Loading…
Loading…
797 results • Best match
Dredging of Luna River from RD 7.00 Km to 11.00 Km with structures.
Desilting and Jungle clearing of Sukal Distributary from RD 26.00Km. to 32.600Km and with its Minor and Sub-Minor from RD 00Km. to tail
Removal of unwanted grass cover, desilting drains at downstream of Earth Dam and cleaning spillway gallery of Rukura Irrigation Project for the year 2024-25.
Strengthening and desilting of Main Canal of Right Distributary from RD 16000 m to 20000 m of Daha Irrigation Project for the year 2025-26.
Construction of protection wall from RD 12.800 km to RD 13.270 km and desilting from RD 13.300 km to RD 14.275 km of Koimetla Distributary
Desilting of Storm Water Main Drain No 1 and Link Drain Drain from Niladri Vihar Fire Station to Main Drain No 1 at Bhubaneswar City
Resoration and Desilting of Right Main Canal in between RD 0.00 Km to 9.800Km including all offtaking distributaries and Minor canal of Bahuda Irrigation Project.
Desilting , jungle clearance, lining and bank raising of Telipalas Disty from RD 6.30Km to RD 7.30Km under non-plan (Critical) for the year 20-21
S.R to Desilting of RCC internal drain of M.L.A colony unit IV Madhusudan nagar Internal drain of Raj Bhawan, Bhubaneswar for the year 2023-24
Repair of C/R cum escape, construction of retaining wall (L/B outside slope) desilting and strengthening from RD 44.800 Km to RD 45.910Km of GMC.
Custom Bid for Services - Under water desilting of Intake jack well at Intake point of Alumina Refinery NALCO Damanjodi Similar Category Manpower Outsourcing Services - Minimum wage
Resoration and Desilting of Right Main Canal in between RD 10.00 Km to tail end including its offtaking Distributaries and Minor canal of Bahuda Irrigation Project.
Desilting, jungle clearance, bank raising and slope protection work of Telipalas disty from RD 3.30Km to 5.80Km under Non-Plan (Critical) for the year 2020-21.
Canal lining with Trough wall of Madhyapur Distributary from RD 1903m to 1980m and Desilting of Madhyapur Distributary with its offtaking canals of Manjore Irrigation Project.
Canal improvement
Desilting of Raw Water Reservoir at Jhollaguda intake, Hill Top pump house, drains and other miscellaneous civil works inside Mine Premises at Panchpatmali Bauxite Mines, Nalco, Damanjodi.
Desilting of Manarbeda distributary Titirikata sub-distributary Baluaghara sub-distributary Madhyapur sub-distributary Belpunji Tail distributary and its system of Belpunji Branch canal of Manjore Irrigation Project.
Desilting of storm water drain 2 and chain link fencing at different culverts including Daily cleaning Nov 23 to Apr 24 near trash rack of BBSR City
Desilting of Strom Water Main Drain No. 7(Reach-1) from RD 00 to 3200m i.e. Ganga Nagar Starting Point to Ratha Road for Monsoon 2025-26
Renovation of protection wall from RD 00M to 10.00M and desilting of RMC in Badhia MIP in Narasinghpur Block under Critical grant for the year 2024-25.
M/R to Desilting from RD 00m to 13500m of Left Main Canal of Upper Jonk Irrigation Project for the year 2023-24 (Silt and Jungle Clearance)
Renovation of cross toe drain alongwith cleaning and desilting at different location in the D/S of 3rd Gap of Left Dyke for the year 2025-26
Desilting of MSD from Susama Bhawan to Railway level crossing via Budha Baba Ashram and Sikharpur U.P. School Kamalakanta Vidyapitha Sump at Sikharpur in Ward No.46.
Improvement to Soso Branch Canal including left bank raising, strengthening, bush cutting, bed cleaning, desilting, flank dressing ) from RD. 00M to 8400m for the year 2023-14
Ash removal from Stage-I and II ash water tanks of NTPC-Kaniha by dredge pump which can discharge minimum of 50 cubic meter per hour up to 500meter.
Jungle clearance, Earth work and wall painting two coats.
Desilting and Slope protection wall within RD 12.540 km to RD 12.700 km and Raising of wall from RD 12.800 km to RD 12.900 km of Tatiguda Distributary
Construction of C.C guard wall with bed lining within Rd.150m to 250m and desilting from Rd.250m to 550m Subdega sub-minor-III of Talsara Irrigation Project
Improvement and construction of slope protection work within RD 0.060km to RD 0.200km and desilting and strengthening to left bank within RD 0.00km to RD 4.00km of LMC.
Regular Cleaning and Desilting of ground water tank, settling tank and pucca drain along railway track of Kanika Siding of Garjanbahal OCP under Basundahra Area. (1st Re-Tender)
Clearance of jungles, water hyacinth, desilting and raising strengthening of right main canal in between RD 14.600km to RD 31.500km of SIP, malkangiri for the year 2023-24.
Clearance of jungles, water hyacinth, desilting and raising strengthening of right main canal in between RD 0.00km to RD 14.500km of SIP, malkangiri for the year 2023-24.
STREET SWEEPING, DRAIN CLEANING, BUSH CUTTING AND UPROOTING , DEWEEDING, DESILTING AND DOOR TO DOOR SEGREGATED WASTE COLLECTION OF CHAMPUA NAC FOR WARD NO-01 TO WARD NO-13
Custom Bid for Services - CONDUCTING A DETAILED BATHYMETRY SURVEY FOR DESILTING OF RAW WATER RESERVOIRS ALONG WITH PREPARATION OF DETAILED ESTIMATE FOR TENDERING PURPOSE OF CPP, NALCO Similar Category Support Services
Rate Contract for Supply, Operation and Maintenance of Super Sucker Machine on Hiring Basis for cleaning and Desilting of Box drain from Pattapola to Chhatrabazar Under Cuttack Municipal Corporation
Improvement and construction of slope protection work within RD 0.500km to RD 0.600km and desilting and strengthening to left bank within RD 0.00km to RD 4.00km of Saradaguda distributary.
Regular cleaning and desilting of Ground Water Tank, Settling Tank and pucca drain along the railway track of Kanika railway siding under GOCP of Basundhara Area (For 02 years)
Repair of VRB at RD 48.867Km of GMC and RD 3.107Km of Kutmanpalli S/M-II, desilting and strengtheing from RD 48.010Km to RD 49.780Km of Gompakonda Main Canal.
M/R to desilting of Mahanadi Canal from RD 00 to 2.20 Km and RD 5.30 Km to 7.20 Km including Benipalli Sub-minor for the year 2025-26.
Construction of slope protection work within RD 26.500km to RD 26.560km at CD point and desilting and strengthening to left bank within RD 20.00km to RD 27.00km of LMC.
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL
DESILTING OF CANAL