Loading…
Loading…
1,256 results • Best match
Up gradation of Check weir at Choukidar Nallah and Govt. Primary School house site Nallah under SD-III, CD, APWD, Diglipur. Balance work
Improvement of Jarawa Nallah Source and providing support pillars for the delivery line.
Construction of drain of size 0.50x0.80mtr for 80mtr length and drain of size 2.30x1.00mtr for a length of 20mtr at Brichgunj.
REIA studies for construction of approach road to Krishna Nallah water fall under EE, MID, APWD, Hut Bay (App. 8.00km)
Construction of drain of size 0.50x0.80mtr for 80mtr length and drain of size 2.30x1.00mtr for a length of 20mtr at Brichgunj. Sub Work Construction of drain at Palm Grove Resort Junction at Brichgunj.
Supply of Excavator for de-silting of nallah and drain alongside the roads under Gram Panchayat Madhupur
Construction of drain cum slab from Gurukul School to St.Marry School Bathu Basthi
Labour element and machinery supply for road work
CONSTRUCTION OF DRAIN RAJESH TUTTI HOUSE TO SHRI PAL HOUSE AT BRICHGUNJ WARD NO 22
Construction of drain covering slab and hand railing at Telegu Basthi in ward no.09
Construction of Drain between Mari House to Mariamma Temple Machi Line in Ward No-10
Construction of drain from Late B Pathu House at Muslim Basthi in Ward No. 08.
Construction of drain from new Power House to Pump House at Rangat Bay Power House.
Re-construction of damaged culvert with RCC box culvert 6 mtr x 5 mtr Single Cell in SH-14 at Chowkidar Nallah Ch 9.80 Km under SD-III, CD, APWD, Diglipur
Providing New Pipe Line from Lamiya Bay Source NO.III to Existing 150mm dia C.I Line near Source No. I at Durmur Nallah Including Construction of Check Weir
ADDITION / ALTERATION TO COMPOUND WALL ALONGWITH THE ROAD OF TRV POND OPPOSITE SITE AND PROVISION OF STORM WATER DRAIN AT TRV AND PROVISION OF HARSTANDING WITH STONE PITCHING AND PAVER BLCOK WORK IN CG RHQ AND CG DHQ PREMISES UNDER GE HADDO, PORT BLA
Construction of drain starting from PRO Quarter Road Junction to near UHC Shadipur in Ward No 11
Construction of Toe Wall cum Drain from Nallah near Madhusudhan house to existing drain adjacent to village road at W. No. 02 under Gram Panchayat Namunaghar.
Construction of Drain besides existing approach road from main road to Sabari Panchayat Bhawan under Gram Panchayat, Sabari.
Construction of Drain at the side of footpath near Adwin house at Lucknow-I under Gram Panchayat, Rampur.
Extension of CC Drain from Ananto Mazumder towards Nallah/Creek area at Kaushalyanagar ward No. 02 under Panchayat Samiti, Rangat.
Construction of Drain and repair of drain with covering slab widening of road starting from Bala Chicken Center to Herald Colony at Shadipur Ward No 11
Construction of drain and repair of drain with covering slab widening of road starting from Bala Chicken Center to Herald Colony at Shadipur in Ward No 11
Construction of Drain across the approach road for diverting water flow at Mithila Residential complex under Rangat Range during 2022-23
Construction of approach road to Krishna Nallah Waterfalls, Little Andaman under EE, MID, APWD, Hut Bay.SW- REIA Studies for construction of approach road to Krishna Nallah Waterfalls (Approx 8.00km)
C/o CC Drain/Protection Barrier from both sides of Kacha Nallah from Main road to Shri.Bhaskar Rao House, Vishwanath House at Nimbutala-5
Construction of CC drain from ATR culvert near Muthuraman house to south creek nallah in the land of dutilall gayar at sundergarh 05GP sundergarh
Improvement of water supply under Birdline SD No.III PHED APWD Prothrapur SW Construction of 03 nos weir Pump House and laying of GI pipeline for tapping water from the weir point at Hathi Nallah Prothrapur Port Blair
Construction of Drain on road side from APWD Qtr to Jama Masjid at Ward No 01 Campbell Bay under Gram Panchayat Govind Nagar.
Construction of Drain Toe Wall from Gate No-1 to Girls Hostel in DBRAIT Campus under CD-I ,SD-II, APWD, Sri Vijyapuram.
Construction of Makeshift Toilet at Anganwadi Centre at Sush Nallah and Gujji Nallah in EFA under Sub Division No.III, NACD, APWD, Mayabunder
Up-gradation of Check Weir at Choukidar Nallah and Govt. Primary School House site Nallah at Kalighat under SD-III, CD, APWD, Diglipur
Construction of CC Drain cum Retaining wall from Zainuddin house to Pahadi Nallah culvert at Ograbraj-02 under Gram Panchayat, Mithakhari by Zilla Parishad, South Andaman
Construction of RCC Drain inside of Sunil Kumar Paul house to nallah via Prabhat Sarkar house 50mtrs at Diglipur ward no. V under Gram Panchayat, Subhashgram.
Desilting of upstream at Shankar Nallah Dam at Baratang
Construction of Drain including R and M of old CC Road at RRO Fishermen colony, Padamanbhapuram -I and II at Shivapuram under Panchayat Samiti, Rangat.
Construction of CC drain for drainage of rain water length 125.00mtr. at BS of Staff Qtrs JNV Arong, Car Nicobar.
Desilting of nallah at Kalinagar on SH 01 at 04 Km to prevent flooding of water over culvert during heavy rain
Repair and Maintenance of CC Drain from Sachi Rani Das towards the nallah at Krishnapuri under Gram Panchayat Sitnagar.
REIA Studies for construction of approach road to Krishna Nallah water fall under EE, MID, APWD, Hut Bay ( App. 8.00 km)
Construction of RCC Drain FROM Timber Treatment Plant to Road side Drainage for a length of 65 Metres during 2024-25
REPAIRS TO AREA DRAINAGE INCL COVERS, DESILTING DRAIN, COMPOUND WALL AND FENCING INCLUDING PAINTING AT 2U DET UNDER GE (SOUTH) DIGLIPUR
Repair and Maintenance of CC Road including one side drain from Pahadi Nallah road near Hamsappa house to Abdul Rahim house at Ograbraj-05 under Gram Panchayat Mithakhari.
REPAIRS TO FOOTPATH, DRAIN COVERS, DRAINS, CHAIN LINK FENCING, SECURITY COMPOUND WALL AND REPAIRS/ CLEANING OF SEWAGE LINES AT MAYABUNDER UNDER GE (S) DIGLIPUR
Improvement of Road from NH4 to Sangeeta Minj House ic loop road from Das House via Dasrathi House, Subramanian Barla house to PM Krishna House at Ward No-3, Calicut for a length of 1016.00 mtrs ic drainage work wherever required under Gram Pancha
Providing Consultancy services for the preparation submission of Detailed Project Report BID documents for construction of proposed new RCC Bridge of length 56.00mtr approx over kimous nallah in kimous village, Car Nicobar under Construction Divisi
Construction of CC Drain from Prakash house to Bipul Mondal house towards nallah via Namita Mondal and Khokan Das house at Panchawati ward No.-I under Gram Panchayat, Shivapuram.
Renovation of Black Top including construction of Drain from Karuppu Swamy house to Shri. Giri house to Velu house at Calicut Ward No. 03 under Panchayat Samiti Prothrapur.
Construction of Check Weir and Pump House Manpur Nallah Near Manpur School SW SITC of 02 No 72 HP Diesel Pumps Set at Manpur Nallah Near Manpur School
PROVN OF PCC DRAINAGE, AREA DRAINAGE AND PARKING SHED UNDER GE BIRCHGUNJ PORT BLAIR