Loading…
Loading…
8,346 results • Best match
SH C.O B.wall in RR masonry between at RD 6.630 to 6.645 and 6.610 to 6.622, R.wall in wire crate at RD 6.490 to 6.540 and V shape drain in (1.3.6
P/L C.C. Pavement at RD 0/060 TO 0/080, 0/180 to 0/210, 1/675 to1/720 and U-Shape drain in km 0/060 to 0/160
SH C.O wire crate R.walls at RD 43.820 to 43.860, 43.690 to 43.720, 43.750 to 43.820, PCC R.wall at Km. 37.850 to 37.857 and V.shape drain in Km. 43.770 to 43.825
SH Maintenance of drain Cutting of branches of trees and shrubs maintenance of earhen shoulder cleaning of grbbing road land including uprooging wild vegtration grass etc. in Km. 0.0 to 7.0
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, and Tarring work including five year routine maintenance etc
Improvement of road, R/walls, C.D. work, GSB, WBM-II, WBM-III, Tarring work,BM, CC pavement, Side Drain,parapets and road furniture ic five year routine maintenance) (under NABARD RIDF-XXXI)
(I)P/L 25mm thick B.C. and 2.5 mm thick road marking thermoplastic strip and V-shape drain in km. 0/00 to 1/00 and 1/00 to 2/030). (HP0302VR0176).
Construction of 3.00mtr Span RCC Slab Culvert at RD 0/945, V-Shape drain from RD 0/630 to 0/750 Hume pipe culverts at RD 0/060 and 0/615) SCSP
(SH- Repair of pot holes with Penetration Macadam and 30mm bituminous concrete in km. 0/230 to 0/850 and C/O road side V-shape drain in various RDs). Under AMP.
Providing and laying wearing and tarring, providing and laying cement concrete pavement, construction of road side drain, construction breast wall, retaining walls and formation cutting between Km 0/000 to 1/500
Providing and laying Mastric Ashphalt and Bituminous concrete on Deck slab of bridge alongwith U-shape drain, PCC Parapets and C/o 2.00 meter span RCC slab culvert at RD 5/450
Providing retaining structure, Missing CD, Metalling and Tarring, road side drain including 5 years maintenance in km 38/0 to 43/0 under PMGSY-II Batch-I Package No. HP-10-270
SH C/o B/wall and V-shape drain at km 204/680 to 204/710 and 205/260 to 205/310 for the year 2019-20 in the State of H.P.
Removal of Formation deficiency at RD. 53/350 to 53/450 and C/O R/wall at RD. 53/360 to 53/380 Side Drain at RD. 53/350 to 53/700
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher and C/o unlined drain between Km 6/00 to 7/00 and 12/00 to 13/00).
C/O PCC B/Wall at RD 8/410 to 8/450, 8/470 to 8/495, PCC V-Shape Drain at Rd Km 8/400 to 8/500 with Paved Shoulders.
Providing and laying BUSG Bituminous Concrete in Km.0/0 to 2/400, Providing and laying hot applied thermoplastic edge line and construction of PCC hill side drain in 240 metre length
Periodic Maintenance on Parga Banyas road road VR-0069 (SHProviding and Laying 30 mm Bituminous concrete including profile correction, Thermoplastic paint and V-Shape drain in Km 0/00 to 3/500).
C/o PCC B/wall at RD 1/547 to 1/560 with PCC drain at RD 1/547 to 1/560 alongwith crash barrier at RD 1/547 to 1/577)
Providing and laying cement concrete paver block in Km. 0/0 to 0/070, Km. 0/170 to 0/225, BUSG, bituminous concrete and drain in Km. 0/070 to 0/170).
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 2/00
C/O B/wall at RD 26/815 to 26/825 along with side drain from RD 24/640 to 24/670 and 24/830 to 24/840(Deposit SDF/2024/1268
SH C O Un lined surface drain , cutting of brahnches of trees , maintenance of earthen swhoulder and clearing and grubbing road land including uprooting wild vegetation , grass etc K. 0.0 to 7.0
Providing and laying BUSG Bituminous concrete in kilometer 0-0 to 2-400 Providing and laying Hot applied Thermoplastic edge line and construction of PCC hill side drain in 240 mtr length
Providing and Laying BUSG Bituminous concrete in Km.0-0 to 6-0 providing and laying hot applied thermoplastic edge line and construction of PCC Hill side drain in 600 metre length
Formation cutting, retaining walls, Breast walls, Cross Drainages, Unlined Drain, Parapets and Logo Board, Km. Stone and 200 mtr. stone in Km. 0/0 to 4/600 under NABARD RIDF-XXVIII Project.
P/L GSB, G-II, G-III, Primer Coat, Tack Coat, Premix Carpet and Seal Coat at RD 0/400 to 0/700, C/o R/Wall and Drain at Various RDs
C/o ROFD, R/walls, M/T CD drain, Parapets, Crash barriers and logo board, Km. stones and 200m stones etc. in Km. 0/0 to 6/200 under NABARD RIDF-XXVIII.
Providing and laying 30mm thick bituminous concrete, PCC drain in K.M. 0/0 to 1/0, 1/0 to 2/0, 2/0 to 3/0 and 3/0 to 4/0
P/L WBM-G-I,II,III and Tarring and PCC V-shape drain in km. 0/100 to 01/300 and C/o RCC hume pipe culvert at RD. 0/350
Periodical maintenance on Balindi Kanda road VR-00130 (Sub Head- Providing and laying 30 mm bituminous concrete, profile correction, Thermoplastic paint and V-shaped drain in Km. 0/0 to 2/00)
5/7mtr. Wide formation cutting, R/Wall, C.D, GSB, WMM and Tarring, V-Shape drain, Parapets, sign boards and Km Stone) (Under NABARD) (RIDF-XXVIII)(i/c 5 years of routine maintenance)
P/L 30mm thick bitumen concrete, interlocking, PCC drain ,missing Km, stone and 2.5mm thick road marking thermoplastic strip in Km 3/0 to 4/0 , 4/0 to 4/910). HP0302VR0052
P/L G-III in patches and P/L bitumen concrete 30mm thick in kms 0/0 to 3/0 and 7/0 to 8/0 including interlocking paver block and drain
Providing and laying BUSG Bituminous concrete in Km 0-0 to 4-0 Providing and laying Hot applied thermoplastic edge line and construction of PCC Hill side drain in 400 mtr length
Construction 900 mm dia hume pipe culvert with wing wall at rd3/525 and R/wall ,B/wall in wire crate ,U-shape Side drain at rd 3/300 to 3/880 )
Providing and laying BUSG, Bituminous Concrete in Km.4-0 to 7-040, providing and laying Hot applied thermoplastic edge line and construction of PCC Hill side drain in 300 mtr Length
F/C, C/O R/Wall, B/Wall, Hume pipe culvert, P/L G-I, G-II,III, 50mm thick BM, 30mm thick BC, C/O V-Shape drain, PCC parapets etc
Improvement of deficiency, Construction of Retaining walls, Breast walls, P/L, M/T, Construction of 900mm dia hume pipe culvert, V-shape drain and parapets at R.D. 0/0 to 1/0
Construction of retaining wall and U-Shape drain at km. 0/035 to 0/135 and cement concrete pavement at km. 0/035 to 0/040 and 0/0752 to 0/080).
Formation Cutting ,C/O Passing places, Breast wall Retaining wall, Gabion wall, Missing CD, Road side Drain, parapets, Crash Barrier , Road sign board , Bio Engineering Works ,Paver Blocks and Tarring work etc.
(SH- Hiring of JCB and tractor with trolly for removal of slips, dressing of berms, cleaning of side drain, debris, restoration of rain cuts and filling of pot holes on various roads.)
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, and Tarring work including five years routine maintenance etc
SH Hiring of JCB for removal of slips, shoulder breams and maintenance of road surface, drain etc. and Hiring of Tipper 5.50 cum capacity for carriage of material as and when required
SH Hiring of JCB for removal of slips, shoulder breams and maintenance of road surface, drain etc. and Hiring of Tipper 5.50 cum capacity for carriage of material as and when required