Loading…
Loading…
797 results • Best match
Providing CC Channeling, desilting and strengthening of bank in between RD 0.00 km to RD 3.300 km of Mariwada Minor
Cleaning and desilting of 2 nos settling tank and barbed wire fencing of MDTP of LOCP of IB Valley Area
Custom Bid for Services - Chartering of cutter suction dredger on CuM basis and disposal of dredged material through shore and floating pipeline at northern sea shore at a distance of 10km approximately for carrying out dredging at North BOT complex ..
Repairing of well type syphone, repairing of fall and desilting of canal
Custom Bid for Services - R-1700-Desilting of raw water reservoir at Jhollaguda intake, hill top pump house, drains & other miscellaneous civil work of NALCO Mines, Damanjodi Similar Category Support Services
Desilting of Coal Mock/Coal Dust from Basundhara river of both side of the Bankibahal Bridge at Kulda OCP Under BA
Desilting of Storm Water R and B Drains in BMC area for ensuring Monsoon 2025 under PWD Division-I (Phase-I)
Desilting of storm water Main Drain No 7 from RD 3200 to 6340m from Ratha Road to Gangua Nalla under BMC
Desilting and cleaning of road side drains coming under jurisdiction of Bhubaneswar RandB Division No.V, Bhubaneswar for the year 2023-24.
Desilting of Storm Water R and B drains in BMC Area for ensuring monsoon 2025 under PWD Division-I (Phase-II)
Cleaning, Upkeeping, Desilting and maintenance works at sedimentation pond, Sanjeebani Vatika of Lingaraj OCP, Lingaraj Area (for a period of 730 days)
M/R to desilting of Banapat Minor from RD 00 to 10.50 Km including its Sub-minor for the year 2025-26.
Restoration and Desilting of Poichandia Main Canal in between RD 3650.00mtr to tail end including offtaking Minor Canal of Poichandia Irr. Project.
Weed clearance of Right Main Canal from RD 00m to RD 5880m and desilting of its offtaking canals of Manjore Irrigation Project.
Desilting and cleaning of approach channel from river Brahmani to Intake well of IWSS, Lingaraj area (For a Period of one year).
Improvement to canal supply by desilting and weed clearance from RD 00m to RD 5880m of RMC of of Manjore Irrigation Project.
Improvement of Tumlia Minor-II with Desilting of Tumlia Minor-I and Tumlia Sub-Minor of Sankara Distributary of Talsara Irrigation Project
Desilting of coal muck/coal dust from both side of the Bankibahal bridge of Bankibahal River under Kulda OCP under Basundhara Area
Desilting of raw water reservoir at Jhollaguda intake, hill top pump house, drains and other miscellaneous civil work of NALCO Mines, Damanjodi
Desilting from RD 0.00 km to 1.800 km and channeling from RD 0.770 km to 0.990 km of Potteru Sub-Minor-I
Improvement to desilting of Saranalla from D/S of Aqueduct from RD 100 m to 2250 m for the year 2025-26.
Desilting of Internal Storm Water R and B Drains in BMC Area for ensuring Monsoon 2026 under PWD Division-1 (Reach-I)
Desilting of MSWC drain from Ananta Nageswar temple to Matrubhawan gate to Link road Petrol Pump front culvert in Ward No.37.
Desilting of Bed and improvement of canal banks of Mandara Minor from RD 00 to 9000 m for the year 2025-26.
Desilting of coal muck/coal dust from Basundhara river of both side of the Bankibahal bridge at Kulda OCP under Basundhara area
Dredging of Hansua Drainage Channel Cut U/S of Nagari Creek.
Dredging of Luna River from RD.11.00 Km to 17.00 Km.
Desilting and jungle clearance of Link Canal from RD 0.00 km. to 8.680 km. for the year 2025-26. (MB42/2025-26)
Desilting and jungle clearance of Link Canal from RD 0.00 km. to 8.680 km. for the year 2024-25. (MBD17/2024-25)
Desilting and jungle clearance of Link Canal from RD 0.000 km. to 8.680 km. for the year 2026-27. (MBD31/2026-27)
Desilting and jungle clearance to Right Main Canal from Burudanga, Talasingi and all water course of S.Tikarapada, Goulunda, Kaithakhandi of Ghodahada Irr. Project.
Desilting of settling pond at different locations of Block-A and B Mines lease area of Gandhamardan Mines in the district of Keonjhar.
Desilting of storm water Main Drain No 7 from RD 00 to 3200m from Ganga Nagar starting point to Ratha Road under BMC
Desilting and open trough lining of Lahunipada branch canal of Kuradhi MIP in Koida Block of Sundargarh District under MIPSP Scheme 2023-24.
M/R to desilting of Mahanadi Canal from RD 9.00 Km to 16.50 Km including Khariaputi Sub-minor for the year 2025-26.
M/R to desilting of Mahanadi Canal from RD 19.10 Km to 26.00 Km including Balisira Sub-minor for the year 2025-26.
Annual maintenance, Desilting of Strom Water R and B drains in BMC area for ensuring Monsoon 2026 under PWD Division -1 (Reach -II)
Desilting and jungle clearance of Mahanadi Canal and its Sub-minors from RD 10.10 Km to 17.10 Km for the year 2026-27.
Desilting and jungle clearance of Mahanadi Canal and its Sub-minors from RD 20.20 Km to tail end for the year 2026-27.
Desilting of internal storm water drains of Works Department under R and B Division III handed over to BMC for the year 2024-25
Desilting of Strom water Main Drain No 7 from RD 3200m to 6340m i.e. from Ratha Road to Gangua Nallah for Monsoon 2025-26
Desilting of Internal storm water Drains of Work Dept under R and B Div-III Handed over to BMC for the year 2023-24
Desilting of storm water Drain No-10, Cleaning work of silts wastage and floating materials near Trash Rack Point, Behera sahi in BMC Area.
Desilting of Manarbeda distributary Titirikata subdistributary Baluaghara subdistributary Madhyapur subdistributary Belpunji Tail distributary and its system of Belpunji Branch canal of Manjore Irrigation Project.
Improvement and Desilting of Tainsar Minor Madhapur Sub-Minor Manpur Sub-Minor and Telinali Sub-Minor of Left Main Canal of Manjore Irrigation Project.
Desilting of Storm water Main Drain No 1 and Link Drain from Niladri Vihar Fire Station to Main Drain No. 1 in Bhubaneswar City
Renovation of structures and slope protection works, desilting and jungle clearance of Nandagaon Minor-I and Nandagaon Minor-II for the year 19-20
Construction of CC walling, outlet and Desilting of main canal of Kanakjore MIP in Tangarpali Block of Sundargarh District under MIPSP Scheme 2023-24.
Desilting of Internal Storm Water Drains of Works Department Under R and B Division No. III handed over to BMC for the Year 2026
Dredging of Mugura Nallah from RD 8.160 Km to 12.840 Km under DIP.