Loading…
Loading…
1,350 results • Best match
Preparation of Detailed Project Report including Survey, Soil, Design etc. for Construction of Modern Integrated Soula-2 Fish Landing Centre at Soula, Ramnagar-II Dev Block, Dist.-Purba Medinipur
Consultancy services for carrying out necessary investigation including Topographical Survey, Traffic study, Condition assessment by NSV and pavement evaluation by FWD in connection with preparation of Detailed Project Report
Consultancy services for preparation of Detailed Project Report for Haripal_ Bhandarhati_ Dhaniakhali Road from 0.00 km to 16.10 km for the work of strengthening in the district of Hooghly
Preparation of Detailed Project Report with all necessary Survey_Kanki Goagaon Road from 10.00 km to 27.40 km Widening from intermediate lane to double lane carriageway road and Strengthening Work
Construction of modified Construction of modified community leach pit at IMIS village Bahadurpur convergence with SMB fund and 15th FC fund Addl DPR Ph 2
Preparation of Detail Project Report DPR for providing different facilities at Memari Dak Inspection Bungalow Complex of Zilla Parishad at Memari , Purba Bardhaman
Construction of IIT Kharagpur Research Park, New Town, Rajarhat. SH: Additional 94nos. car parking (83 nos. general car 6 nos. VIP car and 5 nos. Bus/Ambulance) space in line with approved master plan. The parking will be open to sky during the year ... approved master plan . ...
Preparation of Revised DPR after investigation for Lankapara Cha Sundori Piped Water Supply Scheme under Madarihat-Birpara Block, Alipurduar Division, PHE Dte.
Preparation of Detailed Project Report for Rectification of 18 nos. Black Spot on NH-512 for long term permanent measures in the District of Malda and Dakshin Dinajpur, West Bengal
Preparation of detailed project report for Simlapal Khatra Road from CH 0.00 km to CH 26.24 km, Strengthening work, by overlaying under Bankura Highway Division in the district of Bankura.
Preparation of detailed project report for Saltora Mejia Road from CH 0.00 km to CH 19.16 km, strengthening work by overlaying under Bankura Highway Division in the district of Bankura.
Construction of modified community leach pit at IMIS village Krishna Chandrapur convergence with SMB fund and 15th FC fund Addl DPR PH 2
Preparation of New DPR after investigation for Paschim Jitpur Zone -II Piped Water Supply Scheme under Alipurduar-I Block, Alipurduar Division, PHE Dte.
Preparation of New DPR after investigation for Paschim Jitpur Zone-I Piped Water Supply Scheme under Alipurduar-I Block, Alipurduar Division, PHE Dte.
Construction of IIT Kharagpur Research Park, New Town, Rajarhat. SH: Additional 94 nos. car parking (83 nos. general car 6 nos. VIP car and 5 nos. Bus/Ambulance) space in line with approved master plan. The parking will be open to sky during the year 2023-24. (Balance work)
Preparation of Detailed Project Report Supervision including technical vetting from competent authority for Construction of High Drain from Bagdahar Moor to Digha outfall at Bahadurpur G.P under Murshidabad Jiaganj Development Block.
Carrying out Falling Weight Deflectometer (FWD) test and other necessary field works and calculations for preparation of............ comprehensive Detailed Project Report for the work of strengthening of Asansol-Barakar G.T. Road
Consultancy Services for Preparation of Detailed Project Report for Slope Protection work of section of Km. 25.60 to Km 26.1 (Bagrakot -Kafer) of NH-717A in the state of West Bengal
Preparation of Detailed Project Report and allied works for Widening and Strengthening of Raghunathpur Santuri Road from 0.00 km to 23.40 km under Purulia Division PWD during the year 2025-26
Preparation of detailed project report for Taldangra Panchmura Chowbeta Road from CH 0.00 km to CH 10.00 km, strengthening work by overlaying under Bankura Highway Division in the district of Bankura.
Preparation of Detailed Project Report for improvement of Barasat - Basirhat road (SH2) from 8.500 km to 20.000 kmp under Barasat Division PWD in the district of North 24 Parganas, West Bengal.
Hiring of Consultants - Milestone/Deliverable Based - Consultancy services for Revamping of Jetties at GRSE and RBD Unit; DPR, RFP Preparation & Bid Process Management; No; Hybrid(As specified in scope of work)
Quotation to obtain the NonbSchedule Rates for 1 Day in South Bengal Districts to prepare The MELA DPR during the financial year 2026n27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Consultancy Services for the Preparation of Detailed Project Report for interception and diversion of sewer networks alongwith renovation of existing sewage treatment plants and lifting stations etc. and tapping of all drains.....
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design including Conducting Falling Weight Deflectometer Test and Analysis for Overlay Design and with necessary Estimate
Detailed survey and preparation of detailed project report for the work of Tufanganj Balabhut road from 0.00kmp to 12.00kmp widening and strengthening work under Coochbehar Highway Division, In The District Of Coochbehar .
Consultancy services for preparation of Detailed project Report, Falling Weight Deflectometer Test, Axle load survey , Conducting traffic census and Soil investigation test, in connection with Widening and Strengthening of Amta Rajapur Dihibhurs
Consultancy service for preparation of detailed project report for Gazitala Bazar road from 0.00 kmp to 3.557 kmp (average width 3.00 mtr.) for the strengthening work in district of North 24 Parganas.
Preparation of Detailed Project Report and allied works for Widening and Strengthening of Raghunathpur Chandankeary Chas Road from 0.00 km to 28.30 km under Purulia Division PWD during the year 2025-26
Preparation of Detailed Project Report Supervision including technical vetting from competent authority for Construction of High Drain from Truck Syndicate to Manaranjan Choudhury house at Ward No 03 under Jiaganj Azimganj Municipality.
Consultancy service for preparation of detailed project report for Basirhat-Itindaghat Road from 2.00 kmp to 2.30 kmp and 2.60 kmp to 6.60 kmp strengthening work in district of North 24 Parganas.
Refer to NIQ
Implementation of Arambagh Master Plan Phase II Re-excavation of Arora Khal for 11.65 Km
Preparation of Detailed Project Report including technical vetting from competent authority for Renovation and Upgradation of Bhagawan Mahavir 25th Centenary Building, Nahar Public Cultural Hall at Ward No - 17 under Jiaganj - Azimganj Municipali
Detailed survey and preparation of detailed project report for Tufanganj Dhalpal Bhatibari Road , From 9.50 Km To 15.64 Km, for widening and Strengthening Work, Under Coochbehar Highway Division, In The District Of Coochbehar
Preparation of Detailed Project Report and allied works for Widening and Strengthening of Kashipur Gourangdihi ghat Rangamati Road from 0.00 km to 20.30 km under Purulia Division PWD during the year 2025-26
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design and with necessary Estimate for upcoming project work of Dewanhat-Balarampur road, from 0.00km to 9.30km
Consultancy Services for condition survey and Preparation of Detailed Project Report with estimation and preparation of working drawing for Restoration of Lepcha Forts at Dalim under Kalimpong Division, PWD during the year 2025_2026
Implementation of grey water management at Different place at Parkula IMIS Village (DPR-5C) of Bilkumari GP. Under Nakashipara dev. Block in the Distict Nadia.
Civil structural works required for operation and storage purposes as per DPR of Radial Forging Plant along with upstream and downstream facilities at MSF, Ishapore.
Implementation of grey water management at Different place at Parkula IMIS Village (DPR-5B) of Bilkumari GP. Under Nakashipara dev. Block in the Distict Nadia.
Implementation of grey water management at Different place at Parkula IMIS Village (DPR-5A) of Bilkumari GP. Under Nakashipara dev. Block in the Distict Nadia.
Preparation of detailed DPR booklets in connection to Augmentation of Rangamati TG (Zone-I and II) PWSS under Kalchini Block under Alipurduar Division, PHE Dte.
Supply Fitting and Fixing of HDPE Pipe for Collecting Household Grey Water To Drain for all IMIS Village (SBM DPR) at Rangit-II Gram Panchayat
Feasibility study for assessment of need for drinking water within the covered area of Jaypur, Kotulpur, Patrasayer, Sarenga, Simlapal, Sonamukhi, Onda, Bishnupur, Hirbandh, Khatra and Ranibundh Blocks under piped water supply scheme for that blocks.
Quotation to obtain the Non Schedule Rates for 1 Day in North Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
CONSTRUCTION NEW DRAIN WITH MASTERPLAN AND DRAINAGE SYSTEM MITHAPUKUR BHANGA MASJID AREA. APAS/01/260/115/0005
Refer to BOQ
Detailed survey and preparation of detailed project report for the work of Chotomahadev village road from 0.00kmp to 6.00kmp strengthening work under Coochbehar Highway Division, In The District Of Coochbehar including preparation of PPT
Consultancy services for Preperation of Detailed project Report in all respect including quantity cost estimate of Bridge along with its Approaches at Hanarbari over Hobgar Canal in Mouza Kalinagar Paschim Raghunathpur , GP Shahjadapur Gordewni