Loading…
Loading…
8,340 results • Best match
Providing and laying BUSG, Bituminous concrete in km.0-0 to 2-0, 4-0 to 5-0 and construction of PCC hill side drain in 300 metre length
C/O R/Wall at RD 2/670 to 2/685 , 6/996 to 7/000 and V-shape drain at RD 5/850 to 5/950 ) P.D.N.A-2023
Improvement, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, C.C. Pavement, side drain, Parapets and Road side sign boards) (Under NABARD RIDF-XXVI)
SH Deployment Hiring of JCB/Excavator-cum loader for removal of slips, dressing of katcha road surface berms and cleaning of road side drain culverts etc. at various RDs
C/O Passing places, Missing CD, side drain , parapets, CC pavement and tarring work including five year maintenance under PMGSY (Batch-II, 2018-19) Package No. HP-04-395
C/O passing places missing CD side drain parapets CC pavement and Tarring work including five year maintenance under PMGSY Batch I 2018 19 Package No HP 04 373
SH Deployment Hiring of JCB Excavator-cum loader for removal of slips, dressing of katcha road surface berms and cleaning of road side drain culverts etc. at various RDs
SH Deployment Hiring of JCB Excavator-cum loader for removal of slips, dressing of katcha road surface berms and cleaning of road side drain culverts etc. at various RDs
SH Providing and laying BC in km 0/419 to 0/621 C/o V Shape drain on various RDs C/o Edge wall at various RDs including shoulder
SH-Formation cutting 5/7 mtrs wide i/c R/Wall and B/Wall, X-Drainages Work, V-Shape Drain, PCC Parapets, Mettalling and Tarring) under NABARD RIDF-XXI
ROFD, 900mm dia hume pipe culverts, B/walls, R/walls, GSB, WBM-II, WBM-III, Tarring, Parapets and V-shape drain etc. Under NABARD RIDF-XXVIII, Distt. Mandi H.P.
Improvement, C/o Passing Places, Missing CD, Side Drain, Parapets, Crash Barrier, CC Pavement and Tarring work under PMGSY-II, Batch - I, 2019-20 Package No. HP-02-07
C/o Box Cell Slab Culvert 2.00x2.00mtr span at RD 3/900 alongwith R/wall and V-shape drain on both side from RD 3/880 to 3/890
ROFD, Metalling Tarring, R/walls, B/walls, CD, Hume Pipe, V-shape drain, Parapets and Routine maintenance etc. under NABARD RIDF-XXVIII, Distt. Mandi H.P. MLA Priority 2018-19
Protection work to existing sliding portion by providing Retaining wall in Wire Crate with PCC Pushta and construction of U-Shape Drain at RD. 7/830 to 7/870)
C/O Retaining wall at RD- 1/350 to 1/360, 1/820 to 1/835 and Construction of unlined drain Km.1/260 to 1/380).(Under PDNA)
P/L G-II, G-III, Primer Coat, Tack Coat, Premix Carpet and Seal Coat at RD 1/825 to 2/225 and C/o Drain at Various RDs
SH PL interlocking paver block at RD 0 120 to 0 220 0 300 to 0 400 edge wall and VShape drain km 0 00 to 3 700 PDNA
SH Providing and laying 30mm thick bituminous concrete including profile correction, V-shape drain and road marking in Km 0/0 to 1/0 and 6/0to 7/630.
SH Providing and laying premix carpet and seal coat in km 0/0 to 0/650 and C/o V-Shape drain in km 0/0 to 0/500
Formation Cutting, C/o 4.00mtr. Span Slab Culvert, R/Wall, C.D. Work, GSB, WMM, Tarring Work, Cement Concrete Pavement, Road Side Drain in KM 34/00 to 39/180
ROFD, Metalling Tarring, R/walls, B/walls, C.D. works, Hume pipe, V-shape drain, Parapets, 19.75mtr. span bridge and Routine maintenance etc.) under NABARD RIDF-XXVIII, Distt. Mandi (HP)
SH- ROFD including 5/7 mtrs F/C , R/wall, B/wall, CD work, Parapets, Drain, M/T in Km. 0/0 to 14/810 under NABARD RIDF-XXIV
C/O PCC B/wall in km 3/535 to 3/550, 3/550 to 3/770 and PCC V-shape Drain in km 3/525 to 3/585)
C/O 900 mm Dia H/pipe culvert at RD 3/420 and U-shape drain at RD 3/200 to 3/350 and 3/420 to 3/560
Construction of Retaining walls, Breast walls, Wire Create Walls, Hume pipe Culvert, Road Side Drain, Parapets, Metalling and Tarring and Crash Barrier at R.D. 35/00 to 51/00
U-shape drain at RD. 51/400 to 51/430, 43/620 to 43/650 and R/wall 49/520 to 49/530 and 49/630 to 49/640).
Improvement , C/O Passing places, Missing CD, side drain, parapets, CC pavement , Interlocking paver Block and Tarring work including five year maintenance under PMGSY-II Batch-I, 2019-20)
Improvement ,C/O Passing places, Missing CD, side drain, parapets, CC pavement , interlocking paver Block and Tarring work including five year maintenance under PMGSY-II , ( Batch-I, 2019-20)
C/O Passing places, R/wall, Missing CD works, side drain , parapets, CC pavement, B.M. and Tarring work including five year maintenance under PMGSY-II ,( Batch-I, 2019-20)
Improvement ,C/O Passing places, Missing CD, side drain, parapets, CC pavement , interlocking paver Block and Tarring work including five year maintenance under PMGSY-II ,( Batch-I, 2019-20
Formation Cutting, Passing Places, R/Walls, Missing CD work, Side Drain, Parapets, CC Pavement and Tarring including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII)
SH Improvement Passing Places Rwall CD work GSB WBM G-2 WBM G-3 Tarring work road side drain parapets and cement concrete pavement in Km 0.000 to 1.870
C/O Protection work at Km 26/925 to 26/947,C/O U-Shape Drain at Km 26/800 to 27/000 and Restoration of rain damaged crust.
Repair of earthen shoulder, cutting of shrubs, unlined drain, removal slips and Providing and laying Interlocking paver block etc. in KM 8/00 to 16/720 Deposit under SDRF
Improvement, C/o Passing places, CD works, GSB, WBM-II, Side drain, Parapets, CC Pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No.HP-08-539.
Formation Cutting, C/o Passing Places, R/wall, B/wall, CD, Side Drain, Parapets, Cell filled CC Pavement and Metalling and Tarring work etcetera including five-year routine Maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, CD, Side Drain, Parapets, Cell filled CC Pavement and Metalling and Tarring work etcetra including five year routine maintenance)
SH. C.O PCC U shape drain and P.L WBM G. I II. III and 20 mm thick premix carpet with seal coat from Km 7.900 to 8.360 Under BADP
(SH- C/O C.C. Pavement in Cement concrete 1.1.5.3 at RD 0/00 to 0/100 and V-Shape drain at RD 0/00 to 0/075(Shahpur Constituency)
ROFD metaling and tarring , R/wall,B/wall, CD works, V-shape drain and parapets road furniture crash barrier and signe board under CRF Job No hp 2018-19-147
C/O ROFD Retaining walls, Breast walls, Cross Drainages, Drain, Parapets and Citizen Information Board, Logo Board, Km. stones, 200mtr. Stones and Soling in Km. 0/0 to 3/700.
SH.C/O 5/7 mtr wide road formation cutting R.wall C.D., GSB G.IIG.III and tarring V shape drain parapets in km. 2/0 to 7/460) Under Nabard RIDF XXV
SH P L Bituminous concerete 25 mm thick unlined drain and providing and applying thermoplastic centere line and edge line and Zebra crossing in K.M 67/0 to 68/0
Providing and laying BUSG for correction layer, bituminous concrete in km3-0 to 5-0 providing and laying hot applied thermoplastic edge line and construction of PCC Hill side drain
Repair of pot holes and V-shape drain at various Rds. in between km. 0/0 to 8/0 , 0/0 to 5/0 0/0 to 6/0 respectively )
P/L WMM, Surface Dressing, BC at KM 34/790 to 34/915 and C/O PCC V-shape and U-Shape Drain at KM 34/700 to 34/800)
P/L Patch work in between Km 0/0 to 6/0, P/L CC pavement at essential reaches and C/O V-shape drain at essential reaches).P.D.N.A-2023
P/L 25mm thick B.C. and 2.5mm thick road marking thermoplastic strip and V-Shape drain in km. 1/0 to 2/0 and 2/0 to 3/920). (HP0306VR0021)
Providing and Laying WBM G-II,G-III and Tarring in km. 0/00 to 1/500 and C/o V shape drain in km. 0/00 to 0/500)