Loading…
Loading…
11,295 results • Best match
Consultancy services for preparation of Detailed Project Report, Cost and Time Estimates and Tender Documents and drawings for construction of axial roads (Roads leading from locations inside Indian Territory to border security Fence) along Indo-Pak Border under Gurdaspur and Amritsar Sector in the State of Punjab (Total Length 86.773 Kms) (SH: Complete work related to land acquisition such as survey, demarcation on ground, preparation of draft notifications and verifying them to revenue department etc balance work) Package-II (a)
S/R to road from Pokhariput level crossing to Khandagiri via Gandamunda(portion from Gandamunda chhak to Jagamara Siripur master plan road)BBSR for the year 2023-24(Ch.0/00 km to 0/365 km RHS)for laying of pipeline by WATCO(From Prameya chhak to ITER
ERECTION, TESTING AND COMMISSIONING OF 33/11KV INDOOR SUB STATIONWITH 2X8 MVA PTRs ALONG WITH CONSTRUCTION OF CONTROL ROOM, CABLE TRENCHES, POWER TRANSFOMER PLINTHS, TOILET BLOCK, ELECTRIFICATION, SANITARY AND WATER SUPPLY ARRANGEMENTS AT LB COLLEGE, ... TO MASTER PLAN CIRCLE
National Competitive Bidding (NCB) for Construction of 17 STPs along River Musi and on Kukatpally Nala Catchment (Hussainsagar Lake Catchment - Decentralized) under Sewerage Improvement Project of Sewerage Master Plan of Hyderabad Urban Agglomeration area under Hybrid Annuity Mode of contract including MOM of the plants for 15years period
Shifting of 33KV&11KV Lines, DTRs & Erection of 11KV RMUs at Stretch -IA: NeoPolis Circle to ORR Service Road for Integrated Development of Kokapet Layout including construction of Trumpet and interchange at Narsingi (V) of Ibrahimbagh Division of ... in Master Plan /Rangareddy ...
SHIFTING OF 33KV&11KV LINES, DTRS & ERECTION OF 11KV RMUS AT STRETCH -I: SHANKARPALLY ROAD TO NEO-POLIS CIRCLE FOR INTEGRATED DEVELOPMENT OF KOKAPET LAYOUT INCLUDING CONSTRUCTION OF TRUMPET AND INTERCHANGE AT NARSINGI (V) OF IBRAHIMBAGH DIVISION OF ... IN MASTER PLAN /RANGAREDDY ...
ERECTION OF 33 KV INTERLINKING LINE(i.e., 4.66 KM DCOH 100 SQMM +3 KM UG CABLE) FROM 33/11 KV GAGANPAHAD SS TO 33/11 KV SHAMSHABAD SS IN OPERATION DIVISION RAJENDRANAGAR OF RAJENDRANAGAR CIRCLE IN MASTER PLAN ECGH DIVISION OF RR CIRCLE- UNDER T&D IMPROVEMENT WORKS
Conversion of 33kV OH line to UG Cable for 33kV Jubileehills Asifnagar Ckt I and II DCOH line which is passing over the consumers houses from Syed Nagar II to Ahmed Nagar under T and D improvement works in SD VI of Division I in Master Plan Circle, Hyderabad
Erection of new 1 No. new 33/11kV outdoor Sub-Station 1x12.5 MVA PTR and with connected 33kV, 3 No. 11kV feeders at Bairagiguda, Himayathsagar (M) in Rajendra nagar sub-division of Rajendranagar division in Rajendranagar circle in ECGH Division ... Division Master plan , ...
Name of work Completed schemes under NA II Hort. zone. Do Land Ph. IV V Rohini. Central Verge and RSP, Sec 28, Rohini 30 mtr road SH Co Full RW of master plan road in Rohini Ph. IV V 80 Mtr, and 45 mtr and 30 Mtr RW.
Construction of IIT Kharagpur Research Park, New Town, Rajarhat. SH: Additional 94 nos. car parking (83 nos. general car 6 nos. VIP car and 5 nos. Bus/Ambulance) space in line with approved master plan. The parking will be open to sky during the year 2023-24. (Balance work)
Preparation of Detailed Project Reports for Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functional Household Tap Connections of various villages of Block Bajna District Ratlam including survey and investigation
Preparation of Detailed Project Reports for Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functional Household Tap Connections of various villages of Block Ratlam District Ratlam including survey And investigatio
Preparation of Detailed Project Reports for Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functional Household Tap Connections of various villages of Block Sailana District Ratlam including survey And investigati
Preparation of Detailed Project Reports for Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functional Household Tap Connections of various villages of Block Piploda District Ratlam including survey and investigati
Preparation of Detailed Project Reports for Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functional Household Tap Connections of various villages of Block Jaora District Ratlam including survey And investigation
(SH Preparation of Detailed Project Report for Providing Flood Protection work to save the cultivated lands Abadies of village Kangar (Mohalla Khatta) Baba Naina Ji in tehsil haroli Distt. Una (HP)
Preparation of Detailed Project Report Supervision including technical vetting from competent authority for Construction of High Drain from Bagdahar Moor to Digha outfall at Bahadurpur G.P under Murshidabad Jiaganj Development Block.
Detailed project report for providing sewerage facilities in village Aurangabad, District Palwal (under Mahagram yojna) Aurangabad Providing Sewerage facilities in Distt. Palwal (Under NABARD). Construction of interceptic Chamber under NABARD in
Carrying out Falling Weight Deflectometer (FWD) test and other necessary field works and calculations for preparation of............ comprehensive Detailed Project Report for the work of strengthening of Asansol-Barakar G.T. Road
Consultancy Services for Preparation of Detailed Project Report for Slope Protection work of section of Km. 25.60 to Km 26.1 (Bagrakot -Kafer) of NH-717A in the state of West Bengal
Preparation of Detailed Project Report and allied works for Widening and Strengthening of Raghunathpur Santuri Road from 0.00 km to 23.40 km under Purulia Division PWD during the year 2025-26
Empanelment of Project Management Consultancy for Preparation of Detailed Project Report, Estimates, Design and Supervision for Road, Buildings, Bridges, Garden, Landscape, Electrical Works and Other Development Works for Kalwan Nagarpanchayat Kalwan
Preparation of detailed project report including field survey, related studies, estimation, detailed structural design including detailed drawings of all components and getting the same approved from competent authority of the department
Preparation of detailed project report for Taldangra Panchmura Chowbeta Road from CH 0.00 km to CH 10.00 km, strengthening work by overlaying under Bankura Highway Division in the district of Bankura.
Detailed Project Report for the work of Maintanance of Potholes of the Panaiyur to Athipakkam road Joint CC road In Panaiyur Panchayat Tiruvannamalai Block under Rural Road Maintenance Scheme 2025-26
SH- Prepration of Detailed Project Report Axle load Survey Traffic Survey by Automatic Traffic Counter and Classifier (ATCC), Falling weight Deflectometer test using FWD Equipment and CBR test) (Under OTMNP Head)
Consultancy services for Preliminary and Detailed Engineering including preparation of Detailed Project Report for road projects at different locations on the State Road Network for an approximate length of 400.00 km
Conducting Topographical GIS survey, Preparation of Detailed Project report with designs & drawings and Conducting door to door survey of Households in Tiptur city for Providing Water Supply System to Tiptur City.
Preparation of Detailed Project Report for improvement of Barasat - Basirhat road (SH2) from 8.500 km to 20.000 kmp under Barasat Division PWD in the district of North 24 Parganas, West Bengal.
Execution of project related to making of Auroville city as per the charter & Gazetted master plan and the original vision. SH: Providing manpower on temporary basis in th O/o EE&SM(E), PPED, CPWD, Puducherry for a period of Twelve (12) Months. Subwork/Packages: Providing manpower on temporary basis in the O/o EE&SM(E).
Conducting Reconnaissance and detailed survey at the project site taking L/s, C/s of river/ stream/ halla at 100m intervals both on upstream and downstream side of the site, for a distance of 500m. The index map showing the location of project site ... finalized DPR in ...
Carrying out survey, feasibility study layout and preparation of GADs collecting relevant data Geotechnical investigation and detailed designing working drawings detailed estimates with BOQ for Construction of causeway in creek of River Tangri
Entry and Mid Level Desktop Computer (Q2), Multimedia Projector (MMP) (Q2), Professional Large Format Display (Q2)
Multifunction Machine MFM (V2) (Q2) ( PAC Only )
Hiring of Consultants - Milestone/Deliverable Based - Consultancy services for Revamping of Jetties at GRSE and RBD Unit; DPR, RFP Preparation & Bid Process Management; No; Hybrid(As specified in scope of work)
CONSTRUCTION OF NEW MUSEUM BUILDING IN MASTER PLAN COMPLEX AT VIRUDHUNAGAR IN VIRUDHUNAGAR DISTRICT
Providing Road Safety Park in the Master Plan Complex at Tiruvallur in Tiruvallur District
Construction of Pilgrim Resting Centre in Master Plan Complex at Tiruvallur in Tiruvallur District
Execution of Project related to Making Auroville City as per the Chartered & Gazetted Master Plan and the Original Vision. SH: Providing Manpower Services (CAD Assistant) for Chief Architect office, Chennai for 3 nos in a period of Six(6) Months. Subwork/Packages: Providing Manpower services (CAD Assistant) for Chief Architect Office, Chennai for 3 nos in a period of Six(06) Months.
M o various colonies under Nazul Account II Dwarka Zone
Custom Bid for Services - Hiring of Consultancy services for preperation of DPR to Construct Army Goodwill School at Paddar, Kishtwar (J&K) Similar Category Hiring of Consultancy Services - Percentage based
Providing of 3rd alternate source to 33/11KV Golconda SS by laying of 5.25KM of 3X400Sqmm. XLPE UG Cable (Triple Run) from 132/33KV Manikonda EHT SS to the 33/11KV Golconda SS viz., 2run for providing of 3rd alternate source to 33/11KV Golconda SS ... the Master plan SD-VI ... Hyderabad Master plan Circle ...
Quotation to obtain the NonbSchedule Rates for 1 Day in South Bengal Districts to prepare The MELA DPR during the financial year 2026n27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Investigation Works, Analysis, Design And DPR Preparation for Puthoor Kadavu Bridge ( 90 Meter Length, 4 Spans, 8.4 Meter Wide) across Manimala River on Plackapady Vellavoor Niranani Ollamana Road In Kangazha And Vellavoor Grama Panchayats ,
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; PREPARATION OF DETAILED FEASIBILITY REPORT (DFR) FOR SETTING UP 300 MTPD PHOSPHORIC ACID PLANT AT RCF THAL; Buyer
Consultancy Services for the Preparation of Detailed Project Report for interception and diversion of sewer networks alongwith renovation of existing sewage treatment plants and lifting stations etc. and tapping of all drains.....
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design including Conducting Falling Weight Deflectometer Test and Analysis for Overlay Design and with necessary Estimate
Detailed survey and preparation of detailed project report for the work of Tufanganj Balabhut road from 0.00kmp to 12.00kmp widening and strengthening work under Coochbehar Highway Division, In The District Of Coochbehar .
Consultancy services for preparation of Detailed project Report, Falling Weight Deflectometer Test, Axle load survey , Conducting traffic census and Soil investigation test, in connection with Widening and Strengthening of Amta Rajapur Dihibhurs