Loading…
Loading…
8,340 results • Best match
C/O CC pavement from 1/100 to 1/130 solid causeway at RD 1/250 to 1/258.50, V shape, U/shape drain at various reaches and crate work
C/O W-Metal Beam (W) Crash Barrier i/c edge Wall at RD 2/720 to 3/050 and C/o V-Shape Drain at Various RD Under PDNA
P/L HPC 900 MM Dia along with toe walls and wing walls, interlock tiles, bituminous concrete, V-shape drain,, protection work etc in km 0/0 to 6/400
SH C O B wall at RD 0 720 to 0740 PL interlocking paver block at RD 0720 to 0740 and V Shape drain at RD 000 to 1110 PDNA
SH Removal of formation deficiency, Co passing places, Retaining Wall, Breast Wall, Gabion Wall, Missing CD, Side Drain, Parapets, Logo Sign Board, Bio Engineering, Interlocking CC Block and Tarring work)
SH Maintenance of drain , cutting of branches of trees shrubs , maintenance of earthen shoulder and clearing and grubbing road land including uprooting wild vegetation grass etc, Km 0.0 to 12.645
(SH- Providing and laying 25mm. thick Bituminous concrete in km. 1/0 to 3/0 including profile correction, drain and Grating). Under Annual Maintenance Plan for the year 2025-26.
Construction of V-Shape Drain at Various RDs from Km 1/135 to 1/300 1/530 to 1/645 and R/Wall at RDs 3/450 to 3/490
Construction of Retaining wall at Km. 0/160 to 0/175, 0/210 to 0/240 and U-shape drain at Km. 0/200 to 0/255 under PDNA 2023).
Housing Colony at Sheel Near Solan Distt Solan HP SH Removal Refixing of settled Paver Block Providing Wicket Gate and C O V Shape drain at HIMUDA colony Entrance Gate
SH- Formation deficiency, C/0 900 mm dia HP Culvert at Rd 0-265, 0-610 alongwith wing wall and V-shape drain at Rd 0-255 to 0-390
P/L 30mm thick bituminous concrete in kms 3/0 to 5/0 and wet mix macadam in pots holes and cement concrete paver block and Const. of side drain.
Restoration of Rain damages at Gamru village on L/R from Brahmi Devi house to Sat sang Shed S/H - C/O Drain and breast walls in Ward No. 5
Construction of Retaining wall and Breast walls , providing and laying GSB, G II, GIII and BM and BC, construction of side drain and essential parapets in km 0.00 to 0.310
Retaining wall and Breast wall C D works M/T works providing and laying V-shape drain and essential parapets km 0/00 to 5/760)(Under NABARD RIDG-XXV
Construction 900 mm dia hume pipe culvert at rd 4/060 4/180 and R/wall in wire crate ,U-shape side drain at rd 4/030 to 4/290)
C/O V-Shape Drain at Km 1/550to 1/770, 2/480 to 2/610,2/860 to 2/990,3/180 to 3/450 and 9/300 to 9/500
(SH-P/L G-III and 20mm thick premix carpet surfacing in km.0/0 to 1/300, V-shape drain in RD.0/0 to 1/0).Under SCSP.
Providing and laying 30mm bituminous concrete pavement, road side drain and C.C. pavement in various reaches on DSS Kandi road, portion Sarotari Aprehar road, Kanda Munda road (Under Telecom Deposit)
Constrion of Wire Crate, 2.00 mtr, span RCC Culvert, Hume Pipe Culvert, C.C. Pavement, Drain with Edge wall and Metalling and Tarring of Kuru to Ghallour road Portion) (OFC DEPOSIT )
SH- Providing and laying soling G-I, G-II and G-III, Metalling and Tarring, PCC V-Shape drain etc. and PCC Parapets in Km. 0/00 to 1/00
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, and Tarring work including five years routine maintenance etc
R/wall, B/wall, C.D Work, GSB, WBM-II, WBM-III, M/T , Road side Drain parapets, Sign board in km 07/800 to 24/00 ) UNDER NABARD RIDF XXV
SH- Formation Cutting, passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC pavement, side drain and parapets, Raod sign Board including five year routine maintenance
P/L Kharanja stone soling and interlocking paver block between km. 2/165 to 2/240 and construction of U-shape drain between RD 2/165 to 2/300 PDNA
R/wall, B/wall, C.D Work, GSB, WBM-II, WBM-III, M/T , Road side Drain parapets, Sign board in km 0/0 to 07/800 ) UNDER NABARD RIDF XXV
SH Maintenance of drain , cutting of branches of trees shrubs , maintenance of earthen shoulder and clearing and grubbing road land including uprooting wild vegetation grass etc, Km 0.0 to 10.0
Formation Cutting, C/O Passing places, Breast wall Retaining wall, Gabion wall, Missing CD, Road side Drain, parapets, Crash Barrier Road sign board Bio Engineering works and Tarring work etc.
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling andTarring work and road signages etcetra including five year routine maintenance)
SH Construction of Breast wall at RD 2.330 to 2.350 LHS 2.460 to 2.480 RHS U shape drain with edge wall at RD 2.545 to 2.645 RHS Under PDNA 2023.
C/O B/Wall at Rd 4/180 to 4/190, R/Wall at Rd 4/285 to 4/295 , V-Shape drain at RD 4/150 to 4/285)
SH FC CD GSB road side drain parapets and Km. Stone Km.0.00 to 4.240 L-123 i.e. five year maintenance Package No.HP01159 Under PMGSYII for the year 2018 19
P/L GSB, WMM, 25mm thick bituminous concrete in km 2/800 to 2/920 and C/O V-shape Drain in km 2/695 to 2/950). (DC Deposit)
SH- C/O Breast wall at RD 4/147 to 4/167, 4/175 to 4/180 and V-shape drain at RD 4/147 to 4/200) (PDNA-2025)
Metalling and Tarring, R-walls B-walls, PCC drain Parapets, km Stone, Setting out, Metal Beam, Un-Paved shoulder and five year maintenance under PMGSY-II Package No.HP-06-144.
Hiring of earth cutting/ excavating machine for removal of slips/ Dressing of berms, clearance of side drain etc. (1) Thaltukhod Marh road (2) Thaltukhod Graman road and other road etc.)
Hiring of Hydraulic Excavator/JCB for removal of slips dressing of road berms filling depressions, clearance of drain and culvert etc and hiring of tipper for carriage of Debris/boulder
Hiring of Hydraulic Excavator/JCB for removal of slips dressing of road berms filling depressions, Clearance of drain and culvert etc and Hiring of tipper for carriage of Debris/boulder
SH C O 900 mm dia RCC Hume pipe culverts at Rd 3 200 3 584 3 790 3 960 4 170 4 300 4 680 and 4 920 and WBM Grade I in K M 3 0 to 5 0 and WBM Grade II in K M 3 0 4 0 and C O unlined surface Drains in K m 3 0 to 5 0 UNDER SCSP
C/O R/wall at Rd 0/015 to 0/030 0/100 to 0/120, 0/045 to 0/060 0/080 to 0/090, P/L 900mm dia RCC Hume pipe culvert at Rd 0/130, cement concrete pavement at Rd 0/00 to 0/150 , C/O V-shape drain at Rd 0/040 to 0/100 U-shape drain at Rd 0/100 to
SH P/L paver block at RD. 0/465 to 0/675 and 0/890 to 0/930 C/O R/Wall at RD 0/570 to 0/630 LHS and B/Wall at RD, 0/570 to 0/625 RHS C/O V-Shape Drain at RD. 0/465 to 0/840and 0/870 to 0/890 and C/O Cross drain at RD 0/890 C/O Cement c
C/O Passing places, Missing CD, side drain , parapets, crash barrier, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19) Package No. HP-04-393
SH ROFD C/O R/wall and Brest Wall C.D. Works, Meatalling and Tarring, Drain work Parapets and Sign Board in Km. 0/0 to 1/390) Under NABARD RIDF-XXV
SH Construction of R/walls , B/walls , 900 mm HPC with Both side wing wall , V Shape Drain and Providing and Laying Wearing Coat GSB and G II at Various Rds
C/O Passing places, Missing CD, Side Drain, Parapets, Crash Barrier, C.C. Pavement and Tarring work) including five year maintenance under PMGSY, Batch-II 2018-19 Package No. HP-04-393
C/O ROFD , M/T, R/walls, B/walls, CD Works, , V shape Drain and Parapets etc. i/c 40.00 mtr. Span PSC/RCC Box Girder Bridge at RD 1/890)
C/O passing places, missing CD R/wall side drain parapets CC pavement and tarring work including five years maintenance under PMGSY Batch I 2018 19 package No HP 04 372
SH Providing and laying Grade III M/T in Km0/0 to 0/850 and C/o U and V shape drain and essential parapets in Km0/0 to 0/850
SH F/c widening C/o CD and M/T in Km0/0 to 0/500 SH M/T C/o V Shape drain parapets in RD0/0 to 0/360
Sub-Head- M-T work, RCC retaining wall, Breast wall, Hume pipe culvert, slab culvert, V-shape drain, W-metal beam crash barrier and Soil nailing at Km. 14.950 to 15.287)