Loading…
Loading…
8,339 results • Best match
SH C/o Hume Pipe Culvert 900mm dia at RD 0725, 1/150, 2/225, and 600mm dia at 2/330 and V shaped Drain PDNA 2023
C/O V-shape drain with edge wall at Rd 24/810 to 24/930 and C/O R/wall at RD 24/825 to 24/835
ROFD Metalling and Tarring Earthen shoulder sign Board PCC drain Metal Beam Missing CD Parapets and five year maintenance Under PMGSY-II. Package No. HP-07-150.
Sh - Improvement of formation deficiency, U-shape drain, WBM Grading-I and 3 Nos. Hume pipe culvert at various RDs between km 0/000 to 0/400
Periodic Maintenance of Earthern Shoulder, Drain , Culvert, Sign Board, 200 meter stone, Kilometer stone and White Washing of Parapets in Km RD 12/375 to 22/375
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, and Tarring work including five year
Providing and laying BUSG , Bituminous Concrete in Km. 5-0 to 6-0 and const. of PCC Hill side drain in 100 mtr. Length) and edge line
SH bituminous concerete unlined Drain and providing and applying thermoplastic center and Edge Line in KM 3 0 to 4 0 and 6 0 to 8 0
Providing and laying BUSG , Bituminous Concrete in Km. 4-0 to 6-440 and const. of PCC Hill side drain in 300 mtr. Length and edge line.
C/O V-Shape Drain at RD 18/360 to 18/960 and Repair of Damaged Crust at Various RDs in Km 18/150 to 18/960
Providing and laying BUSG , Bituminous Concrete in Km. 0/0 to 2/0 and const. of PCC Hill side drain in 200 mtr. Length) and edge line.
SH F/C and filling, C/o R/wall, B/wall, Hume pipe culvert, side drain, M/T work , P/L Paver Block and Dumping work etc.
Periodic Maintenance of Earthern Shoulder, Drain , Culvert, Sign Board, 200 meter stone, Kilometer stone and White Washing of Parapets in Km RD 0/000 to 10/000
Periodic Maintenance of Earthern Shoulder, Drain, Culvert,Sign Board , 200 metre stone, Kilometer stone and White Washing of Parapets in km RD 12/375 to 22/375
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Hiring of Excavator Cum Loader along with tipper for clearance of side drain, maintenance of berms and removal of Debris/slips in Chhausha Section) (Job No.1)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
SH C/O ROFD, Protection work, Cross Drainages works, MT, Cell filled Pavement, Road side drain, Crash Barrier, Parapets, Road furniture, Bio Engineering, Dumping site Package No.HP06196.
C/O V-Shape Drain at RD 19/700 to 20/100 and R/Wall in aire Crate and PCC at RD 19/720 to 19/737
SH Providing and laying cement concrete pavement at RD 79.260 to 79.290 79 .700 to 79.760 and construction of U shape drain at RD 80.675 to 80.895
Hiring of Excavator cum loader along with tipper for clearance of side drain, maintenance of berms and removal of Debris/slips in Gaura section) (Job No.1)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board and Cell Filled Cement concrete Pavement.
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance)
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
Improvement, C/o Passing places, CD works, side drain, parapets, CC pavement and Tarring work) under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-525.
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
P/L 30mm thick bituminous concrete, thermoplastic road marking and maintenance of side drain on NH-07 road to Majra road Km. 0/0 to 1/0.)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
SH C/o PCC Retaining wall at RD 0/0 to 0/015 0/045 to 0/060 0/075 to 0/100 and interlocking pavement at RD 0/030 to 0/045 and C/o Cross Drainage at RD 0/150 and P/L complete Metalling/Tarring in km 0/0 to 0/250
C/O 900 mm HPC at KM 1/850, R/wall at KM 1/860 to 1/885, V-Shape Drain at Km 1/750 to 2/050
Providing and Laying patch work, Maintenance of drain and Maintenance of berms, 25 mm thick Bituminous concrete and thermoplastic paint line between km. 0/00 to 6/00).
SH- Providing and laying soling, GSB, WBM-G-II, G-III and Tarring and Construction of V-shape drain in km. 0/00 to 1/700 ) under SCSP
SH Providing and laying renewal coat by providing Bitumenous concrete in km0/0 to 4/0 including road marking C/o side drain and HPC at RD2/825
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
C/O Formation cutting, R/wall, B/walls,unlined drain, parapets, informatory sign board, Kilometre stone and 200 metre stone board in Km. 0/00 to 2/500
(SH- F/C and filling C/O R/Walls interlocking tile flooring and C/O U-Shape and V-Shape drain in km. 0/0 to 0/630)
Construction of cement concrete pavement at RD 0/0 to 0/780 and V-Shape Drain at RD 0/700 to 0/800). Under Chief Minister Announcement work.
ROFD, Wire Crate Wall, V-Shape Drain and P/L Cement Concrete Pavement from KM 0/120 to 0/285 and 1/200 to 1/500 under SCSP
(SH- C/O R/B walls CD works, M/T,PCC Drain, PCC parapats, logo Sign Baord, KM Stone etc. and five years routine maintenance under pkg.HP09-354 )
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Providing and Fixing MS Channel and M.S. Plate at RD 0/940 to 0/955 and CC Pavement Along with drain at Km 0/900 to 0/960
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Barthata Section
Wideing of road and Retaining wall in various RDs, V-shpae Drain at Rd. 0/00 to 1/00 and Tarring 0/500 to 1/00)(Balance work
S.H. Removal of land slides slips on Shakrela Karoli Road Km 0.000 to 6.000 C.o unlined drain and shoulders on Raila to Shakrela Road Km 0.000 to 11.200.