Loading…
Loading…
8,346 results • Best match
C/o formation cutting 0/0 to 2/0, CC pavement at R.D.0/500 to 0/700 and 1/500 to 1/700, providing and laying Grading-I soling, Grading-II wearing and M/T in km.0/0 to 0/500 and 0/700 to 1/500 and construction of V-shape drain at R.D.0/500 to 0/750).
C/O R/wall at Rd. 4/960 to 4/980, 4/984 to 4/996, 5/015 to 5/030,5/300 to 5/315,9/00 to 9/020, P/L Bituminous concrete 30mm thick in km 4/00 to 5/00, 7/00 to 9/00,11/00 to 13/00( with paver finisher), V-shape drain at various Rds etc
C/o link road to village bathol km 0/0 to 2/745 (Sh P/L gr 1 11 111 premix carpet and seal coat in km 0/0 to 1/250 hume pipe culvert with wing wall at Rd 1/615 to 1/645, 1/720 to 1/745 and v shape drain in km 0/0 to 1/745 under SCCP
C/O R/wall at Rd , 0/840 to 0/860, 0/905 to 0/920 C/O B/wall at Rd 0/310 to 0/335 V-Shape drain in Km 0/00 to 1/200 , ROFD in km 0/00 to 1/200 and P/L GSB , WMM , M/T in Km 0/00 to 0/975 ) (under PDNA Head)
C/O Retaining wall at RD. 0/870 to 0/895 and 4/270 to 4/287, C/O Brest wall at RD 1/880 to 1/896, C/O Side drain with edge wall at various RDs and P/L CC Work in km. 3/650 to 3/790 and interlocking concrete blocks in km. 4/210 to 4/290
P/L cement concrete pavement at Rd. 0/520 to 0/600, 0/900 to 1/00, 1/400 to 1/430 (Actual Rd 1/380 to 1/460, R/wall at rd.0/589 to 0/616, 0/550 to 0/586,wire crate R/wall at rd 1/429.60 to 1/450 and V-shape drain at various rds) (Under PDNA)
SH- Construciton of Retaining wall at RD 3/890 to 3/910, 7/810 to 7/816, 9/285 to 9/292 and P.C.C. Breast wall at RD 4/165 to 4/205, 5/995 to 6/038, 8/375 to 8/381 and drain at RD 4/165 to 4/205, 5/400 to 5/432 and Providing and fixing grating e
Construction of V-Shape drain at RD 0/180 to 0/210 0/470 to 0/490 0/660 to 0/680 and 0/960 to 0/990 and Providing and laying interlocking Paver block at RD 0/190 to 0/205 and 0/470 to 0/480 on Link road to village Kehdroo km 0/0 to 1/0 VR-130
C/O 900mm dia hume pipe culvert at RD 0/075,C/O soild casueway RD 1/085 to 1/115, embankment filling kms 0/0 to 0/043, 0/067 to 0/180,U-shape drain with1mtr height edge wall RD 0/050 to 0/180,R/wall RD 0/052 to 0/060L/S 0/052 to 0/097RS 0/117to127
C/O R/wall/Edge wall at various RDs,P/L 900 mm dia RCC hume pipe culvert at Rd 0/430 , P/L CC Pavemant RD 0/120 to 0/140 0/160 to 0/180, P/L GSB, WMM M/T in between Km 0/00 to 0/500, V-shape Drain at various RDs) (under PDNA Head
C/O R/wall at various RDs, P/L CC Pavemant at RD 0/800 to 0/850 , 1/100 to 1/150, P/L GSB, WMM , M/T in Km 0/00 to 0/800, P/L 900mm dia RCC Hume pipe Culvert at RD 0/430 , V-shape Drain in km 0/00 to 0/100) (under PDNA Head)
C/O E/Wall at RD 0/010 to 0/016, 2/660 to 2/667 C/O R/Wall 0/784 to 0/798, 1/510 to 1/513.50, 1/880 to 1/891 and C/O U-Shape drain at RD 0/619 to 0/664 and P/L C.C. Pavement and 1 3 6 in Berms) (Under OFC)
powerloom lagam leather 1 5, powerloom lagam leather 1, power loom danda graree, handloom danda graree no36, handloom danda graree no 40, handloom danda graree no 42, handloom kangi 72 no36, handloom kangi 72 no40, handloom kangi 72 no42, handloom ... 1, nali 5, ...
Restoration of link road from Jingal Mod to Ghanufri via Kotla Katachi Km. 0/00 to 1/300 (SH C.o 900mm dia HPC Culverts at RD 0/030, 0/070 and 0/600, C/o R/wall at RD 1/090 to 1/110, B/wall at RD 1/005 to 1/015 (LHS), C/o CC Drain in Km. 0/00 to 0/90
C/o R/wall at RD 0/035 to 0/070, 0/195 to 0/225 and 0/430 to 0/465, V-shape drain in Km. 0/035 to 0/230, M.T. work in Km. 0/685 to 1/0 and P/L 1 4 8 and 1 2 4 in Km. 0/415 to 0/463 and 0/583 to 0/685)
C/O link road Bhatt Ki Hatti Durgapur Chayala Gurudwara in Km 0/00 to 2/600 (SH C/O 900mm dia RCC HPC at Rd. 0/200, 0/600, 0/750, 1/250, 1/400, 1/600,1/710 and 1/820, C/O PCC R/Wall at Rd. 0/00 to 0/030, P/L WBM Grading I and C/O unlined drain in
C/o retaining wall at RD 2/615 to 2/630), Breast wall at RD 2/870 to 2/886, Edge wall at RD 2/660 to 2/720, road side U and V shape drain at RD 2/450 to 2/750, C/o 600mm dia hume pipe hume pipe culvert at RD 2/565 and paver block at RD 3/015 to 3/640
P/L 25mm thick bituminous concrete in kms 0/0 to 3/0 and G-III with 20mm thick premix carpet in patches and U-Shape drain in kms 0/800 to 0/900 R/S and 1/500 to 1/590 L/S, 1/640 to 1/670, 2/600 to 2/640 R/S and 2/840 to 2/900 R/S.
C/O GSB, G-II and Premix carpet with seal coat at RD 2/0 to 2/900 C/O Retaining wall and B/Wall on various RD C/O HP culvert at RD 2/665 C/O U-shape drain at RD 2/120 to 2/525 and FC for bed correction at RD 2/600 to 2/670 2/705 to 2/810
ROFD 5/7 mtr wide road in between km 0/00 to 10/00, P/L 900mm dia hume pipe culvert at RD 3/240, 5/730 and 8/855, C/O R/wall, B/wall, GSB,WMM, V/U-shape drain, P/F crash barrier in between km 0/00 to 10/00, wire crate R/wall at RD 7/750 to 7/785, CC
Construction of Retaining wall at RD 2/435 to 2/445, 4/450 to 4/460, 5/675 to 5/685 and 6/345 to 6/360, 7/795 to 7/810 and 9/00 to 9/010 , Breast Wall at RD 4/00 to 4/010, U-Shape drain in Km 4/015 to 4/210 and 900 mm dia HPC at RD 14/360)
P/L cement concrete pavement at various Rds and C/O 900 mm dia RCC Hume pipe culvert at Rd 0/315 , P/L G.S.B, WMM Tarring in km 0/315 to 0/480, Edge wall at Rd 0/405 to 0/480 0/585 to 0/600 V-shape drain at rd 0/200 to 0/400 0/415 to 0/480) (Unde
/o B/wall in Km 0/670 to 0/855, R/Wall in Km 0/765 to 0/855, 0/200 to 0/215, Interlocking Paver Block Flooring in Km 0/545 to 0/865 0/000 to 0/250, TeuriGolpanga road Edge wall Drain in Km 0/100 to 0/150 and 1/400 to 1/600 and C/o 900mm dia Hu
SH C/O B/wall at RD 0/110 to 0/130, R/wall 0/120 to 0/126,1/770 to 1/785,3/710 to 3/722.50,4/101 to 4/108.50,3/800 to 3/815 3/830 to 3/837,M/T work 5/070 to 5/095 and Removal of Land slide Between KM 1/00 to 2/270 and C/o drain)
Construction of Retaining wall at RD 0/250 to 0/265, 0/300 to 0/310, 1/875 to 1/885, 4/875 to 4/890, 4/900 to 4/915, Breast wall at RD 4/950 to 4/965, unlined surface drain from 4/750 to 5/300 and 5/700 to 5/850 and 900 mm dia Hume pipe culvert at RD
at RD 0/495 to 0/540 , 1/330 to 1/420 0/540 to 0/630, Interlocking Paver block at RD 0/000 to 0/045, 0/045 to 0/330, 0/810 to 0/870 and Mohli to Rakkar bridge chowk at RD 0/000 to 0/075, H.P culvert at RD 0/030, 1/600 1/660 and P.F thermoplastic Ed
C/O B/wall at Rd 9/405 to 9/425, 9/600 to 9/645, 9/750 to 9/770, 10/600 to 10/645, 11/705 to 11/735, 11/810 to 11/835 R/wall at Rd 9/735 to 9/780, 11/705 to 11/720 P/L cement concrete pavement in Km 2/110 to 2/170, 2/210 to 2/230 U-Shape drain at
ROFD in km 0/800 to 1/250, P/L 900mm dia RCC Hume pipe Culvert at RD 1/680, C/O R/wall at various RDs, P/L CC Pavemant RD 0/00 to 0/060, P/L GSB, WMM M/T in between Km 0/00 to 0/500, U-shape Drain in km 0/600 to 0/800 1/750 to 2/00) (under PDNA
C/O R/Wall in km. 1/1500 to 1/155, C/O Edge wall with V-shape drain km. 1/300 to 1/450, 1/470 to 1/600 an 2/800 to 2/950, P/L CC work in km. 2/500 to 2/550, P/L Tack coat an 25mm thick bituminous concrete in km. 1/00 to 2/500 and 2/550 to 3/00
Construction of R/wall at R.D. 0/060 to 0/080, 8/015 to 8/035, B/wall at R.D. 1/120 to 1/135, 1/630 to 1/645, 3/950 to 3/965, 5/660 to 5/670, 6/380 to 6/390, 6/930 to 6/940, 8/015 to 8/025, 8/660 to 8/665, V-shape andU-Shape drain between Km 0/00 to
Construction of PCC V-Shape Drain from RD 8/000 to 9/000, C C Pavement at RD 0/780 to 0/825, 1/390 to 1/455, 1/500 to 1/560, 2/300 to 2/365, 2/750 to 2/800, 6/100 to 6/130 and 6/200 to 6/240 and PCC R/Wall at RD 4/050 to 4/070 and 4/250 to 4/270.
C/O B/wall at RD 1/500 TO 1/504 C/O R/wall at RD 1/795 to 1/797,1/979 to 1/984,1/990 to 1/996, 3/327 to 3/336 and C/O U-shape drain at RD 0/065 TO 0/165 and C/O RCC 1.00 mtr span slab culvert at RD 0/615 junction Chathami Road ) under SCA) PDNA 2023
B/w of F/C work at RD 2/320to2/380,2/490to2/550,C/O Ushape drain in bet. Km 2/150 to 2/350, C/O parap. in bet. Km 0/000 to 3/600, P/L CC pave. bet Km 3/240 to 3/465 and P/L tarring in bet. Km 2/150 in bet. Km to 2/750, 2/940 to 3/240.3/465to3/600
ROFD at Km 0/600 to 1/065, C/O R/wall at various Rds, P/L 900mm dia RCC Hume pipe culvert at Rd 0/150,0/300, 0/370 0/758, C/O wire crate R/wall at Rd 0/810 to 0/840, V-Shape drain at Rd 0/00 to 0/495 0/600 to 1/065 P/L GSB,WMM M/T in Km 0/600 to
C/O 1.00 mtr span RCC Slab Culvert at RD 3/350 and C/O 3.00 mtr span RCC Slab Culvert at RD 4/135 and P/L WBM G-II AN C.C. pavement at RD 3/300 to 3/400, 4/139 to 4/239, and crash barrier at RD 3/209 to 3/269 and C/O U-shape drain at RD 3/487 to 3/58
ROFD in km 1/540 to 2/060, C/O R/wall/B/wall at various RDs, P/L 900mm dia RCC Hume pipe Culvert at RD 1/680, P/L CC Pavement at RD 0/00 to 0/060, P/L GSB, WMM, M/T in km 1/540 to 2/060 U-shape Drain at RD 0/600 to 0/800, 1/750 to 2/00 on link ro
P/L cement concrete pavement at Rd 5/790 to 5/910 6/600 to 6/810, C/O V-Shape drain at Rd 4/900 to 5/080, 1/210 to 1/650, 3/340 to 3/625 6/750 to 7/00, C/O B/wall at Rd 1/510 to 1/535 2/940 to 2/960 P/L 900mm dia RCC Hume pipe culvert at Rd 5
C/O R/wall at RD 0/270 to 0/280, 0/285 to 0/295,B/wall 0/405 to 0/435, 0/465 to 0/485, 0/845 to 0/880, 0/890 to 0/910, 0/795 to 0/810, 0/825 to 0/840, U-shape drain with edge wall at 0/348 to 0/405, 0/980 to1/015,earth filling at RD 0/345 to 0/435