Loading…
Loading…
11,295 results • Best match
CONSTRUCTION OF CEMENT CONCRETE ROAD ALONG GIRDHAR PARSAR TO QUALITY PARADISE MASTER PLAN KOLAR ROAD (RIGHT) BHOPAL
CONSTRUCTION OF CEMENT CONCRETE ROAD ALONG GIRDHAR PARSAR TO QUALITY PARADISE MASTER PLAN KOLAR ROAD (LEFT) BHOPAL
CONSTRUCTION OF DISTRICT TOWN AND COUNTRY PLANNING OFFICE IN MASTER PLAN COMPLEX AT TIRUVANNAMALAI IN TIRUVANNAMALAI DISTRICT.
Construction of District Town and Country Planning Office in Master Plan Complex at Tiruvallur in Tiruvallur District
Construction of New Collectorate and Other Office Buildings in Master Plan Complex at Veeracholapuram in Kallakurichi District.
Dense carpeting of master plan road sector -C(C5,C6 and C7,C8 and C9) Vasant Kunj.
Repair Of potholes, rough patches and other misc. work at master plan road sector c, Vasant kunj.
Construction of New design fence and road from BP No. 995/8-S to BP No. 996/3-1S (GIN 332) (Length-2.7 Kms) in AOR of BOP Madhyabalabhut of 14 Bn BSF in District CoochBehar, West Bengal along Indo-Bangladesh Border (IBB). SH: Construction of new ... technical feasibility report for ... technical feasibility report for ...
Preparation of Detail Project Report (DPR) for Property Development including market analysis, transactional advice, land use report and Tender Documents for integrated land Parcels at Metro station entry/exit in Corridor-3 and 5, CMRL Phase-2.
Whole Genome Sequencing of Duck
Construction of 45.00 mtr. span bridge over Jogar Khud (double lane) existing in Renuka Dam Project (double lane) existing in Renuka Dam project. (Including Preparation of Hydraulic data and Design)
AMRUT-2.0, guidelines of PHED, Haryana, issued by MoHUA for the towns Panipat, Karnal, Assandh, Gharaunda, Indri , Nilokheri, Nissing, Samalkha and Taraori in state of Haryana
Construction of 45.00 mtr. span bridge over Jogar Khud (double lane) existing in Renuka Dam Project (double lane) existing in Renuka Dam project. (Geological Investigation)
(S.H Preparation of Project report for A/A and E/S, including field survey related study, estimation including topographical survey site plan, L-section, etc. by outsourcing including drawing of all civil structure and hydraulic design.) Under Nabard
Conducting detailed survey at the project site as per Conditions in Bid Document and Directions of Engineer Incharge, Preparation of Detailed Estimates as per approved designs, Supplying Required number of DPRs/DTS for placing before TAC/TSC and attending to the observations of TAC/TSC, till it accords clearance to the Project and supplying the finalized DPRs/DTS in Required numbers to accord administrative approval and technical sanction etc, complete as per the directions of Engineer in charge.
as per NIT
malvahini takne.
NIT-02/2026-27 S.NO. 15
Construction of IIT Kharagpur Research Park, New Town, Rajarhat. SH: Additional 94nos. car parking (83 nos. general car 6 nos. VIP car and 5 nos. Bus/Ambulance) space in line with approved master plan. The parking will be open the sky except the 6 ... approved master plan . ...
Geotechnical and Material Investigation for Preparation of Detailed Project Report for i) Phagwara-Hoshiarpur Road including Phagwara Bypass, ii) Bhiwani- Hansi Road and iii) Kalesar-Poanta Saheb Road in the State of Punjab, Haryana and HP
DETAILED PROJECT REPORT FOR PROVIDING OUTFALL SEWER AND SEWERAGE NETWORK, SEWAGE TREATMENT PLANT FOR HARI NAGAR, POLICE LINE, PIPLI, VASHISHT COLONY, MOHAN NAGAR, KAILASH NAGAR, SUNDERPUR AND VILLAGE KHERI MARKANDA ETC. IN THANESAR TOWN DISTT. KURUKS
Preparation of Detailed Project Report along with Topographical Survey Soil Investigation Traffic Survey and Axle Load Survey etc related to the work Hatigeria Kultikri Rohini Rogra Road 0.00 Kmp to 25.427 Kmp Strengthening under Jhargram Highw
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design and with necessary Estimate for upcoming project work of Kakina Road, From 0.00 km to 8.75 km,W/S
Preparation of Detailed Project Report for Proposed Sub Surface Water Based Pirra Bakra Pipe Water Supply Scheme under Bankura Division, Block Khatra, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division
Appointment of Project Management Consultant for Preparation of Detailed Project Report, Submission to Government, Technical Assistance in Getting Approvals and for supervision on the approved project under GoI/ GoM Funded Schemes for the Work of Und
Preparation of Detailed Project Report along with Topographical Survey Soil Investigation Traffic Survey and Axle Load Survey etc related to the work Jhargram Sevayatan Baita Dheruaghat Road 0.00 Km to 12.00 Kmp Widening and Strengthening under
DETAILED PROJECT REPORT FOR PROVIDING OUTFALL SEWER AND SEWERAGE NETWORK, SEWAGE TREATMENT PLANT FOR HARI NAGAR, POLICE LINE, PIPLI, VASHISHT COLONY, MOHAN NAGAR, KAILASH NAGAR, SUNDERPUR AND VILLAGE KHERI MARKANDA ETC. IN THANESAR TOWN DISTT. KURUKS
SELECTION OF ARCHITECT/CONSULTANT FOR Preparation of Detailed Project Report and Tender Document of Operation and Maintenance For Plan of Action to Achieve 24x7 Water Supply in Datia City with Calculation of Water Budget in City.
R/W Pumping Station , R/W Rising Main lines, Exist. 1st. W/W Dhanana, C/W Rising main lines, Internal distribution and Acquisition of Land. DETAILED PROJECT REPORT FOR PROVIDING SEWERAGE FACILITY and SEWAGE TREATMENT PLANT
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design, axle load survey and with necessary Estimate for upcoming project work of Chilakhana-Natabari road, from 0.00km to 9.8
Preparation of Detailed Project Report for Proposed Ground Water Based Bansi Pipe Water Supply Scheme under Bankura Division, Block Sarenga, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division, P.H.E. D
DPR DE and Project Management and construction of coal transportation (Railway Siding) system including associated S and T and Electrical system for Talcher- III (2X660 MW)- As per Bidding Doc CS-4540-714C-9
Collection of data and Preparation of Alignment and Land Plan Schedule for the work of Construction of High Level Bridge at Km 0/8-1/4 of Marangiyur - Enathimangalam road across Koraiyar River
Request for Proposal for Total Hundred Percent Polluted Sewage Treatment Plant and Method in Municipal Council Area
Preparation of detail project report of comprehensive sewerage project as per latest GOR guidelines for bagru Town
Improvement Riding Quality, Road furniture and 2 nos double cell Box Culvert at 12th and 16th km of Buxa Forest Road.
Widening a part of Road and Surfacing Work, Cross drainage and development of shoulder of Cross Road at Alipurduar
Preparation of DPRs for Different works under DVVNL, Agra
Preparation of Feasibility Report and Providing Transaction Advisory Service for identifying Concessionaries for the entire Operation and Maintenance through Revenue Sharing model and conventional method for the Integrated Bus Terminal at Solar in Er
Quotation to obtain the Non Schedule Rates for 2 to 18 Day in South Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Quotation to obtain the Non Schedule Rates for 2 to 18 Day in North Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Quotation to obtain the Non Schedule Rates for 19 to 28 Day in South Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
FKM Tight Joint for DPR CHP BP1, FKM Tight Joint for DPR CHP BP2, FKM Tight Joint for DPR CHP BP3, FKM Tight Joint for DPR VIZAG BP, FKM Tight Joint for DPR VIJ BP
Providing architectural and engineering design services for Construction of New Office Building for Koothattukulam Municipality KIIFB Revision of the approved DPR for GRIHA certification and final approval
Notice Inviting Quotation to obtain Non Schedule Rates of 15 to 18 Days for Mursidabad District Level Mela, to prepare the DPR, during F.Y. 2026-27, 2027-28, 2028-29 and 2029-30 2nd Call
Technical Services for Preparation of GIS Layers, Maps, Geospatial Modelling Analysis for the Project DPR Preparation for Rejuvenation of Damodar and Subarnarekha and its major tributaries and distributaries through forestry intervention for Institute of Forest Productivity, Ranchi
RFQ-cum-RFP for appointment of General Consultant for Vetting of DPR, Bid Process Management PMC for Construction Implementation of Innovative Urban Transportation (Ropeways) Project in Shimla City on CEN Standa
Providing Consultancy Services for conversion of two Gas Turbine Units of Frame 6B model at BBGTPS, for utilizing R-LNG as fuel instead of Naphtha by preparing FR, DPR and TS.
CONSULTANCY SERVICE FOR PREPARATION OF CPR AND DPR INCLUDING ARCH AND STRUCTURAL DRAWINGS, MEP, COSTED SCHEDULE, TENDER DOCUMENTS FOR RE-LOCATION OF CAW AT AF STN HAKIMPET