Loading…
Loading…
1,349 results • Best match
Preparation of DPR for Roads under RIDF-XXXI works within Birbhum District
Preparation of DPR (including Architectural Drawing, Estimates...S.D.S.A Stadium under Bolpur Municipality
Selection of consultant for preparation of Detailed Project Report for the campus of comprehensive Solid, Liquid Waste Management unit at Chattarpur, Raiganj
Preparation of DPR for Construction of Bridge in place of damaged old bridge at Ch. 1.800 km and repair of causeway at Ch.2.10 km and 250 m flexible pavement from ch. 1.510 km to Ch.1.760 km over BGSY Road namely Ausgram-Joykrishnapur, Pkg No. WB0589
Route Survey Preparation of DPR for RAYAN PART-(IV) DURGA DANGA W/S Scheme under Burdwan-I Block under Burdwan Sub-Division under Burdwan Division PHE Dte.
Formulation and Digitization of GIS-based Master Plan, Integration of various citizen-centric service-delivery based municipal e-governance services, Development of GIS/MIS dashboard
Preparation of Geographic Information System (GIS) based comprehensive Drainage Master Plan and corresponding Detailed Project Report for Haringhata Municipality, Dist.- Nadia, West Bengal.
Preparation of a Comprehensive Mobility Plan for Kolkata Metropolitan Area
Survey of embankments under Kandi Master Plan including adjacent areas and corresponding Mapping and Health Checking under NHP of I and W Deptt., GoWB.
Preparation of DPR for roads under PMGSY IV in the district of Malda.
Preparation of DPR regarding construction of 3200MT food grain storage godown at Khargram.
Preparation of DPR for roads under RIDF-XXXI in the district of Malda.
Preparation Of Geographic Information System (GIS) Based Comprehensive Drainage Master Plan and Detailed Project Report for Nabadwip Planning Area, District Nadia, West Bengal (4thCall)
Preparation of Master Plan, Architectural Plan, Section and Elevation, 3D perspective view, Civil and Structural Design, S and P and Electrical design and detail drawing, DPR preparation and PMC for construction of Kurseong Hospital under GTA at WB.
Preparation of Detailed Project Report (DPR) for the Proposed Football Stadium at Metiabruz, Khaldhari, Kanchantala, Metiabruz PS.
Preparation of Detailed Project Report (DPR) for the Proposed Football Stadium at Pujali, Budge Budge.-I PS
Engagement of Consultancy Services for preparation of Survey and Feasibility Report (FR), Pre Engineering and Tendering Activities Towards Development of 33 11 KV Infrastructure at Jharkhand and West Bengal
Consultancy services for preparation of detailed project report for 4 laning of NH-60 New NH-14 from km. 115.000 Kharagpur to Km 422.450 Moregram in the State of West Bengal
Design, Drawing and Preparation of Detailed Project Report for Augmentation of Kalyaneswari Water Treatment Plant with help of Space Saving Technology and other related works under RCFA Division-I PHE Dte.
PREPARATION OF DPR REGARDING EXISTING GODOWN AT NJP WAREHOUSE IN THE DISTRICT OF JALPAIGURI
Preparation of DPR for construction of New Bridge under rural Connectivity of PMGSY-III
Preparation of DPR for roads in different Blocks in Murshidabad Division for PMGSY Schemes
Professional Consultancy Services for preparation of DPR for the proposed Hardware Park at Kalyani
Preparation and submission of detailed project report including estimate for drainage system of Tarmalipta Govt. Medical College and Hospital at Tamluk in the Dist. of Purba Medinipur in the year 2023 24
Feasibility Study and Preparation of Detailed Project Report with a provision of Interception and Diversion Point at the Downstream Point of River Ganga including Pumping Station and Sewage Treatment Plant at Hooghly-Chinsurah Municipality. 2nd Call
CONSTRUCTION OF PCC ROAD FROM MASTER PLAN TO MUKHLESHUR RAHAMAN HOUSE AT AMDOLGHAT CFC IV
Survey of embankments under Ghatal Master Plan including adjacent areas within the jurisdiction of West Medinipur Division and corresponding Mapping and Health Checking under NHP of I and W Department GoWB
Soil Testing of Berhampore-Kandi-Sultanpur Road from chainage 19.00 KM to 37.50 KM related to the preparation of Detailed Project Report of that stretch of the road under Berhampore Division I, PWD.
Preparation of Detailed Project Report (DPR) for Khardah Khal Identified by CPCB in Interception and Diversion Mode. (3rd Call)
Preparation of Detailed Project Report (DPR) for Baidyabati Khal Identified by CPCB in Interception and Diversion Mode. (3rd Call)
Preparation of Detailed Project Report (DPR)for Bally Khal Identified by CPCB in Interception and Diversion Mode. (3rd Call)
eparation of Detailed Project Report (DPR) for the Proposed Auditorium at Canning beside Canning Sports Complex, Canning-I PS.
DPR Preparation
Preparation of DPR Through outsourcing For Roads under PMGSY-III Roads underJurisdiction of WBSRDA, Malda Division
Preparation of DPR for roads under PMGSY III (Batch-II) in the District of Dakshin Dinajpur
Preparation of DPR for roads of Raipur, Sarenga, Simlapal, Taldanga, Onda, Bishnupur Blocks under PMGSY III
Preparation of DPR for roads of Patrasayar, Joypur, Indus, Sonamukhi and Kotulpur Blocks under PMGSY III
Consultancy Service for Preparation of Integrated Survey Report Pre and Post Work Drawings Detailed Project Report in connection with Desiltation of 14 nos Canals and allied works including Mobilization etc at East Kolkata Wetlands
ENGAGEMENT OF CONSULTANT FROM THE IPA SHORTLISTED FIRMS FOR CONDUCTING TECHNO-COMMERCIAL FEASIBILITY STUDY FOR DEVELOPMENT OF DEEP-WATER DRY BULK TRANSHIPMENT PORT AT ATLANTA BAY IN DIGLIPUR, NORTH ANDAMAN IN ANDAMAN AND NICOBAR ISLANDS
Preparation of Detailed Project Report (DPR) of Development of a Pedestrian Plaza at Street No. 25, Sector-V, Kolkata-91
Preparation of Detailed Project Report (DPR) for Champdani DVC Canal Identified by CPCB in Interception and Diversion Mode.(3rd Call)
Preparation of Detailed Project Report (DPR) for Building schemes under RIDF and onwards and various development schemes for Murshidabad District.
Preparation of Detailed Project Report (DPR) for Bridge schemes under RIDF and onwards and various development schemes for Murshidabad District.
Preparation of Detailed Project Report (DPR) for Roads schemes under RIDF and onwards and various development schemes for Murshidabad District.
Preparation of DPR for reconstruction of approach road at Bolpur RIDF Godown, in the district of Birbhum.
Preparation of DPR forroads underRaipur, Sarenga, Simlapal, Taldanga, Onda, Bishnupur, Patrasayar, Joypur, Indus, Sonamukhi and Kotulpur Blocks.
Preparation of DPR for reconstruction of internal road at RIDF Khargram Godown, in the district of Murshidabad.
Preparation of DPR for reconstruction of internal road at GFD Murarai Godown, in the district of Birbhum.
PREPARATION OF DPR AND PCI NOTING AND UPLOADING FOR CANDIDATE ROADS INCLUDING ONE PHOTOGRAPH IN NOTE CAM
Preparation of DPR for reconstruction of internal road at GFD Ahmedpur Godown, in the district of Birbhum.