Loading…
Loading…
8,340 results • Best match
S.H. Removal of land slides slips on Shakrela Karoli Road Km 0.000 to 6.000 C.o unlined drain and shoulders on Raila to Shakrela Road Km 0.000 to 11.200.
Formation cutting passing places, Retaining wall, C.D. work GSB, WBM-II, WBM-III, Tarring work, side drain, parapets C.C. pavement and Sign Board etc )(Under Shimla Smart city
C/O R/wall at Rd 0/890 to 0/920 and Down Drain Bed at RD 0/050 to 0/110 and 0/480 to 0/510
ROFD, Protection work, CD work, Metalling and Tarring Road, Side Drain, Crash Barrier, Parapets, Road Safety Km. Stone and Dumping Structure in Km. 0/00 to 4/720.
C/o Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets and road furniture including five year routine maintenance
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Pandranoo Section
Metalling Tarring, R/walls, B/walls, CD, Hume Pipe, V-shape drain, Parapets and Routine maintenance etc. under NABARD RIDF-XXVIII, Distt. Mandi H.P. MLA Priority 2018-19
C/O U-Shape Drain at RD 25/050 to 25/105, 25/375 to 25/610, 28/860 to 26/070 and 27/000 to 27/310
Formation cutting, passing place, R/wall, CD work GSB, WBM-II, WBM-III, tarring work, side drain, parapets paver block and dumping site etc.) under NABARD-RIDF-XXIX
SH C/O U shape drain with RCC hume pipe 450mm dia from RD 1/420 to 1/435 and 1/440 to 1/500 along the road
SH Providing GSB G II G III BC in extended portion and RCC extended drain Interlocking tiles Kerb stone etc in between RD 6 0 to 7 0
C/O R/wall at various RDs, P/L CC Pavement at RD 1/550 to 1/600 and V-shape Drain at various RDs) (under PDNA Head)
SH Construction of B/wall at RD 0/290 to 0/365 and P/L PCC V Shape Drain at Various Rd km 0/00 to 1/300
SH- Providing and laying soling, GSB, WBM-G-II, G-III and Tarring and Construction of V-shape drain in km. 0/00 to 1/00, under SCSP.
Improvement of curve, Passing Places, C/o R-wall, C.D. works GSB, WBM-II, WBM-III, M/T, side drain, parapets and sign board) under NABARD RIDF-XXVIII
Formation Cutting, Passing Places, R/wall, C.D. work, GSB, WBM-II, WBM-III, M/T work, Side Drain and parapets. Under NABARD RIDF-XXX. Including 5 year Maintenance
Providing and Laying BUSG for correction layer, Bituminous concrete in kilometre6-0 to 10-0,Providing Laying Hot applied Thermoplastic edge line and const of hill side drain
ROFD, CD Works, R Walls MT C.C. Pavement Side Drain Side Parapets Road Furniture and 5 year routine maintenance under PMGSY Batch II Package No. HP-04-311
ROFD for 5/7 mtr.wide road,R/wall , C.D., GSB, WMM and Tarring, Drain and Parapets in between km. 0/0 to 2/0) Under NABARD RIDF-XXV
Construction of Retaining walls, Breast walls, Wire Create Walls, 2.00 mtr. R.C.C. Slab Culvert, Road Side Drain, Parapets and Crash Barrier at R.D. 0/00 to 35/00
Construction of PCC Retaining wall at R.D. 0/168 to 0/180 and Retaining wall in wire carte above PCC bond and V-shape drain at various RDs
SH ROFD C/O retaining/breast wall C/O V-shape drain at various RDs and C/O hume pipe culvert at RD 0/840 Under OTMNP Head
P/L 30mm thick bitumen concrete, PCC drain, missing Km. stone and 2.5mm thick applied thermoplastic strip. km. 0/0 to 1/0 , 2/0 to 3/0
Providing and laying 30mm thick bituminous concrete and PCC drain in K.M. 52/0 to 53/0, 55/0 to 56/0 and 56/0 to 57/0
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Jubbal Section
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Anti Section
Earth work, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Kharapather Section
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Mandal Section
C/O V-Shape Drain at RD 0/555 to 0/605 and 0/825 to 0/900 and Edge wall at RD 0/925 to 0/940
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Sheelghat Section
ROFD, R/Walls, P/L GSB, WBM,M/T,CD work, road side drain, Parapets and Km Stones including C/o 40.00mtr span pre-stressed bridge) (Under NABARD)
C/o B/Wall at RD 1/140 to 1/155 and U-Shape Drain at RD 1/140 to 1/155 and 1/670 to 1/720
ROFD, Metalling and Tarring, R/walls, B/walls, PCC drain Hume Pipe culverts and parapets etc. and five year maintenance under PMGSY-II. Package No. HP-06-148.
C/O R/Wall at RD 9/520 to 9/525 and 9/908 to 9/910 and U-shape drain at RD 9/600 to 9/900
Improvement, C/o passing places, missing CD, Side Drain, Parapats,Cement concrete pavement and Tarring work and five year maintenance under PMGSY-IV Package No HP-09-781.
ROFD for 7/9 mtrs wide, R/walls/breast/walls, C.D., Cement Concrete payment, drain, Parapets, Road Furniture, Dumping sites etc. in km 0/0 to 3/00)
SH C/o side drain between RD 0/490 to 0/550 0/475 to 0/550 0/550 to 0/600 and 0/900 to 1/150
(SH Providing and laying 30mm thick bitumen concrete, PCC drain, missing km. stone and 2.5mm thick road marking thermoplastic strip in km. 2/0 to 3/0). HP0306VR0024.
Construction of U-Shape Drain at RD 62/435 to 62/480, 62/810 to 62/905, 63/100 to 63/185 and 63/400 to 63/450)
SH Hiring of JCB for removal of slips,Road side drain,Shoulders barm and road surface and Tipper for carriage of materials on various roads under Hatkoti Section
SH Construction of Eidge wall at Rd 0/00 to 0/015 and greeting at rds 0/00, Drain between km 0/00 to 0/600 and Parpets
Development surrounding the people tree in Purani Mandi W. No. 2
SH Removal of slips various RDs between km 0/000 to 1/120 AND P/L Kharanja stone soling at various RD between km 0/00 to 1/120 AND P/L Cross drainage works at RD 0/450 AND 0/480 AND C/O R/Wall at RD 0/110 to 0/120,0/265 to 0/275)
Sub Head- Formation Cutting at RDs 0/090 to 0/105 , 0/300 to 0/315, C/O R-B Wall in Km. 0/360 to 0/420, C/O 900MM Dia HPC at RD. 0/300, C/O U-Shape Drain in Km. 0/090 to 0/330, C/O V-Shape Drain in Km. 0/000 to 0/060 and P/L Cement Concrete Pavemen
Const.of 900mmdia Hume Pipe culvertat various RD with both side wing wall, V-Shape drain in Km 4/0 to 5/0, 7/0 to 8/0, U-Shape drain in Km 5/0 to 6/0 and 8/0 to 9/0 and wear.(WBM Grade-III) in Km 2/0to 11/510)R/wall at R.D. 3/210 to 3/220and 4/570to
SH Construction of Retaining wall providing and laying Interlocking paver block pavement alongwith construction of U and V shape drain etc. at various R.Ds between km. 15.200 to 18.200
SH ROFD in km 0/0 to 0300 Co V Shape drain alongwith Edge wall and Co 900mm dia RCC Hume Pipe Culvert at RD 0070 and RD 0285