorks for Jungle Clearance and silt removal of alldistributaries and field bothies of ThuneryBranch Canal General Civil Work
GPS-1-RBC-2024-25-Annual maintenance of canals-Jungle clearance and silt removal of RB main canal ch 03/000 to 06/000km
GENERAL-KyIP ACP (NP) 2024-25-Jungle clearance and silt removal of Palery dty ch 0/000 to 4/750 km-General Civil Work
GPS-1-RBC-2024-25-Annual maintenance of canals-Jungle clearance and silt removal of RB main canal ch 12/000 to 15/000km
CSM 2021-22 Annual maintenance B/W ch 25/000 km to 29/300km including silt removal of cut and cover U/S portion
GENERALNON PLAN 202425CPPMLBCAnnual maintenance for the year 202425 Jungle clearance and Silt removal from Arampadam Branch Canal between ch 10050km to 19000kmGeneral Civil Work
GENERAL-KPIP-AM-2025-26-water distribution works through RBMC and Clearing jungle, Silt removal, water distribution works through Arakurissi distributary-General Civil Work
GPS-1-RBC-2024-25-Annual maintenance of canals-Jungle clearance and silt removal of RB main canal ch 0/000 to 3/000km
GENERALAction plan 2024 25 KIP O amp M Annual Maintenance work under the section 13 4 charummoodu Clearing jungle and silt removal of Nediyapaadam
GENERALNON PLAN 202425CPPMLBCAnnual maintenance for the year 202425 Jungle clearance and Silt removal from Arampadam branch canal between ch0000km to 5000km General Civil Work
GPS-1-RBC-2024-25-Annual maintenance of canals-Jungle clearance and silt removal of RB main canal ch 09/000 to 12/000km
GENERALCPPMLBCAnnual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Kinassery branch canal between Ch0000 km to 3500km General Civil Work
GPS-1-RBC-2024-25-Annual maintenance of canals-Jungle clearance and silt removal of RB main canal ch 06/000 to 09/000km
GENERALCPPMLBCAnnual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Olassery branch canal between Ch0000 km to 4200 kmGeneral Civil Work
GENERAL CSIND-IWT DEVELOPMENT OF WATERWAYS AND CANALS THALASSERY DREDGING Dredging of water way in Anjarakkandy river from Ch 1.800 Dharmadam boat jetty to Ch 11.000 Mambaram bridge in Kannur district General Civil Work1
KyIP ACP NP 2024 25 Urgent works for Jungle Clearance and silt removal of Thuneri Branch Canal from ch 0 000km to Tailend
dredging of the berthing area, covering a dimension of 60 meters by 30 meters with a cutting depth of 2 meters (60x30x2 3600m3), is recommended.
GPS-1-RBC-2024-25-A M of canals jungle clearance and silt removal of branch canals and distributory canals under RBC irrigation section oottara
Clearing grass and desillting
Desilting Drain at ward-26-Desilting of drain in kunnumpuram road
ACP NP 2024 25 Urgent Works for Jungle Clearance and silt removal of Azhiyur Branch Canal from Ch 0 000km to 12 500km
KyIP- ACP( NP )2024-25-Urgent Works for Jungle Clearance and silt removal of all Distributaries and Field bothies of Azhiyur Branch Canal
Clearing jungle, silt removal and minor rectification works of LBMC between Ch 23/000 km and 33/000 km for the year 2023 24
Clearing jungle, silt removal and minor rectification works of LBMC between Ch 10/940 km and 23/000 km for the year 2023 24
GENERALCPPMLBC-Annual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Koduvayur branch canal between Ch0000 km to 2700 kmGeneral Civil Work
GENERALCPPMLBC-Annual maintenance for the year 202425 Jungle clearance uprooting and silt removal from Olassery branch canal between Ch4250 km to 8500 kmGeneral Civil Work