Loading…
Loading…
1,350 results • Best match
Preparation of Detailed Project Report for Proposed ground water based ICHHARIA pipe water supply scheme, under Block Sonamukhi, District Bankura under Jal Jeevan Mission Program under Bishnupur Sub-Division of Bankura Division, P.H.E. Dte.
Preparation of Detailed Project Report including Survey work, Soil testing, Design etc. for Construction of Modern Integrated Tamliporia Fish Landing Centre at Vill-Purba Mukundapur,P.O.- Jhaugoria, P.S.-Digha Mohana Coastal, Dist.-Purba Medinipur
Consultancy services for Preperation of Detailed project Report in all respect including quantity cost estimate of Bridge along with its Approaches at Karabeg over Hobgar Canal in Mouza Chaltaberia ,GP Chaltaberia and Rajapur Karabeg
Preparation of Detailed Project Report for Proposed ground water based Dwarika pipe water supply scheme, under Bankura Division Block Bishnupur, District Bankura under Jal Jeevan Mission Program under Bishnupur Sub-Division of Bankura Division,
Preparation of Detailed Project Report along with Architectural design for renovation of State Guest House (Indira Bhawan), Sec-III, Salt Lake under Salt lake Reclamation Division of S.L.R.D.C, Department of U D M A
Preparation of Detailed Project Report for Proposed ground water based KATUL pipe water supply scheme, under Bankura Division, Block Bishnupur, District Bankura under Jal Jeevan Mission Program under Bishnupur Sub-Division of Bankura Division,
Design and Drawing along with Vetting from competent Authority as per nature of work for Preparation of Detailed Project Report in all respect for the following schemes under AMRUT 2.0 project within Mathabhanga Municipality
Consultancy Services for condition survey and Preparation of Detailed Project Report with estimation and preparation of working drawing for Restoration and Preservation of Damsang Lepcha Fort situated in Sakyong Village under Pedong Block, Kalimpong.
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Belpahari-Banspahari Road from 12.00 KMP to 23.80 Km, Widening and Strengthening
Preparation of Detailed Project Report along with Topographical Survey, Soil Investigation, Traffic Survey and Axle Load Survey etc related to the work Gopiballavpur-Nayagram Road (SH-9) 35.00 Kmp to 41.60 Km Strengthening work
EXCAVATION OF TRIAL TRENCHES FOR FEASIBILITY STUDY TO LAY U.G. CABLE DUCT ALONG CIT ROAD FROM BELIAGHATA MAIN ROAD TO PEERLESS PEDESTRAIN OVER BRIDGE AT ULTADANGA MAIN ROAD IN WARD NO-30,31,32,33,34,35 AND RESTORATION THE SAME.
Planning, Designing and Estimation of COMPREHENSIVE DRAINAGE MASTER PLAN AND DETAIL PROJECT REPORT FOR SILIGURI CITY
Consultancy for Preparation of Master Plan for Comprehensive Storm Water Drainage Scheme of Howrah Municipal Corporation
Construction of Community Based Modified Leachpit with Silt chember for manage Gray Water at Shantipur Madrasha at Shantipur, under SBM and 15th FC Fund (4th DPR)
Custom Bid for Services - Repair of Hand Held Communication set (Vertel DPR 5000) Similar Category Annual Maintenance Service( Hardware Security Module) Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Detailed topographic survey including preparation of scheme for effective drainage of storm run-off and other waste water including re-development of vehicular traffic movement within Cossipore FCI godown and preparation of detailed project report
Consultancy services for preparation of Detailed Project Report for Bandel-Rajhat-Polba Road from 0.00 kmp to 11.20 km for the work of strengthening in the district of Hooghly strengthening in the district of Hooghly
Preparation of Detailed Project Report for Proposed ground water based JAMUNA BAND pipe water supply scheme, under Bankura Division Block Bishnupur, District Bankura under Jal Jeevan Mission Program under Bishnupur Sub-Division of Bankura Divisio
Detailed survey and preparation of detailed project report for Boxirhat Jorai Road, From 0.000 Km To 9.200 Km widening and Strengthening Work, Under Coochbehar Highway Division, In The District Of Coochbehar including preparation of PPT
Consultancy services for Preperation of Detailed project Report in all respect including quantity cost estimate of Bridge along with its Approaches at Hatchapri over Hobgar Canal in Mouza Kalinagar , Khoyamara and Mayahowri ,GP Sahajadapur,Maydah
Preparation of Detailed Project Report for Proposed Sub Surface Water Based Khayerbani Pipe Water Supply Scheme under Bankura Division, Block Khatra, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division,
Preparation of Detailed Project Report for Proposed sub-surface Water Based Handulia Piped Water Supply Scheme under Bankura Division, Block-Simlapal, District-Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division,
Preparation of Detailed Project Report for Proposed Ground Water Based Harirampur Pipe Water Supply Scheme under Bankura Division, Block Hirbandh, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division, P.
Consultancy services for preparation of Detailed Project Report for Changrabandha - Jamaldaha- Mathabhanga - Road ( SH 16 ) from Ch 35.00 kmp to 52.00 kmp , widening and strengthening work under Coochbehar Highway Division in the District of Coo
Preparation of Detailed Project Report for Proposed sub surface water based Tilaboni pipe water supply scheme, under Bankura Division, Block Simlapal, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division
Carrying out Falling Weight Deflectometer FWD test, 7 Days Traffic Survey, Axle Load Test, Sub Soil Exploration and other necessary field works and calculations for preparation of comprehensive Detailed Project Report ...under Asansol Division, PWD.
Consultancy services for preparation of Detailed Project Report for Changrabandha Jamaldaha Mathabhanga Road ( SH 16 ) from Ch 18.00 kmp to 35.00 kmp , widening and strengthening work under Coochbehar Highway Division in the District of Co
Consultancy Services for Carrying out Falling Weight Deflectometer (FWD) test and other necessary field works and calculations and preparation of comprehensive Detailed Project Report for the work of widening and strengthening (4 Lanning) of Barakar
Extra ordinary repair of IBB Roads in the stretches under IBBR 56 57 62 64 67 68 69 70 75 and link roads total length 200.05 km culvert repair 236 nos and bridge painting 10 nos in the State of West Bengal and Assam along Indo Bangaldesh Border. SH ... of detailed project report for ...
Construction of New design fence and road from BP No. 995/8-S to BP No. 996/3-1S (GIN 332) (Length-2.7 Kms) in AOR of BOP Madhyabalabhut of 14 Bn BSF in District CoochBehar, West Bengal along Indo-Bangladesh Border (IBB). SH: Construction of new ... technical feasibility report for ... technical feasibility report for ...
Construction of Community Based Modified Leachpit with Silt chember for manage Gray Water at Gokulnagar Sheoratala Madrasha at Gokulnagar, under SBM and 15th FC Fund (4th DPR)
Construction of Community Based Modified Leachpit with Silt chember for manage Gray Water at Ararbeghia ICDS Centre at Ararbeghia, under SBM and 15th FC Fund (4th DPR)
UDIN Enabled Webel Services (DPR of IT/ITES- Vetting, NOC of Renting Out Leased Property, Certificate of Tax Exemption, NOC for Transfer of Lease, NOC for Mortgage)
Construction of IIT Kharagpur Research Park, New Town, Rajarhat. SH: Additional 94nos. car parking (83 nos. general car 6 nos. VIP car and 5 nos. Bus/Ambulance) space in line with approved master plan. The parking will be open the sky except the 6 ... approved master plan . ...
Preparation of Detailed Project Report along with Topographical Survey Soil Investigation Traffic Survey and Axle Load Survey etc related to the work Hatigeria Kultikri Rohini Rogra Road 0.00 Kmp to 25.427 Kmp Strengthening under Jhargram Highw
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design and with necessary Estimate for upcoming project work of Kakina Road, From 0.00 km to 8.75 km,W/S
Preparation of Detailed Project Report for Proposed Sub Surface Water Based Pirra Bakra Pipe Water Supply Scheme under Bankura Division, Block Khatra, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division
Preparation of Detailed Project Report along with Topographical Survey Soil Investigation Traffic Survey and Axle Load Survey etc related to the work Jhargram Sevayatan Baita Dheruaghat Road 0.00 Km to 12.00 Kmp Widening and Strengthening under
Preparation of Detailed Project Report with all necessary Survey, Field Works, Traffic Census, Soil Investigation, Pavement Design, axle load survey and with necessary Estimate for upcoming project work of Chilakhana-Natabari road, from 0.00km to 9.8
Preparation of Detailed Project Report for Proposed Ground Water Based Bansi Pipe Water Supply Scheme under Bankura Division, Block Sarenga, District Bankura under Jal Jeevan Mission Program under Khatra Sub-Division of Bankura Division, P.H.E. D
Improvement Riding Quality, Road furniture and 2 nos double cell Box Culvert at 12th and 16th km of Buxa Forest Road.
Widening a part of Road and Surfacing Work, Cross drainage and development of shoulder of Cross Road at Alipurduar
Quotation to obtain the Non Schedule Rates for 2 to 18 Day in South Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Quotation to obtain the Non Schedule Rates for 2 to 18 Day in North Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Quotation to obtain the Non Schedule Rates for 19 to 28 Day in South Bengal Districts to prepare The MELA DPR during the financial year 2026 27, 2027 28 and 2028 29 under WBKVIB, 2nd Call
Notice Inviting Quotation to obtain Non Schedule Rates of 15 to 18 Days for Mursidabad District Level Mela, to prepare the DPR, during F.Y. 2026-27, 2027-28, 2028-29 and 2029-30 2nd Call
Detailed Scheme for dismantling/demolition of existing ROB with special emphasis on Railway portion for submission to ER, Authority for approval and Detailed Project Report for reconstruction of Chitpur Road Bridge over Railway Track after the demoli
Preparation of Detailed Project Report with preparation of PPT with Traffic Census, Soil Investigation, Topography Survey with Total Station and Planning, Design, Drawing, Detailed Estimate in accordance with IRC 37-2018 and IRC 9-1972 for Sreepolly
Preparation of Detailed Project Report with all necessary survey, field works, traffic census and soil investigation and with necessary Estimate for upcoming project work of Dinhata Balarampur Chilakhana Road, from 0.00 km to 20.00 km, W/S
Preparation and submission of Detailed Project Report with preparation of PPT conducting Traffic Census as per IRC 009 1972 for 7 days continuous 24 hrs, Soil investigation, Topographical Survey with Total Station alongwith Axle Load Survey, Falling