Loading…
Loading…
418 results • Best match
Consultancy Services for Survey Investigation and preparation of Detailed project Report for Development of Model shelter in the space allotted in the Premises of King Koti Hospital Hyderabad Stilt + 4 floors
consultancy Services for survey, Investigation and preparation of Detailed project Report for construction of Storm Water Drain from Durgabhavaninagar colony to Reddy colony in limits of Champapet ward no.17, GHMC
Consultancy Services for Survey Investigation Preparation of Detailed Project Report for "Construction of night shelter for patients attendants in Sarojinidevi Eye Hospital (G+2), Hyderabad (Design structure for G+5 Floors)".
RFP for selection of consultant for preparation of Comprehensive Improvement Plans for Under Ground Drainage, Storm Water Drainage and Water Supply Systems, Rejuvenation of Water Bodies Design of Blue Green Infrastructure and detailed project report ... ( DPR ) ...
RELOCATION OF EXISTING 33/11 kV GOSHAMAHAL SUBSTATION AND OFFICE BUILDINGS OF BEGUMBAZAR DIVISION, BEGUM BAZAR SUB DIVISION, ICSC TROOP BAZAR PERTAINING TO HYDERABAD SOUTH CIRCLE UNDER DC WORKS IN MASTERPLAN HYDERABAD CIRCLE OF MASTERPLAN ZONE
Preperation of Detailed Project Reports for the roads Gundala to Komararam (via Settipally, Amarsingh thanda from0/0-32/0 in Gundala mandal and Bodu to Motlagudem (via) Oddugudem from 0/0 - 20/0 in Bhadradri Kothagudem District.
Erection of 33/11kV Outdoor SS with Necessary Equipment and connected lines along with construction of control room and at TNGOs Colony in Master Plan, SD-1 of WCGH Division in Master Plan RR Circle
Consultancy services for Detailed Project Report for 6 Laning of Pune Hyderabad Section of NH 65 from Km 493.0 to 524.0 from Sangareddy X roads to Madinaguda in the State of Telangana
Forming diversion road to Kalyanikhani Open cast mine of Kasipet-Manikpur road from Km.0/0 to 6/0in Mancherial.(Sub-work: Preparation of Detailed Project Report of Roads & Bridges) (2nd Call)
Providing of 3rd alternate source to 33/11KV MLA Colony Substation from 132/33KV NIMS (Erramanjil) EHT Substation in Master Plan I Division of Master Plan Circle/Hyderabad under T and D improvement works (Category General)
Construction of Double lane BT Road from R&B Road Murumuru Colony to R&B road vai Bizinapally Maithapuram Road from Km 0/0 to 10/0 in Jayashankar Bhupalpally District. Sub Work:- Preparation of Detailed Project Reports.
Consultancy Services for Survey investigation and preparation of detailed project report to address the water stagnation problem at Singareni colony duly diverting the runoff from Singareni colony to Chaitanypuri nala ( Musi River) GHMC
To engage consultant for preparation of DPR to provide Direct Connectivity from First Lancer road to chintalbasti across Banjara Hills Road No.1 for development of proposed Link road from Masab tank near Sarojini Devi eye Hospital to NH-65 at Khairatabad via First Lancer Road, Banjara Hills Road No.1 and Chintalbasti.
Laying of CC Roads From H/o Basheer to 50'-00" Master plan road at Azampura and Construction of Side Drain From Mahipal Petrol Bunk to 50'-00" Master plan road at W.no 9 in Medak Municipality
Improvement to 60 feet master plan road from Ramnagar Junction to Waddepally Church Junction, Hanamkonda (FDR)
Construction of RCC Cable Trench at upcoming 132/33 KV Seetharambagh Substation in Master Plan, Hyderabad
Consultancy for Preparation of Detailed Project Report and allied services for Mega Freight Maintenance Depot in Secunderabad Division, South Central Railway (Detailed Scope and payment schedule as per TOR) (Rate is including 18% GST)
Engaging Consultancy Services for assessment of existing condition and structural stability of all elements of existing bridges on Musi River and design of necessary repairs, rehabilitation and strengthening with necessary surveys, preparation of ... of Detailed Project Report (DPR) ... ( DPR ) ...
Erection of 4nos bays at 132/33KV Seetharambagh SS and Extension to 4No#s Feeders(Seetharambagh ,Kulsumpura , Mallepally & ENT feeders ) from132/33KV Seetharambagh SS in Master Plan Hyderabad Circle of Master Plan Zone under Power Evacuation Scheme works
Sub work for Preparation of DPR under main work Construction of Two Lane HLB across Manjeera River in between Andole, Jogipet and Ajjamarri Village limit at Km 3/0 to 3/4 and formation of Approach road on either side from Km 0/0 to 5/4 of Andole to Ajjamarri Road in Sangareddy District
Karne Thanda Lift Irrigation Scheme - Conducting detailed Survey investigation and preparation of DPR for Karne Thanda Lift Irrigation Scheme on Ghanpur branch canal to feed minor irrigation tanks in tribal area under part of Ghanpur and Peddamandadi Mandals of Wanparthy District for an ayacut of 4000 acres under Mahatma Gandhi Kalwakurthy lift irrigation scheme
Laying of 33KV single run UG cable for interlinking of 33/11KV Alluri Seetharamraju Sub-station 33/11KV Gudimalkapur Sub-station in Master Plan I Division of Master Plan Circle/Hyderabad under T and D improvement works (Category General)
Construction of Four lane road from Siddipet Ellanthakunta Mandal Headquarters from km 0/0 to 22/0 on Siddipet Kistapur road in Siddipet District Sub work Preperation of DPR (i) Topographival survey at 20 Mts cross section interval covering minimum ... ( Preparation of DPR -with ...
Custom Bid for Services - Digital Master plan of DRDO Township Kanchanbagh Similar Category GIS related Survey Services
Construction of High Level Bridge across Manair River at Km1802 of Gundlapally Pottur road and Km 202 of Bavupet Khazipur road in Karimnagar District Subwork Consultancy Services for Preparation of Detailed Project Report for the work
Preparation of Detailed Project Report for Development of Interchange Connecting Radial Road with Outer Ring Road (at Km 143.000) along with Integrating it with Budwell Interchange and Improvement of Entry/Exit of Rajinder Nagar Mandal Road
Consultancy Services for Survey Investigation Preparation of Detailed Project Report for Construction of shelters for patients and their attendants and public toilets in Govt., general & chest hospital, (G+2), Hyderabad (Design structure for G+5 Floors).
ERECTION OF 33/11KV INDOOR SS WITH 2NOS 8MVA PTRS ALONG WITH CONSTRUCTION OF CONTROL ROOM, COMPOUND WALL ALONG WITH MS GATE AND BORE WELL, CABLE TRENCHES, POWER TRANSFORMER PLINTHS, TOILET BLOCK, ELECTRIFICATION, SANITARY AND WATER SUPPLY ... OF MASTER PLAN CIRCLE, ... OF MASTERPLAN ZONE ...
33kV Bay extension work at 132/33kV Khaitalapur outdoor EHT SS for the already sanctioned work of providing of 2nd alternate source to 33/11kV Borabanda SS from 132/33kV Khaitalapur SS in Banjarahills Division of Banjarahills Circle and work executed ... the Master plan SD-IV ... Hyderabad Master plan Circle ... T&D Master Plan Zone.
Erection 2 no. 33kV bay extensions at 132/33kV Donthanpally EHT SS for the already sanctioned work of providing of 33kV dedicated source to 33/11kV CBIT SS from 132/33kV Donthanpally SS in Ibrahimbagh Division of Cybercity Circle and work being ... the Master plan SubDivision ... Rangareddy Master plan Circle ... D Master Plan Zone
33KV Bay extension work at 220/33KV Nagole outdoor EHT SS for the already sanctioned work of providing of 33KV Main source to 33/11KV Uppal Bagayath Phase II (Shilapramam) SS from 220/33KV Nagole SS in Habsiguda Divison of Habsiguda Circle and work ... the Master plan Sub-Division ... Rangareddy Master plan Circle ... D Master Plan Zone
Preparation of DPR-(i)Topographical survey at 20m cross section interval covering minimum 30m corridor (ii)Soil investigation of pavement and structures (iii)Geometric design of road (iv)preparation of pan & profile drawings & (v)Cost estimates for the work of Improvements to Gajwel to Rajivrahadari PWD via Mutrajpally from km 0/0 to 7/2 in siddipet district
Preparation of DPR (i) Topographical survey at 20m cross section interval covering minimum 30m corridor (ii)Soil investigation for pavement and structures (iii)Geometric Design of road (iv)Preparation of plan & profile drawings& (v)Cost estimates for the work of Improvements to Markook to Narayanpur road from km 0/0 to 10/0 in siddipet District
Preparation of DPR (i)Topographical suurvey at 20m cross section interval covering minimum 30m corridor (ii) soil investigation for pavement and structures (iii)Geometric design of road (iv)Preparation of plan & profile drawings & (v)cost estimates for the work of Improvements toPWD road to Koluguru via Ahmadipur from km 0/0 to 4/0 in siddipet distrcit
Preperation of Detailed Project Reports for the roads Bathenapalli to Dokupadu upto CG border from 0/0- 10/0, Bathinapally to Thippapuram from Km. 0/0-5/0 and Punugudu Chelaka to Sampathnagar from Km.0/0-25/0 in Bhadradri Kothagudem District.
Preperation of Detailed Project Reports for the roads Muthyalampadu X road to Cheemalapadu (via) Thadikalapudi from Km.0/0 -18/0 and Bethampudi to Lekhyathanda (via)Abbireddygudem, Maddiralathanda, Bhadruthanda, Thummalachelaka and Petranchilaka from Km.0/0- 25/0 in Bhadradri Kothagudem District.
Construction of BT Roads , Additional proposals of roads/ bridges in LWE affected areas under RCPLWEA Scheme ( 2019-20) of (R&B) Division, Mancherial Priority road Sl.No.1,3,7,12,13 &14(Six Roads 25.50 Kms ) in Mancherial District Sub Work : ... of Detailed Project Reports
Construction of BT Roads , Additional proposals of roads/ bridges in LWE affected areas under RCPLWEA Scheme ( 2019-20) of (R&B) Division, Mancherial Priority road Sl.No.4,5,10 & 11 ( Four Roads 22.10 Kms ) in Mancherial District Sub Work : ... of Detailed Project Reports
Preparation of Master Plan, detailed plans and estimates at Sri Laxmi Narasimha Swamy Devasthanam, Dharmapuri Town, Jagitial District
Erection of 33/11kV Indoor SS with 2Nos 8MVA PTRs and Connected 33kV, 11kV Lines at NAC (National Academy of Construction), Phool Bagh, Chandrayangutta in Operation Hyderabad South Circle in Master Plan SD-III of Division-II in Master Plan Hyderabad Circle
PREPARATION OF DETAILED PROJECT REPORT INCLUDING DETAILED ENGINEERING AND GETTING APPROVAL FROM I & CAD TELANGANA STATE FOR THE PROPOSED 2ND DIVERSION OF VATTIVAGU INCLUDING STRUCTURES NEAR KHAIRAGURA OCP BELLAMPALLI AREA GOLETI REBBANA MANDAL KUMRAMBHEEM ASIFABAD DISTRICT TELANGANA STATE
Construction of BT roads, Additional proposals of Roads/Bridges in LWE affected areas under RCPLWE-priority (2&3) Roads Sl.No.73,74,75,76,77,78 & 79 (Seven roads, 27.50 Kms) in Mancherial District (Sub-Work: Preparation of Detailed Project Report) (3rd call)
Consuktancy Services for preparation of Detailed Project Report for Up gradation to 2 lane with paved shoulders Configuration from Km 2/0 to 48/0 of NH-563 on Jagtial-Karimnagar-Warangal road in the State of Telangana
Construction of BT roads, Additional proposals of Roads/Bridges in LWE affected areas under RCPLWE-priority (1) Roads Sl.No.66,67,68,69,70, 71&72 (Seven roads, 36.00 Kms) in Mancherial District (Sub-Work: Preparation of Detailed Project Report) (3rd call)
Consultancy Services for Formulation of GIS based Master Plan in 10 AMRUT ULBs - Package-I (Adilabad, Ramagundam, Karimnagar (UDA))
Improvements to the Rotary Junction at Nanakramguda including merging of proposed GHMC CDA Master Plan road and RDP Road
Widening Master Plan Road,Dividers and Erecting Central Lighting from Registration Office to TNGO's Colony in Khammam Municipal Coporation
Rehabilitation, strengthening and improvement of sewer network in Zone-II as per Comprehensive Sewerage Master Plan covering Chandrayangutta Constituency.
Shifting of 33KV&11KV Lines, DTRs at Stretch -III: Trumpet Right Side for Integrated Development of Kokapet Layout including construction of Trumpet and interchange at Narsingi (V) of Ibrahimbagh Division of ECGH Division in Master Plan/Rangareddy ... of Master Plan Zone ...
Shifting of 11KV Lines, DTRs at Stretch -VI: Road No 5 & 7 for Integrated Development of Kokapet Layout including construction of Trumpet and interchange at Narsingi (V)of Ibrahimbagh Division of ECGH Division in Master Plan/Rangareddy Circle of ... of Master Plan Zone ...